Western Copper And Gold Corporation · TSX:WRN

Western Copper And Gold — Investor Presentation (August 2026)

38 slides from Western Copper And Gold's investor presentation, August 2026

  1. Slide 1: Developing Canada's Largest Critical Minerals Project

    Developing Canada’s Largest Critical Minerals Project TSX. WRN NYSE American WRN Corporate Presentation | August 2026

  2. Slide 2: Cautionary notes

    Cautionary notes. The information provided in this presentation is not intended to be a exchange rates, projected capital and operating costs, continued availability of Note to U.S. Readers/Investors comprehensive review of all matters and developments concerning Western capital and financing, avail

  3. Slide 3: Clear investment thesis

    Clear investment thesis. One of the largest copper-gold projects globally Feasibility Study with robust economics & long mine life Strategic investments from Rio Tinto & Strong fundamentals Mitsubishi Materials for copper & gold Significant support for Advancing through critical minerals in Canada p

  4. Slide 4: Corporate overview

    Corporate overview. Capital Structure Ownership Research Coverage Listings Top Shareholders Analyst & Target Price TSX, NYSE American WRN Avg. Daily Value Traded (LTM) C$9.2M Michael Gray Rene Cartier NAVPS: C$52.83 Target Price: C$5.50 Financials (Jun 30, 2026) Cash & Investments C$128.7M Dalton Ba

  5. Slide 5: Building momentum

    Building momentum. Strengthened management & Board ESE Statement submitted in October 2025 New senior leadership team in place; Board additions Furthest the Casino Project has ever progressed in its assessment bring deep permitting and technical expertise and permitting pathway Alignment with Canada

  6. Slide 6: Strategic investments

    Strategic investments. The Casino Project has been endorsed by two of the most respected companies in the mining and materials value chain Both are active participants on Technical and Sustainability Committee, adding multidisciplinary expertise to project development (8.5% ownership) (5.0% ownershi

  7. Slide 7: Attractive commodity mix

    Attractive commodity mix. COPPER 7.6 Blbs + 3.1 Blbs 40% Copper (M&I) (Inferred) GOLD 3% US$5/lb Cu Silver US$3,500/oz Au 14.8 Moz + 6.3 Moz 12% US$19/lb Mo US$45/oz Ag (M&I) (Inferred) Molybdenum MOLY SILVER 45% Gold 791.2 Mlbs (M&I) 117.2 Moz (M&I) Project + 286.0 Mlbs (Inferred) + 52.3 Moz (Infer

  8. Slide 8: Simple and scalable

    Simple and scalable. MILL RESERVE HEAP LEACH RESERVE 1.22 billion tonnes CORE ZONE 209.6 million tonnes at 0.40% CuEq (P&P) at 0.28 g/t AuEq (P&P) RESERVE PIT SHELL CuEq (%) Mill Reserve underpins Casino’s initial 1.0 27-year mine life 0.8 0.6 Mill Reserve represents just one-third of 0.4 currently

  9. Slide 9: Closer look at the high-grade core zone

    Closer look at the high-grade core zone. 800 m x 500 m higher grade zone in the center of the deposit (primarily breccia geology) DDH21-07 DDH21-09 289.6 m at 1.01% CuEq 65.8 m at 2.53% CuEq Previous intercept of 689 m at 0.91% CuEq (from (from 36.6 m) (from 10.6 m) 9.1 m), incl. 100 m at 3.20% CuEq

  10. Slide 10: Attractive grade profile

    Attractive grade profile. Casino (Yr 1-4) – 174 Mt 0.26:1 CASINO PROJECT Casino (LOM) – 1.2 Bt 0.43:1 Gibraltar – 559 Mt TKO 1.49:1 Copper Mountain – 346 Mt HBM 5.56:1 OPERATING MINES Highland Valley – 209 Mt TECK 0.74:1 Mt. Milligan – 264 Mt CG 1.19:1 0.00% 0.10% 0.20% 0.30% 0.40% 0.50% 0.60% 0.70%

  11. Slide 11: Low strip ratio is a key advantage

    Low strip ratio is a key advantage. Grade Strip Ratio Strip-Adjusted Grade (% CuEq) (waste : ore) (% CuEq moved, ore + waste) MARA GLEN 0.77% Casino (Yr 1-4) 0.26 Casino (Yr 1-4) 0.52% Galore Creek TECK / NEM 0.69% Casino (LOM) 0.43 Reko Diq ABX 0.32% Casino (Yr 1-4) 0.66% Warintza SLS 0.53 Casino (

  12. Slide 12: Tier-one production profile

    Tier-one production profile. COPPER EQUIVALENT GOLD EQUIVALENT Key Metrics (2022 Feasibility Study) Year Year 1-4 229 kt / yr 1-4 1.1 Moz / yr C$3.6B 3.3-year Initial Capex Payback LOM 160 kt / yr LOM 747 koz / yr 27 years 0.43 : 1 Mine Life Strip Ratio Average Annual Production Year 1-4 Life-of-Min

  13. Slide 13: Robust economics with significant leverage

    Robust economics with significant leverage. Copper Price ($/lb) US$4.50 US$5.00 US$5.50 US$6.00 US$6.50 2022 FEASIBILITY STUDY NPV8% ($M) C$8,592 C$9,199 C$9,807 C$10,414 C$11,021 US$3,500 IRR (%) 37.7% 39.2% 40.6% 42.0% 43.4% BASE CASE ASSUMPTIONS Payback (yrs) 1.7 1.6 1.5 1.5 1.4 Cu Au US$3.60/lb

  14. Slide 14: De-risked through quick payback

    De-risked through quick payback. FCF (2022 FS) FCF (Consensus Pricing) Cummulative FCF (2022 FS) Cummulative FCF (Consensus Pricing) C$3.00 C$40.0 HIGH-GRADE Cummulative After-Tax Free Cash Flow (C$ billions) CORE Annual After-Tax Free Cash Flow (C$ billions) C$2.25 C$30.0 C$1.50 C$20.0 C$0.75 C$10.

  15. Slide 15: Large-scale copper development project benchmarking

    Large-scale copper development project benchmarking. Western Solaris McEwen Copper Hudbay Hudbay / Mitsubishi Project Casino Warintza Los Azules Cactus Copper World Country Elevation (masl) 1,250 1,200 3,400 430 1,600 Study 2022 FS 2025 PFS 2025 FS 2025 PFS 2023 PFS Mine Life (years) 27 22 21 22 20

  16. Slide 16: A clear value proposition

    A clear value proposition. Broker Consensus P / NAV (x) 1.13x 1.16x 0.83x 0.73x 0.57x 0.58x 0.48x 0.49x 0.39x 0.41x 0.34x 0.24x 0.27x 0.14x 0.15x 0.19x Surge Hot Chili Western Panoro ATEX Pecoy Solaris Northisle Marimaca Ivanhoe Osisko Trilogy Firefly Dev. Jr. Prod. Int. Prod. Copper Electric Metals

  17. Slide 17: Meaningful progress on infrastructure

    Meaningful progress on infrastructure. Casino Port of Access Skagway Road • Federal funding available for the • The Yukon signed MOU with construction of access road to Casino Municipality of Skagway to secure (Yukon Resource Gateway Project) tidewater access for mining industry • Construction of th

  18. Slide 18: Momentum for the Yukon-B.C. Grid Connect

    Momentum for the Yukon-B.C. Grid Connect. Green Power • Casino’s base case is LNG power • Federal and territorial governments committed C$53M to advance the Yukon-B.C. Grid Connect: connecting the isolated, capacity-constrained Yukon grid to the North American grid in B.C. • The Grid Connect (as par

  19. Slide 19: Project advancement

    Project advancement. ESE Statement submitted Submitted to YESAB in Oct 2025; published to public registry Sufficiency check (in progress) YESAB Executive Committee working to confirm ESE Statement Panel meets all required guidelines Review Panel established; Terms of Reference issued Panel members a

  20. Slide 20: Investor highlights

    Investor highlights. Multi-decade High-grade core Low-strip ratio copper and gold resource leads to quick payback drives attractive cost profile Improving Major Immense infrastructure endorsements scarcity value backdrop through gov’t initiatives and partnerships of similar projects TSX | NYSE Ameri

  21. Slide 21: Appendix

    Appendix. , P.E., P.Eng. TSX | NYSE American | WRN 21

  22. Slide 22: Management team

    Management team. Sandeep Singh Shena Shaw President & Chief Executive Officer Vice President, Environmental & Community Affairs • Former President & CEO of OR Royalties; led successful • Northern environmental assessment specialist. turnaround. • Deep knowledge of the Yukon Environmental and Socio-

  23. Slide 23: Board of directors

    Board of directors. Sandeep Singh President & Chief Executive Officer • Former President & CEO of OR Royalties; led successful turnaround. • Significant mining investment banking and M&A experience. YEARS OF EXP. +20 • B.Eng. (Concordia) and MBA (Oxford). Mark E. Smith P.E., P.Eng. Chairman • Engine

  24. Slide 24: Significant positive economic impact

    Significant positive economic impact. Over its entire lifecycle, the Casino Project is estimated to contribute: C$44.1 billion C$12.4 billion to Canada’s GDP in wages and salaries 125,260 C$12.8 billion full-time equivalent positions in taxes & royalties to various governments TSX | NYSE American |

  25. Slide 25: Attractive cost profile

    Attractive cost profile. Advantages resulting in lower operating costs include: Cash Costs + Ultra-low strip ratio, reducing waste tonnes moved and By-product Costs lowering hauling costs (the largest component of mining costs) Copper Cash Cost US$(0.80)/lb + Hilltop deposit supports single large-sc

  26. Slide 26: Feasibility study key operating metrics

    Feasibility study key operating metrics. Cash Flow & Production Profile Year 1-4 Life-of-Mine Cash Flow (Pre-tax) ($M) C$1,033 C$640 Cash Flow (After-tax) ($M) C$951 C$500 Average Annual Cash Flow & Costs Net Smelter Return ($/t milled) C$43.15 C$29.08 Operating Cost ($/t milled) C$11.16 Copper (Mlb

  27. Slide 27: Feasibility study operating costs

    Feasibility study operating costs. Unit Costs Life-of-Mine Milling ($/t ore milled) C$6.42 Mining ($/t ore milled) C$4.28 Milling Operation General & Administrative ($/t ore milled) C$0.46 Total ($/t ore milled) C$11.16 Heap Leach Operation ($/t leached) C$1.93 Heap Leach Operation ADR/SART ($/t lea

  28. Slide 28: Feasibility study capital costs

    Feasibility study capital costs. Projected Capital Costs Mining C$661M Processing C$915M Tailings and Water Management C$503M On-Site Infrastructure C$608M Pre-Production Off-Site Infrastructure C$90M Capital Indirect Costs C$431M Contingency (15%) C$369M Owner’s Costs C$41M Total Pre-Production Cap

  29. Slide 29: Copper project capital intensity

    Initial Capital Intensity (US$/t Avg. Annual CuEq) $0 $10,000 $15,000 $20,000 $25,000 $30,000 $35,000 $40,000 $5,000 Cascabel Horne 5 TSX | NYSE American | WRN Ambler Havieron San Nicolas Cotabambas Source: Wood Mackenzie. KSM Vizcachitas Canariaco Cerro Casale New Prosperity Feasibility Study Casin

  30. Slide 30: Mining

    Mining. Pit designs for five mining phases Komatsu 980E or similar were developed to produce 45.4 haul trucks (370 t class) Mtpa of mill feed ore Floating cone based on Mill material is limited to 1.2 Bt US$1.75/lb Cu, US$835/oz due to TMF capacity Au – very low prices as pit is constrained by TMF c

  31. Slide 31: Processing

    Processing. Milling Flotation Heap Leach 120,000 tpd Conventional copper/moly Conventional circuit crush/conveyer stack valley fill heap leach Medium–soft ore: BWi – 14.5 kWh/t; 200 µm Recoveries: 25,000 tpd primary grind Copper – 86%, Gold – 67%, Moly – 71%, Silver – 53% SART to remove copper from

  32. Slide 32: Property geology

    Property geology. CAP SOX SUS HYP Late Cretaceous Casino Suite Patton Porphyry Patton Porphyry Plug Intrusive Breccia Intrusive Breccia – Quartz Explosive Breccia Mid Cretaceous Whitehorse Suite Granodiorite 250 m Notes: Resource Shell is a conceptual floating cone pit for NI 43-101 reasonable prosp

  33. Slide 33: District map

    District map. TSX | NYSE American | WRN 33

  34. Slide 34: 2022 mineral reserve estimate

    2022 mineral reserve estimate. Mill Reserve NSR Copper Gold Moly Silver CuEq Copper Gold Moly Silver Class Mt (C$/t) (%) (g/t) (%) (g/t) (%) (Mlbs) (Moz) (Mlbs) (Moz) Proven 140.1 38.50 0.31 0.39 0.024 2.1 0.67 944 1.8 74.9 9.4 Probable 1,076.9 23.68 0.17 0.19 0.021 1.6 0.36 4,135 6.7 497.1 55.5 P&P

  35. Slide 35: 2022 mineral resource estimate

    2022 mineral resource estimate. Mill Resource NSR Copper Gold Moly Silver CuEq Copper Gold Moly Silver Class Mt (C$/t) (%) (g/t) (%) (g/t) (%) (Mlbs) (Moz) (Mlbs) (Moz) Measured 144.9 40.09 0.30 0.38 0.024 2.1 0.64 953 1.8 75.2 9.6 Indicated 2,114.2 20.34 0.14 0.16 0.015 1.4 0.29 6,493 11.1 716.0 93

  36. Slide 36: 2022 mineral resource estimate

    2022 mineral resource estimate. Total Resource (Mill + Heap Leach) NSR Copper Gold Silver Copper Gold Silver Class Mt (C$/t) (%) (g/t) (g/t) (Mlbs) (Moz) (Moz) Measured 188.2 36.34 0.24 0.40 2.2 1,005 2.4 13.3 Indicated 2,302.6 19.61 0.13 0.17 1.4 6,638 12.4 103.9 M&I 2,490.7 20.88 0.14 0.18 1.5 7,6

  37. Slide 37: Notes

    Notes. • Technical report entitled “Casino Copper-Gold Project, Form 43-101 F1 • NSR value for hypogene sulphide mill material is: • NSR value for supergene (SOX and SUS) mill material is: Technical Report Feasibility Study” dated June 13, 2022. o NSR (C$/t) = $73.81 x Cu (%) + $41.16 x Au (g/t) + $

  38. Slide 38: ir@westerncopperandgold.com

    ir@westerncopperandgold.com westerncopperandgold.com TSX WRN NYSE American WRN

Western Copper and Gold — Investor Presentation (August 2026) on 6ix