LCL Resources Limited · ASX:LCL

LCL Resources — Metminco — Shareholder Meeting (May 2017)

22 slides from LCL Resources's shareholder meeting presentation, May 2017

  1. Slide 1: Developing Gold Production in Colombia

    Metminco Limited Developing Gold Production in Colombia MAY 2017 Annual General Meeting 1

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation (the “Presentation”) is strictly confidential to the recipient and has been prepared by Metminco Limited (“Metminco” or the “Company”) based on the information available to it. It is intended solely for the information of the initial recipient of this presentation. Metmi

  3. Slide 3: Metminco - Value Proposition

    METMINCO - Value Proposition  GOLD: Advancing the Miraflores Project in Colombia with planned annual gold production of ~50,000oz/a  Feasibility Study on underground operation in progress and to be completed in 3RD Quarter 2017  Current plan to complete EIA and submit for approval by end December

  4. Slide 4: Gold: Summary - Quinchia Portfolio

    GOLD: Summary - Quinchia Portfolio • Purchase of Miraflores Compania Minera SAS (MCM) from RMB Resources Limited (“RMB”) completed 20 June 2016 • Mid Cauca belt highly prospective for gold, silver and copper – includes Quinchia Gold Portfolio and Anglogold Ashanti’s La Colosa Project (29 Moz gold) &

  5. Slide 5: Colombia - a significant Gold District

    COLOMBIA – a significant Gold District Quinchia Gold Portfolio located in highly prospective Mid Cauca Porphyry Belt which hosts world class gold deposits San Ramón 0.6 Moz: Red Eagle Gramalote 6.8 Moz Au: Anglo/B2 Gold Quinchia Portfolio 2.8 Moz: Metminco Buriticá 9.5 Moz Au: Continental Gold Marma

  6. Slide 6: Three Key Target Areas - Miraflores, Tesorito & Chuscal

    THREE KEY TARGET AREAS - Miraflores, Tesorito & Chuscal Miraflores Development Vertical Breccia Pipe Feasibility Study in Progress Tesorito Exploration Gold porphyry Step-out drilling Chuscal Chuscal Exploration Gold porphyry Grant of licence 6

  7. Slide 7: Miraflores Gold Project

    MIRAFLORES GOLD PROJECT METMINCO "eee ; METMINCO 7

  8. Slide 8: Miraflores - General aerial view of the project area

    MIRAFLORES – General aerial view of the project area 8

  9. Slide 9: Miraflores - Development Opportunity

    MIRAFLORES - Development Opportunity • Previous Feasibility Study work on Miraflores by SRK included: o Open Pit & Underground mining operation o Ore processing via gravity and float concentration followed by cyanide leaching. 62% of gold is recovered from gravity separation • Metminco subsequently

  10. Slide 10: Miraflores - Metallurgical Testwork

    MIRAFLORES - Metallurgical Testwork Gold Grade, g/t Au P80 Size Gravity Flotation Test No Sample ID (mm) Meas. Calc. Head Head 1st Cl 1st Cl Conc. Ro Tails Conc. Tails GF9 Lower Orebody Composite 102 2.27 3.99 2529.1 48.4 0.12 0.04 GF10 Upper Orebody Composite 102 2.05 3.01 2103.1 31.5 0.23 0.05 Gol

  11. Slide 11: Miraflores - Gold in Breccia

    MIRAFLORES - Gold in Breccia 11

  12. Slide 12: Miraflores - Plant Layout

    MIRAFLORES - Plant Layout METMINCO %

  13. Slide 13: Miraflores - Site Layout

    MIRAFLORES - Site Layout METMINCO METMINCO

  14. Slide 14: Miraflores - Optimisation of pre-production capital expenditure

    MIRAFLORES - Optimisation of pre-production capital expenditure Pre-production capital Capital (US$m) MNC (Sept 2016) Item RMB Optimisation by MNC (Feb 2015) Excludes Includes Contingency Contingency* No open pit – reduce environmental Pre-stripping 9.83 0 0 footprint Open Pit Mining Equipment 14.14

  15. Slide 15: Miraflores - Life of Mine Financials

    MIRAFLORES - Life of Mine Financials Reduction in LoM Capital & Improvement in IRR LoM Item Units RMB MNC MNC No Contingency Pre-Contingency Post-Contingency (Feb 2015) (Sept 2016) (Sept 2016) Mineral Material Processed kt 6,695 4,028 4,028 LoM Years 12 9 9 Gold Recovered koz 504 414 414 Silver Reco

  16. Slide 16: Miraflores - All-in Cash Costs (incl. Sustaining Capital)

    MIRAFLORES - All-in Cash Costs (incl. Sustaining Capital) Life of Mine all-in cash costs LoM Cash Costs (US$ per payable Au-oz) Item RMB (Feb 2015) MNC (Sept 2016) Open Pit 58.12 0 Underground Mining 213.49 338.87 Processing 201.70 150.61 Tailings 6.27 17.95 G&A 52.02 51.31 Refining Charges 4.69 0.7

  17. Slide 17: Miraflores - Sensitivity to gold price - SRK Mine Plan

    MIRAFLORES - Sensitivity to gold price - SRK Mine Plan (Sept 2016) Sensitivity to Gold Price Key Financial Indicators US$1,200/oz Au US$1,300/oz Au US$1,400/oz Au C1 Cash Costs (US$/oz Au) 603 607 611 AISC-costs (US$/oz Au) 643 647 651 EBITDA (LoM average US$/annum) 27.3 million 31.7 million 36.1 mi

  18. Slide 18: Comparison - Miraflores vs. San Ramon

    COMPARISON - Miraflores vs. San Ramon • Red Eagle’s San Ramon Mine north of Medellin is now in production after raising $60 million in debt and $20 million in equity early in 2015, and receiving the appropriate permits Parameter Miraflores San Ramon Parameter Miraflores San Ramon Mineral Resource (M

  19. Slide 19: Tesorito - Exploration Target

    TESORITO - Exploration Target • NNE-SSW striking dacite porphyry has been mapped • Limited exploration work has been conducted in the form of soil & rock geochemistry, geophysics (IP Survey) and drilling (3 DDH’s) • Focus of work to-date has only been on an area of some 20 Ha • Drilling has not been

  20. Slide 20: Tesorito - Early drilling and geophysics identified gold-copper porphyry system

    TESORITO - Early drilling and geophysics - identified a large scale gold-copper porphyry system • 800m from Miraflores, Tesorito is a porphyry system hosting Au/Ag/Cu/Mo mineralisation • Surface soils and IP anomaly covers an area of 500m by 700m • Minera Seafield drilled three high impact explorati

  21. Slide 21: Tesorito - Untested Potential of Gold-Copper Porphyry Complex

    TESORITO - Untested Potential of Gold-Copper Porphyry Complex 4.0m @ 3.1g/t Au 2.9m @ 3g/t Au 4m @ 2.9/t Au 0.70m @ 3.4g/t Au, 2.6% Cu & 311ppm Mo • IP anomaly has not been intersected and is yet to be tested, future exploration will be targeted at defining the extent of the anomaly • Near surface g

  22. Slide 22: Chuscal - Exploration Target

    CHUSCAL - Exploration Target Soil geochemistry has identified a substantial porphyry hosted gold target • Exploration target identified on basis of soil geochemistry and artisanal workings in excess of 176Ha • Channel sampling of artisanal underground workings has returned grades of up to 160g/t Au