DLP Resources, Inc. · TSXV:DLP
DLP Resources — Investor Presentation (December 2023)
30 slides from DLP Resources's investor presentation, December 2023
Slide 1: Copper & Base Metals Exploration in Cusco, Peru and British Columbia, Canada
Copper & Base Metals Exploration in Cusco, Peru and British Columbia, Canada Copper oxides High grade copper minerals Copper in rock – microscope view Copper in core sample Molybdenum rich veinlets Recent drill core from Aurora project in Peru TSXV:DLP : OTCQB:DLPRF www.dlpresourcesinc.com December
Slide 2: Forward Looking and Cautionary Statement
Forward Looking and Cautionary Statement Certain information contained in this document may be forward-looking statements or forward-looking information (referred to as “forward-looking statements”). Forward-looking statements are often, but not always, identified by the use of words such as “antici
Slide 3: Experienced Team with a Track Record of Exploration Success
Experienced Team with a Track Record of Exploration Success DLP - Management Summary David Leo Pighin – Renowned Sullivan Geologist # • Ian Gendall, CEO & President and Jim Stypula#, Executive Chairman & Director involved in copper-gold discoveries and have worked in the industry for over 32 years.
Slide 4: DLP Share Performance over 12 months & Structure
DLP Share Performance over 12 months & Structure As of December 30, 2023 Market Cap - 52 Wk Range $0.23 - $0.75 As of December 30, 2023: • ~$44 Million ISSUED & OUTSTANDING ISSUED 104,527,454 Warrants Outstanding @ $0.25 177,022 Warrants Outstanding @ $0.40 9,729,802 Warrants Outstanding @ $0.27 261
Slide 5: Project Locations
Project Locations 5 Projects in BC, Canada 2 Copper Projects in Peru Land Holdings of 81,383.21 Hectares: • 2 Porphyry Copper- Moly Projects in Peru. • 2 Stratiform Copper-Cobalt Projects in BC. • Sullivan style Zinc-Lead-Silver Projects in BC.
Slide 6: Aurora Porphyry Copper-Molybdenum Project Overview
Aurora Porphyry Copper-Molybdenum Project Overview Summary • Aurora is a porphyry copper-molybdenum project totaling 2200 Ha located 65km North of Cusco near the town of Parabamba in Southern Peru at an elevation of ~2000-3000m. Option on 400Ha - Aurora. • Bear Creek and Vena drilled 13 Holes (3,900
Slide 7: Peru: Aurora Project Earn in Agreement Summary
Peru: Aurora Project Earn in Agreement Summary 400Ha - Option DLP entered in to earn in agreement with a private Peruvian group (Parobamba II SMR) on May 14, 2021: 7500Ha - DLP ❖ To earn 100 % of the project for $3.0 M over 4 years payment ($75,000 on signing and $2.325M at the end). ❖ The Peruvian
Slide 8: Aurora Project – Magnetics-Analytic Signal & Historic Drillholes
Aurora Project – Magnetics-Analytic Signal & Historic Drillholes • A total of 43.8 line kilometers of Induced Polarization and Magnetics surveying were completed by Fugro for Focus Ventures. • Reported difficulties with signal penetration for the induced polarization survey in the lower elevations,
Slide 9: Aurora Project – New Extension to NE on Magnetics – Analytic Signal
Aurora Project – New Extension to NE on Magnetics – Analytic Signal
Slide 10: Aurora Project Geology with Historic and DLP Drillholes
Aurora Project Geology with Historic and DLP Drillholes Historical results from the only deep hole on Aurora, DDA-01 drilled to 604m by Vena Resources in 2005 • Historic included: results reported from the only deep hole on Aurora, DDA-01 drilled to 604m by Vena Resources ▪ 54m @ 0.48% Cu from 212 t
Slide 11: Aurora Project – Historic Drilling and DLP Drillholes
Aurora Project – Historic Drilling and DLP Drillholes 2022-2023 DLP Drilled 13 holes for a total of ~9,910.25m as of the end of December 2023
Slide 12: Aurora Project – 2022-2023 Drill Results (Table 1)
Aurora Project – 2022-2023 Drill Results (Table 1) Hole From To Interval1 Description Cu (total) Mo Ag Cueq* ID m m m % % g/t % A23-003 A23-001 22.45 145.8 123.35 Oxidized/Mixed 0.49 0.0036 4.2 0.51 Includes 100.35 145.8 45.45 Enriched 0.64 0.0017 3.4 0.65 100.35 124.3 23.95 Enriched 0.87 0.0024 3.4
Slide 13: Aurora Project – 2023 Drill Results A23-006 to A23-010 (Table 2)
Aurora Project – 2023 Drill Results A23-006 to A23-010 (Table 2) Hole From To Interval1 Description Cu (total) Mo Ag Cueq* A23-008 ID m m m % % g/t % A23-006 91 708.5 617.5 Mixed/Enriched/Primary 0.17 0.148 1.82 0.94 Includes 91 127 36 Mixed/Enriched 0.62 0.031 9.1 0.78 Primary (Molybdenum 321 708.5
Slide 14: Aurora Project – 2023 Drill Results A23-011 to A23-013 (Table 3)
Aurora Project – 2023 Drill Results A23-011 to A23-013 (Table 3) Hole From To Interval1 Description Cu (total) Mo Ag Cueq* A23-013 ID m m m % % g/t % Leached+Mixed & Primary A23-011 3.1 1081.7 1078.6 0.16 0.0606 1.69 0.49 Mineralization/Hornfels+Porphyry Mixed & Primary Includes 111 1081.7 970.7 0.1
Slide 15: Aurora Project – Drilling Schedule 2023-2024
Aurora Project – Drilling Schedule 2023-2024 September-December 2022 2022-2023: DLP has drilled thirteen holes for a total of ~9910.25m as of the end of December 2023 Feb – June 2023 Proposed Drilling 2024 2024 – Drill an additional 6-8 holes for a minimum of 8000m. July - Dec 2023
Slide 16: Aurora Project – NW-SE Section
Aurora Project – NW-SE Section Native Copper Molybdenite Green intervals are predominantly copper in Cu in Chalcocite CuEq*calculation and blue intervals are predominantly molybdenum in CuEq* calculation Refer to Tables 1,2 and 3 for full set of assay results and CuEq* calculations Cu in Chalcopyrit
Slide 17: Aurora Project – N-S Section
Aurora Project – N-S Section Native Copper Green intervals are predominantly copper in CuEq*calculation and blue intervals are predominantly molybdenum in CuEq* calculation Refer to Tables 1,2 and 3 for full set of assay results and CuEq* calculations Molybdenite Cu in Chalcocite Cu in Chalcopyrite
Slide 18: Aurora Porphyry Cu-Mo Project – Section WSW - ENE
Aurora Porphyry Cu-Mo Project – Section WSW - ENE ~685m WSW-1 A22-002 ENE-1’ A22-001 DDA-03 (Projected 70m north onto Section) (Projected 100m north onto A22-003 DDA-04 (Projected 200m north onto Section) 2800m Section) Porphyry + Hornfels + Breccia A23-007 A23-006 A23-005 A23-004 Refer to Tables 1,
Slide 19: Copper Supply Shortage in Next Years
Copper Supply Shortage in Next 7 Years Aurora Resource
Slide 20: Esperanza Porphyry Cu-Mo Project
Esperanza Porphyry Cu-Mo Project The Esperanza project is located ~35km SE of the Cerro Verde Mine in Arequipa, and; • less than 10km south of E29’s – Flor de Cobre Project, • 10km NE of the Arikepay porphyry copper-gold project of Candente, • ~20km NW of Hudbay porphyry project Map modified from Ge
Slide 21: Esperanza Porphyry Cu-Mo Project – 4600Ha
Esperanza Porphyry Cu-Mo Project – 4600Ha Copper oxide mineralization and ferrimolybdite (hydrous iron molybdate mineral) were discovered in outcropping andesitic rocks on the Esperanza property and further mapping and sampling will commence in 2024 Ferrimolybdite (hydrous iron molybdate mineral) Co
Slide 22: Sediment Hosted Stratiform Copper in BC - Canada
Sediment Hosted Stratiform Copper in BC - Canada • Sediment-hosted stratiform copper deposits are important sources of copper, cobalt, and silver and have accounted for approximately 20% of global copper production in recent years. • DLP has now acquired a significant land package along the most fav
Slide 23: Hungry Creek Project in Southeast BC, Canada
Hungry Creek Project in Southeast BC, Canada • Land position of 38,852.92 Ha • Middle Creston Quartzites with Copper Mineralization which is 2021 Drilling very similar to Revett Quartzites in Montana hosting copper deposits. 2022 Drilling • Very recent prospecting & drilling identified the potential
Slide 24: Copper Creek Project - SW British Columbia, Canada
Copper Creek Project - SW British Columbia, Canada Taken and modified from “Mark Rock Geochemistry Assessment Report 2018”
Slide 25: Copper Creek Project – 2023 Drill Program
Copper Creek Project – 2023 Drill Program EOH at 354.6m EOH at 485m EOH at 34m Completed drilling of 3 Drillholes for a total of 873.6m in 2023. Significant faulting was intersected in the holes and no significant copper mineralization was intersected. The drilling is being evaluated.
Slide 26: Base Metal “Sullivan” Style – SEDEX Zn-Pb-Ag Project in Southeastern BC
Base Metal “ Sullivan” Style – SEDEX Zn-Pb-Ag Project in Southeastern BC • Sullivan style Zinc-Lead-Silver Deposits are some of the largest known base metals deposits of metal endowments. Sullivan Mine in Kimberley, BC contained 160 million tons of ore containing 8 million tons of lead, 7 million to
Slide 27: Moby Dick-NZOU Titan MT resistivity plan at 0m elevation
Moby Dick-NZOU Titan MT resistivity plan at 0m elevation NZ23-01 currently at 1330m. To be continued in 2024.
Slide 28: Canada (SW British Columbia) – NZOU Project
Canada (SW British Columbia) – NZOU Project NZ23-01 • 2023 Drilling of NZ23-01 was collared in Middle Aldridge siltstones and was stopped at a depth of 1333m at the top of the Sullivan horizon due to Proposed 1500m permit restrictions from August 01 to September 30. The hole will be continued to 150
Slide 29: DLP Share Performance over 12 months & Structure
DLP Share Performance over 12 months & Structure As of December 30, 2023 Market Cap - 52 Wk Range $0.23 - $0.75 As of December 30, 2023: • ~$44 Million ISSUED & OUTSTANDING ISSUED 104,527,454 Warrants Outstanding @ $0.25 177,022 Warrants Outstanding @ $0.40 9,729,802 Warrants Outstanding @ $0.27 261
Slide 30: Thank You
Thank You TSXV:DLP : OTCQB:DLPRF www.dlpresourcesinc.com
DLP Resources — Investor Presentation (December 2023) on 6ix