TomaGold Corporation Class A · TSXV:LOT
TomaGold Corporation Class A — Investor Presentation (September 2013)
20 slides from TomaGold Corporation Class A's investor presentation, September 2013

Slide 1: TomaGold Corporation September 2013
hy | TOMAGOLD Corporation September 2013

Slide 2: Disclaimer
DISCLAIMER This presentation contains certain “forward‐looking statements”, including, but not limited to, statements regarding the Company’s strategic plans, timetables, the evolution of mineral reserves and resources, mine operating costs, capital expenditures, work programs, development plans, ex

Slide 3: Profile
PROFILE Gold mining exploration company listed on the TSX Venture Exchange (TSX-V: LOT) Owns six gold properties near known gold mining camps Main project: Monster Lake = high grade gold asset Experienced and financially-committed management and directors

Slide 4: Management and Directors
MANAGEMENT AND DIRECTORS David Grondin President and CEO, Director Maurice Giroux, Geo. VP Exploration, Director Martin Nicoletti, CPA, CGA CFO Roger Boucher, MBA, CPA, CA Director Robert Desjardins, Adm. A Director Vittorio Violo Director

Slide 5: Capital Structure
CAPITAL STRUCTURE Shares outstanding 55,751,008 Warrants 8,020,053 Stock options 4,175,000 Shares fully diluted 67,946,061 Price (52 weeks) $0.12 ($0.41 - $0.07) Market capitalization $6.7 million Cash $200,000

Slide 6: Monster Lake Portfolio
MONSTER LAKE PORTFOLIO Portfolio consists of three promising properties: Monster Lake Winchester Lac à l’eau jaune

Slide 7: Monster Lake Property
MONSTER LAKE PROPERTY Advanced-stage gold property 90% TomaGold NI 43-101 project with over 40,000 metres of drilling completed 114 claims covering 3,336 ha located near known gold camps Five major gold zones over 4.5 km gold corridor: 52, Mégane, 325, Annie and Eratix Strong high-grade go

Slide 8: 325 Zone Drilling Program
325 ZONE DRILLING PROGRAM Results from 2013 winter drilling program: • Strongest potential target to date as shown by previous exploration and drilling • 12 diamond drill hole program for a total of 5,000 m aimed at testing 325 gold zone at depth (from 170 m to 330 m), which has never been done by p

Slide 9: 325 Zone Longitudinal Map
325 ZONE LONGITUDINAL MAP High-grade potential at depth Drilling program confirmed that 325 zone is over 150 metres long along strike and extends to a vertical depth of 330 metres 325 zone remains open at depth 10 of 25 holes in 325 zone >10 g/t Au, while 17 of 25 holes > 5 g/t Au Program al

Slide 10: Best Drilling Results: 325 Zone
BEST DRILLING RESULTS: 325 ZONE Length Depth Section Hole (#) From (m) To (m) g/t Au (m) (m) 49.50 54.00 4.50 101.20 1100 E M-25-11 40 incl. 49.50 51.50 2.00 223.20 M-24-11 60.00 61.00 1.00 9.60 45 1150 E 993-95-50 84.60 85.75 1.15 5.04 60 M-10-18 80.00 83.00 3.00 6.70 63 M-38-11 96.00 99.00 3.00 7.

Slide 11: Best Drilling Results: 325 Zone
BEST DRILLING RESULTS: 325 ZONE Length Depth Section Hole (#) From (m) To (m) g/t Au (m) (m) M-37-11 103.00 105.00 2.00 19.40 87 M-44-11 125.00 127.00 2.00 8.40 97 M-12-50 160.60 162.15 1.55 4.50 115 1250 E M-13-94 226.50 231.80 5.30 11.50 187 M-13-93 244.35 250.20 5.85 33.60 217 M-13-95 288.40 295.

Slide 12: Annie Zone
ANNIE ZONE Bonanza-grade discovery in 2012 Hole M-12-60 returned gold grade of 237.6 g/t Au over 5.7 metres (from 69.0 to 74.7 metres) in the spring of 2012 Annie zone was tested along a 600-metre horizon (50 m step-out) to a maximum depth of 225 metres in the summer of 2012 Zone open along st

Slide 13: Best Drilling Results: Annie Zone
BEST DRILLING RESULTS: ANNIE ZONE Hole (#) From (m) To (m) Length (m) g/t Au Date 50.10 54.60 4.50 17.70 94-23 99.10 102.00 2.90 16.60 1994 125.90 126.60 0.70 11.60 M-12-60 69.00 74.70 5.70 236.60 Feb/2012 116.20 119.20 3.00 5.40 M-12-72 Jun/2012 116.20 117.70 1.50 8.10 M-12-72b 33.00 34.50 1.50 10.

Slide 14: Projected Bulk Sample
PROJECTED BULK SAMPLE High-nugget effect on Monster Lake’s main gold structures Bulk sample would enable TomaGold to have a more representative grade for the Monster Lake potential gold resource TomaGold plans to start a 10,000-tonne bulk sample in 2013: Milling facility available Preliminar

Slide 15: Metallurgical Scoping Study
METALLURGICAL SCOPING STUDY Strong results from preliminary metallurgical scoping study: • 45 kg composite sample collected from 325 zone drill core • Average gold head grade of 4.8 g/t Au • Gold recovery of up to 96.3% • Composite sample taken close to surface, containing mainly quartz, as well as

Slide 16: Winchester Property
WINCHESTER PROPERTY • 100% TomaGold • 20 claims covering 1,070 hectares located directly south to Monster Lake, on the same gold trend • Underexplored property (less than 3,000 metres drilled) • Exploration work shows notable thickening of felsic volcanoclastic unit, which is more than 90 m thick, w

Slide 17: Other Properties (100% TomaGold)
OTHER PROPERTIES (100% TomaGold) Lac à l’eau jaune (directly north of Monster Lake, Chibougamau) • 25 claims covering 1,395 hectares Lac Cavan (northwest of Monster Lake, Chibougamau) • 66 claims covering 3,670 hectares Urban Lake (near Eagle Hill’s Windfall project, Lebel-sur-Quévillon) • 58 claims

Slide 18: Why TomaGold?
WHY TOMAGOLD? Monster Lake is the most recent high grade gold discovery in eastern Canada Operating in one of the safest mining districts worldwide Access to all infrastructures (road, electricity, water, airport) and only 40 minutes from the mining town of Chibougamau Access to qualified wo

Slide 19: Summary
SUMMARY TomaGold holds a dominant land position around Monster Lake (Winchester and Lac à l’eau jaune properties) Latest drilling program confirmed that the 325 high grade zone is over 150 metres long along strike and extends to a vertical depth of 330 metres 96.3% gold recovery from prelimina

Slide 20: TomaGold Corporation contact
TOMAGOLD Corporation TSX-V: LOT David Grondin, President & CEO david.grondin@tomagoldcorp.com (514) 583-3490
Source: Internet Archive copy of tomagoldcorp.com
More decks from TomaGold Corporation Class A
Investor Presentation (October 2026)27 slides · October 2026
Investor Presentation (September 2026)27 slides · September 2026
Investor Presentation (July 2026)26 slides · July 2026
Investor Presentation (May 2026)25 slides · May 2026
Investor Presentation (April 2026)25 slides · April 2026
Investor Presentation (March 2026)25 slides · March 2026