Tomagold Corporation Class A · TSXV:LOT
Tomagold Corporation Class A — Investor Presentation (October 2026)
27 slides from Tomagold Corporation Class A's investor presentation, October 2026
Slide 1: Emerging Growth Opportunity in the Chibougamau Mining Camp
EMERGING GROWTH OPPORTUNITY IN THE CHIBOUGAMAU MINING CAMP TSXV: LOT OTCPK: TOGOF October 2026
Slide 2: Forward-Looking Statements
Forward-Looking Statements This presentation contains certain “forward-looking statements”, including, but not limited to, statements regarding plans, timetables, objectives, budgets, exploration programs, development plans, drilling results, mineral resources and reserves. Forward-looking statement
Slide 3: TomaGold: A Canadian Mineral Exploration Corporation
TomaGold A Canadian Mineral Exploration Corporation TomaGold Corp. (TSXV: LOT, OTCPK: TOGOF) is a Canadian junior mining company focused on the acquisition, exploration, and development of high-potential precious and base metal projects, with a primary focus on gold and copper in Quebec and Ontario.
Slide 4: Investment Thesis
Investment Thesis Why TomaGold, Why Now Massive Zinc-Gold Discovery at Berrigan 01 Berrigan Deep has been defined over more than 250 metres laterally and approximately 400 metres vertically with just 5 extension holes below the historical Berrigan Mine deposit A Proven, Re-Rating District 02 Chiboug
Slide 5: Chibougamau Projects: Location, Location, Location
Chibougamau Projects Location, Location, Location CA$329M Northern Superior acquired by IAMGOLD (December 2025) A$232M Cygnus Metals in the process of being acquired by Central Asia Metals (October 2026) CA$10M TomaGold market capitalization (September 30, 2026) Toma Gold Presentation | 2026
Slide 6: Berrigan Mine Zn-Au-Ag-Cu
Berrigan Mine ZN-AU-AG-CU Key Project o TomaGold holds an option to acquire a 100% interest from Chibougamau Independent Mines o The Berrigan Mine property consists of 16 claims totalling 483 hectares (4.83 km2), located 4 km NNW of Chibougamau, Québec, Canada o Berrigan Mine has a historical resour
Slide 7: Zinc Strategic Importance
Zinc STRATEGIC IMPORTANCE Industrial, Defense & High-Tech Corrosion Protection & Infrastructure o Roughly 50% of global zinc demand goes to galvanizing steel — the primary defense against corrosion o Essential to construction, automotive, shipbuilding and public infrastructure worldwide Recognized C
Slide 8: Zinc Market 2026 Outlook
Zinc Market 2026 OUTLOOK Tight Supply, Resilient Demand US$3,860/t 14.0 Mt LME zinc price 2026E global refined zinc demand September 2026 forward (+1.3% y/y) 19K–80K t ~50–60% Projected 2026 global refined zinc Share of global zinc smelting capacity deficit concentrated in China (ILZSG / Wood Macken
Slide 9: Berrigan Mine: 2025 Phase I Drilling Program
Berrigan Mine ZN-AU-AG-CU 2025 Phase I Drilling Program December 2025 – March 2026: Main results from the 2025 Phase I diamond drilling program totalling seven holes for 3,098 metres, including several wide and high-grade zinc and gold equivalent intersections: Hole TOM-25-009 o From 156.70 m: 48.05
Slide 10: Berrigan Mine: 2026 Borehole EM Survey
Berrigan Mine ZN-AU-AG-CU 2026 Borehole EM Survey February 2026: Borehole EM survey confirms Berrigan Deep Zone. The survey also validates significant mineralization and unlocks new drilling targets. o Direct correlation with mineralization: The modeled geophysical plates explain the presence of sem
Slide 11: Berrigan Mine: 2026 Phase II Drilling Program
Berrigan Mine ZN-AU-AG-CU 2026 Phase II Drilling Program July - September 2026: o Berrigan Deep is rapidly growing in scale: with just five Phase 2 extension holes, TomaGold has defined the zone over more than 250 metres laterally and 400 metres vertically, while pushing exploration to a record dept
Slide 12: Berrigan Mine: 2026 Phase II Drilling Program
Berrigan Mine ZN-AU-AG-CU 2026 Phase II Drilling Program TomaGold Presentation | 2026 | 12
Slide 13: Berrigan Mine: Pending 2026 Geophysics + Prospecting Results
Berrigan Mine ZN-AU-AG-CU Pending 2026 Geophysics + Prospecting Results Summer 2026: Completed following geophysical surveys and prospecting to identify priority drill targets: o Borehole electromagnetic (BHEM) survey in holes TOM-25-010, TOM-25-012 and TOM-25-015 to detect off-hole conductors and i
Slide 14: Obalski Au-Cu-Ag Key Project
Obalski AU-CU-AG Key Project 100% 75 / 2,724 ha 9 78,000 m Ownership Claims / Land Package Mineralized Zones Total Drilled (542 holes) LAND POSITION & INFRASTRUCTURE o TomaGold owns 100% of the Obalski property, 2 km south of Chibougamau, Québec o 75 claims covering 2,724 hectares (27.24 km²), hosti
Slide 15: Obalski: High-Grade Gold-Copper Intersections
High-Grade Gold-Copper Intersections Obalski AU-CU-AG Hole Au Ag Cu Length Zone Depth (g/t) (g/t) (%) (m)* (m) Historical Results and Potential OBS-17-002 10.25 42.15 7.80 3.10 A 95 OBS-20-001 12.45 17.70 0.53 0.65 C 93 OBS-20-002 67.10 40.10 2.32 0.50 A 205 o Several drilling programs completed (20
Slide 16: Radar Au-Ag-Cu-Zn
Radar AU-AG-CU-ZN Key Project o TomaGold holds an option to acquire a 100% interest from SOQUEM o The Radar property consists of 14 claims totalling 7.75 km2 located 3 km north of Chibougamau. The property contains the northern extension of the epigenetic fracture system hosting the copper-gold stru
Slide 17: Dufault Au-Cu-Zn
Dufault AU-CU-ZN Key Project o TomaGold holds an option to acquire a 100% interest from SOQUEM o The Dufault property consists of 14 claims totalling 5.22 km2 located 5 km north of Chibougamau, and has excellent potential for Au-Cu porphyry mineralization o The MOP-II deposit on the adjacent Roger p
Slide 18: Other Chibougamau Projects
Other Chibougamau Projects Promising Exploration Results OWNERSHIP NAME NOTES o 48 claims totalling 2,120 ha o 2013 NI 43-101 resource estimate for the property's main deposit shows indicated resources of 97,200 Brosman tonnes at 1.65 g/t Au, 10.5 g/t Ag and 0.35% Cu, and inferred resources of 6,300
Slide 19: Chibougamau Key Drivers
Chibougamau Key Drivers Building Shareholder Value WELL-ESTABLISHED CHIBOUGAMAU MINING CAMP o Proven Cu-Au (Ag-Zn) district with 19 deposits mined from 1958-2008 o Renewed exploration and drilling activity in recent years with solid results o Easy access to mining equipment, infrastructure and skill
Slide 20: Leadership Team
Leadership Team Backed by Solid Technical and Advisory Team DAVID GRONDIN MARTIN NICOLETTI, CPA, CGA President and Chief Executive Officer Chief Financial Officer David is a seasoned mining financial Martin is the founder of SKTM Financial Corp., entrepreneur and developer with over 25 years and a c
Slide 21: Capital Structure
Capital Structure Solid Mining Partners CA$0.03 ~CA$10M CA$0.11-0.02 Share price Market capitalization 52-week trading range 312.3M 345.2M 51% Fully diluted Institutional ownership, Shares outstanding (incl. 15.2M options, 17.7M warrants) incl. 8.9% by IAMGOLD Capital structure as of September 30, 2
Slide 22: Near-Term Catalysts
Near-Term Catalysts A Steady Cadence of News Flow NEXT Results and reports DEC 2025 pending for BHEM, IAMGOLD acquires FEB 2026 JUL 2026 UTEM and AMT Northern Superior for Borehole EM survey Phase 2 drilling surveys, and regional CA$329M — camp confirms the Berrigan completed; first 2 of 5 prospecti
Slide 23: Other Projects
OTHER PROJECTS Star Lake (lithium) Brisk Extension (lithium/REE) Baird (gold)
Slide 24: Star Lake REE Project
STAR LAKE REE Project o TomaGold holds a 100% interest in 214 claims (10,906 ha or 109 km2) in the James Bay area in Québec, Canada o Grab sample of 3.95% TREO (18,974 ppm Ce2O3, 10,849 ppm La2O3, 5,369 ppm Nd2O3, 1,931 ppm Pr2O3, 902 ppm Sm2O3, 184 ppm Dy2O3, 15 ppm Eu2O3, 511 ppm Gd2O3, 27 ppm Ho2
Slide 25: Brisk Extension Lithium/REE Project
BRISK EXTENSION Lithium/REE Project o TomaGold holds a 100% interest in 107 claims (5,487 ha or 55 km2) in the James Bay area, in Québec, Canada o The property is located near Zones 1, 2, 3 and 6 of Monger Gold’s Brisk project, and on the same geological corridor as the Cancet (5.6% Li2O over 36.5 m
Slide 26: Baird JV Gold Project
BAIRD JV Gold Project o TomaGold holds a 24.5% interest in the property, with New Gold holding a 24.5% interest and Evolution Mining (operator), owning the remaining 51% interest o The Baird property lies in the central Red Lake gold belt six kilometres north of the Madsen Mine and fourteen kilometr
Slide 27: Emerging Growth Opportunity in the Chibougamau Mining Camp
EMERGING GROWTH OPPORTUNITY IN THE CHIBOUGAMAU MINING CAMP TSXV: LOT OTCPK: TOGOF For more information, please contact: David Grondin, President & CEO david.grondin@tomagoldcorp.com (CA +1) 514-583-3490 www.tomagoldcorp.com