  1. Slide 1: Building a Growing West Australian Gold Producer

    BUILDING A GROWING WEST AUSTRALIAN GOLD PRODUCER Laverton-Menzies Feasibility Study Advancing TARGET200 Growth Strategy Shareholder & Investor Webinar Presentation July 2025

  2. Slide 2: Important Notices & Disclaimers

    Important Notices & Disclaimers Important Notices This presentation (Presentation) has been prepared by Brightstar and has been authorised for release by the Board of Directors of Brightstar on the basis it is to be read in conjunction with these important notices and disclaimers. This Presentation

  3. Slide 3: Important Notices & Disclaimers – Feasibility Study Cautionary Statement

    Important Notices & Disclaimers Feasibility Study - Cautionary Statement Menzies and Laverton Gold Project Feasibility Study • The production targets and forecast financial information disclosed in this presentation were first announced in accordance with ASX Listing Rules 5.16 and 5.17 in the Compa

  4. Slide 4: TARGET200 Advancing Multi-Hub Production Growth

    TARGET200 Advancing Multi-Hub Production Growth Focus on ‘mineable ounces’ and near-term growth - Laverton-Menzies DFS outlines ~70kozpa production, Sandstone PFS planned for 1H CY26 Portfolio Endowment Advanced Near-Term DFS Development Operations Mineral Resources1 Ore Reserves2 Exploration Develo

  5. Slide 5: Laverton-Menzies DFS Outcomes

    Laverton-Menzies DFS Outcomes Production - Path to TARGET 200 7 5 Year Production Plan: Peaking at 91koz p.a. averaging ~70koz p.a. over 5 years • 365koz mined over 6 years (including current Second Fortune & Fish UG Ore Reserves) 1 Existing Laverton Ops (SF UG + Fish UG) Menzies Laverton Sandstone

  6. Slide 6: Laverton-Menzies DFS Outcomes

    Laverton-Menzies DFS Outcomes Total Material Processed LOM Gold Produced Laverton Plant Throughput1 Open Pit: 5.1Mt @ 1.6g/t Au 339koz over 5 years 1.0Mtpa Underground: 1.3Mt @ 2.6g/t Au Physicals Average Annual Production C1 Cash Cost2 Group AISC2 ~70koz p.a. $2,388/oz $2,991/oz SPOT CASE $5,000/oz

  7. Slide 7: Laverton-Menzies DFS

    Laverton-Menzies DFS Ramping up production Second Fortune underground mine | 7

  8. Slide 8: Laverton-Menzies DFS Stage 1 - Overview

    Laverton-Menzies DFS Stage 1- Overview Stage 1: Conservative, de-risked focus on near-term development, mineable ounces and free cash flow generation and growth. Group Production Menzies DFS Laverton DFS Existing Laverton Ops (SF & Fish UG Ore Reserves Only) • Two mining project areas: 100 Gold (koz

  9. Slide 9: Timeline - Key Catalysts

    Timeline - Key Catalysts CY 2025 2026 2027 2028 DRILLING & RESOURCES Diamond Drilling: Laverton & Menzies Metallurgy, Geotech & Extensions Sandstone Reverse Circulation Drilling: Sandstone, Laverton & Menzies – Continuous drilling Resource Definition & Exploration Laverton Group MRE Group MRE Group

  10. Slide 10: DFS Funding Strategy – Significant Optionality

    DFS Funding Strategy – Significant Optionality Brightstar continues to optimise its funding strategy ahead of targeted FID for Laverton development in Q4CY25 Staged Investment Decisions:  Brightstar remains well funded with cash of A$15M and available working capital, in addition to operational min

  11. Slide 11: Laverton Hub

    Laverton Hub New 1.0Mtpa Mill + Open Pit Developments Fish underground operation

  12. Slide 12: Laverton Hub Underpins Sustained Production Growth

    Laverton Hub Laverton Hub Underpins Sustained Production Growth Existing FY26 underground production complemented by open pits developments processed via an expanded 1.0Mtpa Brightstar Processing Plant • Laverton Hub JORC Mineral Resource1: 857koz at 1.7g/t Au • Current FY26 underground production:

  13. Slide 13: Second Fortune & Fish Underground Operating Mines

    Laverton Hub Second Fortune & Fish Underground Operating Mines SECOND FORTUNE MINE Combined operational run rate target: 25kt per month @ +3g/t Au (~35koz p.a.) In-house underground mining expertise: • High-grade, narrow vein gold mine Brightstar utilises an ‘owner-operator model’ with our own fleet

  14. Slide 14: Lord Byron Open Pit | CY26 Open Pit Mining Targeted

    Laverton Hub Lord Byron Open Pit | CY26 Open Pit Mining Targeted Lord Byron Open Pit – 0.3Moz Au MRE on granted Mining Lease Mining targeted to commence CY261 • JORC Mineral Resource of 5.2Mt @ 1.5g/t Au for 251koz Au2 • Stage 1 Ore Reserves: 1.3Mt @ 1.4g/t Au for 59koz1 o Pit design completed on Or

  15. Slide 15: Cork Tree Well Open Pits | Open at Depth and Along Strike

    Laverton Hub Cork Tree Well Open Pits | Open at Depth and Along Strike Cork Tree Well – 0.3Moz Au along 3km of strike on granted Mining Lease • JORC Mineral Resource of 6.5Mt @ 1.4g/t Au for 292koz Au1 • Stage 1 Ore Reserves: 1.4Mt @ 1.7g/t Au for 76koz2 o Pit design completed on Ore Reserves only o

  16. Slide 16: 1.0Mtpa Laverton Mill – Brightstar-owned infrastructure

    Laverton Hub 1.0Mtpa Laverton Mill – Brightstar-owned infrastructure • Como Engineers have delivered a DFS-level (+/- 15%) design and cost CAPITAL COST ESTIMATE Total estimate for a new 1.0Mtpa CIL processing plant in Laverton Area A$M • Conventional 1Mtpa CIL design delivering ave. Opex of A$31.75/

  17. Slide 17: Menzies Hub

    Menzies Hub Open pit mining targeted early CY26 Lady Shenton open pit

  18. Slide 18: Lady Shenton to add open pit ounces in CY26

    Menzies Hub Lady Shenton to add open pit ounces in CY26 Menzies presents valuable opportunity to generate +$140M of free cash within 3 years with $14M of Capex required • Menzies Hub Mineral Resource Estimate: 589koz @ 1.4g/t Au2. Historical mining: +800koz @ 19g/t Au3 • Well located adjacent to the

  19. Slide 19: Lady Shenton Open Pit | 1H CY26 Production Target

    Menzies Hub Lady Shenton Open Pit | 1H CY26 Production Target Lady Shenton Open Pit Mine • JORC Mineral Resource of 5.6Mt @ 1.5g/t Au for 273koz Au1 on granted Mining Leases • Stage 1 Ore Reserves – 1.4Mt @ 1.7g/t Au for 80koz2 o Pit design completed on Ore Reserves only o Optimised at A$3,500/oz us

  20. Slide 20: Yunndaga | Set to be Brightstar's next Underground Mine

    Menzies Hub Yunndaga | Set to be Brightstar’s next Underground Mine Yunndaga Underground Mine • JORC Mineral Resource of 3.4Mt @ 1.4g/t Au for 156koz Au1 (inclusive of lower grade open pit MRE) on granted Mining Leases • Current study assessment: +/- 30% o Ongoing drilling and technical work underwa

  21. Slide 21: Sandstone Hub

    Sandstone Hub Scaling up the size of the opportunity Montague drilling campaign

  22. Slide 22: Existing Sandstone Project – 1.5Moz with upside

    Sandstone Hub Existing Sandstone Project – 1.5Moz with upside ~80km drilling program in CY25 targeting Mineral Resource upgrades to set platform for PFS delivery in 1H CY26 • Sandstone Hub Mineral Resource1: 1.5Moz @ 1.5g/t Au • Establishment of a district-scale opportunity and large Mineral Resourc

  23. Slide 23: Sandstone provides centralised critical mass

    Sandstone Hub Sandstone provides centralised critical mass Shallow +1Moz endowment provides foundation for long-life open pit production centre • Strategic landholding of +740km2 of the well-endowed Sandstone Greenstone Belt • +1Moz @ 1.4g/t Au in shallow Mineral Resources on granted mining licenses

  24. Slide 24: Quantifying the size of the Sandstone opportunity

    Sandstone Hub Quantifying the size of the Sandstone opportunity Sandstone Gold Project accelerating towards production → potential to become new long-life production centre in Western Australia’s goldfields1 Mill throughput (Mtpa) vs mill feed head grade (g/t Au)1 Aspirational development timeline1

  25. Slide 25: 12 Month outlook - platform set for organic growth

    12 Month outlook - platform set for organic growth TARGET 200 – Advancing multi-hub production growth Laverton-Menzies DFS establishes production path to Value Accretive Deals ~70koz p.a. Continued mining operations at Second Fortune and Continue to assess strategic accretive deals Fish undergrounds

  26. Slide 26: Appendices

    Appendices Historic Beta Open Pits

  27. Slide 27: Corporate Snapshot

    Corporate Snapshot Key Metrics ($AUD) Shareholders Share Price Performance Linden Board $0.49 Founders 2% 3% Gateway 4% 0.80 6.00 Share Price St Barbara 6% 0.70 $232M Genesis 2% 5.00 Market Capitalisation 0.60 Share Price ($/share) Volume (m shares) ~$19M 0.50 4.00 Average Monthly Liquidity 3.0Moz H

  28. Slide 28: Appendix 1: Brightstar execution team

    Appendix 1: Brightstar execution team ANDREW RICH DEAN VALLVE LEWIS CATLIN MATHEW LLOYD EXECUTIVE DIRECTOR - OPERATIONS CHIEF DEVELOPMENT OFFICER MINE MANAGER – JASPER HILLS MINE MANAGER – SECOND FORTUNE Mine Development & Joined Brightstar June 2024 Joined Brightstar May 2023 Joined Brightstar June

  29. Slide 29: Appendix 2: Laverton & Menzies Mineral Resources

    Appendix 2: Laverton & Menzies Mineral Resources LAVERTON Cut-off Measured Indicated Inferred Total g/t Au kt g/t Au koz kt g/t Au koz kt g/t Au koz kt g/t Au koz Alpha 0.5 - - - 371 1.9 22 1,028 2.8 92 1,399 2.5 115 Beta 0.5 345 1.7 19 576 1.6 29 961 1.7 54 1,882 1.7 102 Cork Tree Well 0.5 - - - 3,

  30. Slide 30: Appendix 3: Montague East Mineral Resources

    Appendix 3: Montague East Mineral Resources Location Cut-off Measured Indicated Inferred Total g/t Au kt g/t Au koz kt g/t Au koz kt g/t Au koz kt g/t Au koz Montague-Boulder 0.6 - - - 0.5 4.0 67 2.6 1.2 96 3.1 1.6 163 Whistler 0.5 - - - - - - 1.7 2.2 120 1.7 2.2 120 Evermore 0.6 - - - - - - 1.3 1.6

  31. Slide 31: Appendix 4: Sandstone Mineral Resources

    Appendix 4: Sandstone Mineral Resources Location Cut-off Measured Indicated Inferred Total CONSTRAINED (April 2023) g/t Au Mt g/t Au koz Mt g/t Au koz Mt g/t Au koz Mt g/t Au koz Lord Nelson 0.5 - - - 1.5 2.1 100 3.5 1.4 163 5.0 1.6 263 Lord Henry 0.5 - - - 1.6 1.5 77 0.3 1.2 13 1.9 1.4 90 Vanguard

  32. Slide 32: Appendix 5: Ore Reserves

    Appendix 5: Ore Reserves Location Proved Probable Total Ore Reserves – Open Pits1 kt g/t Au koz kt g/t Au koz kt g/t Au koz Cork Tree Well (DFS) - - - 1,374 1.7 76 1,374 1.7 76 Lord Byron (DFS) 296 1.6 15 964 1.4 44 1,261 1.4 59 Laverton Ore Reserves (OP) 296 1.6 15 2,338 1.6 120 2,635 1.6 135 Lady

  33. Slide 33: Appendix 6: Laverton-Menzies DFS - Physicals

    Appendix 6: Laverton-Menzies DFS - Physicals Stage 1: Gold production of 339koz at an AISC of $2,991/oz over the life of mine Laverton-Menzies DFS Unit Laverton Menzies Total • LOM production underpinned by 70% production of ounces from Measured Stage 1 and Indicated Mineral Resources Key Production

  34. Slide 34: Appendix 7: Menzies Gold Project – DFS Physicals

    Appendix 7: Menzies Gold Project – DFS Physicals Mining at Lady Shenton to commence early CY26 with MoU executed for processing at Paddington Processing Plant Menzies Ore Mined Lady Shenton Aspacia Link Zone Lady Harriet • Menzies Gold Project produces 2.1Mt at 1.5g/t Au recovering 105koz over 1,000

  35. Slide 35: Appendix 8: Laverton Gold Project – DFS Physicals

    Appendix 8: Laverton Gold Project – DFS Physicals Lord Byron and Cork Tree Well Open Pit Mines → 1.0Mtpa CIL central processing facility Laverton Ore Mined Lord Byron Yunndaga (Menzies mine) Cork Tree Well Alpha • Laverton Gold Project produces 4.3Mt at 1.9g/t Au recovering 234koz Au 1,600 • Operati

  36. Slide 36: Appendix 9: Key Study Outcomes – Costs & Sensitivity

    Appendix 9: Key Study Outcomes – Costs & Sensitivity Laverton-Menzies DFS Sensitivity Analysis $m Stage 1 Capital Costs Gold price (+/- 10%) Pre-Production 14 Growth Capex (incl. Laverton Mill) 209 Sustaining Capex 139 Opex (+/- 10%) Total Capex 362 Peak funding requirement (Spot Case) 120 Peak fund

  37. Slide 37: Appendix 10: Montague East adds strategic ounces

    Sandstone Hub Appendix 10: Montague East adds strategic ounces • Total Mineral Resource of 10Mt @ 1.6g/t Au for 526koz on granted mining licenses • Located 70km NNE of Sandstone town along the Sandstone-Wiluna Road • Over 70% of the Mineral Resources are within the top 100m of surface • Largely oxid

  38. Slide 38: Appendix 11: Exploration history highlights upside

    Sandstone Hub Appendix 11: Exploration history highlights upside PFS to be delivered 1H CY26 → to delineate step out drilling targets for DFS and pathway to production Historical Context Sandstone Project area annual drill metres Montague Project area annual drill metres AUD Gold Price Sandstone His

  39. Slide 39: Thank you

    Thank you Brightstar Resources Limited ASX:BTR Contact: info@brightstarresources.com.au (08) 6146 6268