Cokal — Investor Presentation (August 2012)

21 slides from Cokal's investor presentation, Aug 6, 2012

  1. Slide 1: Investor Presentation August 2012

    For personal use only Investor Presentation August 2012

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only This presentation has been prepared by the management of Cokal Limited (the Company) in connection with meetings with institutional investors, for the benefit of brokers and analysts and not as specific advice to any particular party or person. The information is bas

  3. Slide 3: Our Focus

    OUR FOCUS For personal use only ¾ Building A Global Metallurgical Coal Business ¾ Positive and Agile Decision Making ¾ Respect for all Stakeholders ¾ Ethical Decision Making ¾ Technical Skills for Innovative Solutions ¾ Results Orientated 3

  4. Slide 4: Strong Board - Coal Pedigree

    STRONG BOARD COAL PEDIGREE For personal use only Peter Lynch - Executive Chairman, Mining Engineer, 25 years experience in mining; MIM, Shell Coal, MacArthur Coal, Open Cut & Underground, TSX and ASX:WCI. Pat Hanna - Executive Director, Geologist, over 30 years experience all coal; Globally consulti

  5. Slide 5: Diverse and Experienced Management

    DIVERSE AND EXPERIENCED MANAGEMENT For personal use only Duncan Cornish – Joint Company Secretary, Chartered Accountant, Ernst & Young and PWC; Successful IPO and RTO record on ASX, TSX and AIM listed companies including TSX – WCI, WCB; AIM – SLG; ASX–DGR, PGM, MET, BOW, WCI, SA, SMR. Chris Turvey –

  6. Slide 6: Executive Summary

    EXECUTIVE SUMMARY For personal use only Cokal Limited (CKA) COKAL CAPITAL • Listed on the ASX in December 2010 STRUCTURE • Developing Metallurgical Coal Projects in Central Kalimantan AS AT 02 August 2012 • Objective: Metallurgical coal producer by H1 FY2014 ASX Code CKA Bumi Barito Mineral Project

  7. Slide 7: Project Locations - Indonesia

    PROJECT LOCATIONS – INDONESIA For personal use only 7

  8. Slide 8: Project Locations - Central Kalimantan, Indonesia

    PROJECT LOCATIONS - Central Kalimantan, INDONESIA For personal use only 8

  9. Slide 9: Central Kalimantan, Indonesia

    Central Kalimantan INDONESIA For personal use only Four tenements and company structure: ƒ BBM – 60/40 shareholding through PMA company ownership of IUP with local owner. 19,920 ha straddles the Barito River, with outcrops that have bright coal. Drilling and lab analysis confirm metallurgical coal –

  10. Slide 10: Central Kalimantan, Indonesia cont.

    Central Kalimantan, INDONESIA cont., For personal use only ƒ BBP – 60/40 with local owner, PMA company ownership structure. 13k ha directly adjacent to BHP, Maruwai. Has bright coal seam outcrops, laboratory tests indicate low in-situ ash, low sulphur, ultra-low phosphorous and high energy ¾2 drill

  11. Slide 11: BBM - 77Mt Indicated and Inferred Resource

    BBM – 77MT INDICATED AND INFERRED RESOURCE For personal use only Resources by seam Resources by depth Seam Indicated Inferred Total Indicated Inferred Total Seam Depth Range Thickness Resources Resources Resources Resources Resources Resources Name (m) (m) (Mt) (Mt) (Mt) (Mt) (Mt) (Mt) J 1.40 7.0 10

  12. Slide 12: BBM - Premium Quality Coking and PCI Coal

    BBM - PREMIUM QUALITY COKING AND PCI COAL For personal use only Coal Quality of B, C and D Seams Inherent Volatile Fixed Total Calorific Relative Phos- ƒ Low insitu‐ash allows Seam Product Moisture Ash Matter Carbon Sulphur Value CSN Density phorus direct shipping D PCI 0.9 5.1 10.3 83.7 0.43 8,204

  13. Slide 13: BBM - Potential to Increase Size

    BBM – POTENTIAL TO INCREASE SIZE For personal use only • Exploration Target1 of 200 – 350Mt down to 200m depth. • This potential is in additon to the current 77 Mt JORC Indicated & Inferred Resources • Comprised of 13 Seams in the Eastern Block of BBM (40% of the tenement area) 1. Refer Exploration

  14. Slide 14: Indonesian Projects - Delivery Schedule

    INDONESIAN PROJECTS - DELIVERY SCHEDULE For personal use only 14

  15. Slide 15: Developing Infrastructure

    DEVELOPING INFRASTRUCTURE For personal use only • Two river ports and two coal‐ fired power stations to facilitate met coal production • Working together for mutual benefit with the Murung Raya Regency • CSR program on education and training, employment and local infrastructure Dr Willy Yoseph (Head

  16. Slide 16: Corporate Social Responsibility

    CORPORATE SOCIAL RESPONSIBILITY For personal use only • Assisted with materials and labour to make repairs to the local school • Provided medical support to the community; arranging an ophthalmologist to run a free clinic • Co‐operative business which employs local people to assist Cokal with logist

  17. Slide 17: Project Location - West Kalimantan, Indonesia

    PROJECT LOCATION West Kalimantan, INDONESIA For personal use only • Cokal 75.2% interest in PT Silangkop Nusa Raya (SNR) • Three IUPs in Singtang Regency, West Kalimantan covers an area of 13,000 hectares • Outcrop samples show high volatile, low ash, moderate sulphur and low phosphorus coking coal

  18. Slide 18: Project Location - Tanzania

    PROJECT LOCATION - Tanzania For personal use only ¾ Two companies formed ¾ JV1 ‐ 50:50; JV2 ‐ 60:40 ¾ JV1 has tenement ¾ JV2 vehicle for further prospects ¾ Part of Karoo Basin (per Mozambique) ¾ Identifying further target drilling 18

  19. Slide 19: EMEM Co-operation Agreement

    EMEM CO-OPERATION AGREEMENT For personal use only ¾ Mozambique Government owned EMEM and Cokal will jointly develop coal projects that EMEM gain title to in the emerging, vast Mozambique metallurgical coal basin ¾ EMEM will have 20% ownership and Cokal 80% of the JV company ¾ Cokal will provide fund

  20. Slide 20: Market Capitalisation

    MARKET CAPITALISATION For personal use only Million Dollars A$ Coal Companies $913 $260 $195 $158 $158 $72 $61 $56 $45 BORN.JK CZA.AX BTU.AX COK.AX NCR.AX CKA.AX AFR.AX CLR.AX TIG.AX As at 02 August 2012 20

  21. Slide 21: Summary

    SUMMARY For personal use only ¾ Executive Team with strong track record ¾ High Margin Metallurgical Coal confirmed ¾ Assets with Good Prospectivity ¾ Strong Ability and resolve to bring Assets into Production ¾ High Integrity for Long Term value ¾ Plans for Global footprint 21