Leading Edge Materials Corp. · TSXV:LEM
Leading Edge Materials — Investor Presentation (December 2017)
21 slides from Leading Edge Materials's investor presentation, December 2017

Slide 1: Emerging Materials Expanding Markets Exceptional Opportunities
Emerging Materials Expanding Markets Exceptional Opportunities TSX.V : LEM www.leadingedgematerials.com 1 Dec 2017 emerging materials expanding markets

Slide 2: Disclaimer
Disclaimer This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regula

Slide 3: About Leading Edge Materials
About Leading Edge Materials █ Leading Edge Materials is a Canadian public company with principal assets in Scandinavia, a region well recognised for its promotion and investment in innovation. █ LEM’s flagship asset is the Woxna Graphite production facility located in central Sweden targeting the s

Slide 4: Corporate Overview
Corporate Overview CANADA: TSXV : LEM SHARES ON ISSUE: 88.2M USA: OTCQX : LEM FULLY DILUTED: 102.6 M GERMANY: FSE : 7FL RECENT PRICE: $0.85 DAILY VOLUME: 120,000 shares 52 WK LOW/HIGH: $0.455/0.93 INSIDERS: 16% MARKET CAP: C$ 68 M CASH: C$ 3.8 M 12 Month Price Chart @ 15/12/2017 (www.stockwatch.com)

Slide 5: Board and Management
Board and Management Bringing together a deep knowledge of mining, emerging technologies and process development for high purity materials. Blair Way (President, CEO & Director) B.Sc., MBA, FAusIMM, Mr. Way has over 30 years management experience within the resources and construction industry throug

Slide 6: LEM – Assets Overview
LEM – Assets Overview With key assets in the Nordic region and research partners across Europe, Leading Edge Materials is working to be a sustainable supplier of a range of critical raw materials. WOXNA GRAPHITE MINE graphite, high purity graphite, graphene LEM is 100% owner of the fully built, full

Slide 7: Markets
Markets Leading Edge Materials is focussed on the supply of materials needed for the efficient production, storage and conservation of low carbon energy. These high growth markets will drive the future of the Company. ENERGY PRODUCTION AND STORAGE graphite, aluminium, hafnium, REEs The generation of

Slide 8: The Nordic Advantage
The Nordic Advantage The Nordic region is the mining powerhouse of Europe, with clear exploration and development pathways. The region is an innovation hub, providing many opportunities in critical raw materials. █ Strong mining industries with renowned mining + mineral processing equipment manufact

Slide 9: Leading Edge Materials Portfolio
Leading Edge Materials Portfolio 9 Dec 2017 emerging materials expanding markets

Slide 10: LEM - preparing for the future
LEM - preparing for the future LEM has a pipeline of projects starting with the Woxna graphite production facility which is being prepared for production of battery grade graphite products. Lithium and cobalt properties are being de-risked while identifying future development prospects. █ Optimizati

Slide 11: LEM – R&D PROJECTS
LEM – R&D PROJECTS LEM has a pipeline of projects underway. █ Optimization of the Woxna flow sheet in preparation for production of battery grade material production █ Vinnova Graphene Energy Project –partners in the project are 2D fab AB, VestaSi AB, Ångström Advanced Battery Centre (ÅABC), Uppsala

Slide 12: Woxna Graphite Mine and Processing Facility
Woxna Graphite Mine and Processing Facility Overview: Leading Edge Materials owns and operates one of the western world’s few graphite mines, in central Sweden. The Woxna mine was commissioned in 1997, and is fully permitted for 100,000 tonnes per annum feed which equates to 10,000 tons of graphite

Slide 13: Woxna Graphite Mine - Resources
Woxna Graphite Mine - Resources Mining Lease Classification Tonnes (Mt) Graphite (“Cg”) % Gropabo 1 Indicated 1.5 8.8 Mattsmyra 1 Indicated 3.4 8.4 Kringelgruven 2 Measured 1.0 10.7 Kringelgruven 2 Indicated 1.8 10.7 TOTAL MEASURED 1.0 10.7 TOTAL INDICATED 7.7 9.3 Mining Lease Classification Tonnes

Slide 14: Woxna Graphite Mine – High Purity Project
Woxna Graphite Mine – High Purity Project With a fully permitted and constructed facility, Woxna is in a strong position to become a preferred supplier to the growing lithium-ion battery market. A lithium-ion battery is comprised of up to 16% graphite by mass. High purity (>99.9%) shaped graphite is

Slide 15: Bergby Lithium Project
Bergby Lithium Project █ Newly discovered lithium project in central Sweden, less than 100km from the Woxna graphite mine and close to major infrastructure. █ Bergby lies in central Sweden, 25km north of the town of Gävle, secured by three exploration licenses that cover a total of 1,903 Ha. █ The s

Slide 16: Norra Kärr REE Project - Sweden
Norra Kärr REE Project - Sweden Overview: Leading Edge Materials is 100% owner of one of the largest heavy REE deposits globally, and the only deposit of its type within the EU. Norra Kärr is a large, well drilled resource that begins from surface to at least 300m depth. A recent PFS showed a mine l

Slide 17: Critical Materials Market Defined
Leading Edge Materials Critical Materials Market Defined 17 Dec 2017 emerging materials expanding markets

Slide 18: Emerging Materials, Expanding Markets
Emerging Materials, Expanding Markets Source: Materials critical to the energy industry, UNiA, BP Chinese Supply Monopoly 3000 BC ABUNDANT METALS SPECIALTY and BY-PRODUCT METALS The Past is No Guide to the Future. The exciting technologies of the 21st century are enabled by the properties and potent

Slide 19: The LIB Market is Changing – Bloomberg - Europe Gigaplants
The LIB Market is Changing – Bloomberg - Europe Gigaplants 19 Dec 2017 emerging materials expanding markets

Slide 20: Meeting the future LIB Market in the EU
Meeting the future LIB Market in the EU NorthVolt BMZ Nissan / Renault Daimler Mercedes Benz LG Chemical Jaguar / Land Rover / BMW / Ford Joint Venture Samsung Volkswagen Samsung Tesla 20 Dec 2017 emerging materials expanding markets

Slide 21: LEM - The Right Place, The Right Time
LEM - The Right Place, The Right Time HIGH GROWTH Leading Edge Materials is positioned to supply critical raw materials to the high growth low carbon energy sector. SECTOR Electrification of vehicles and renewable energy generation are forming mega-trends of the 21st century. RIGHT With assets and a
Source: Internet Archive copy of leadingedgematerials.com
More decks from Leading Edge Materials Corp.
Investor Presentation (July 2026)33 slides · July 2026
Investor Presentation (June 2023)44 slides · June 2023
Investor Presentation (January 2023)43 slides · January 2023
Investor Presentation (May 2022)47 slides · May 2022
Investor Presentation (November 2021)40 slides · November 2021
Investor Presentation (October 2021)40 slides · October 2021