Leading Edge Materials Corp. · TSXV:LEM

Leading Edge Materials — Investor Presentation (October 2021)

40 slides from Leading Edge Materials's investor presentation, October 2021

  1. Slide 1: Critical Raw Materials in Europe

    Slide 1: Critical Raw Materials in Europe

    Critical Raw Materials in Europe October 2021 TSX.V: LEM Nasdaq First North: LEMSE OTCQB: LEMIF FRA: 7FL

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regula

  3. Slide 3: Strategy and Project Portfolio

    Slide 3: Strategy and Project Portfolio

    Strategy and Project Portfolio Developing a portfolio of critical raw material projects located in the European Union. Critical raw materials are determined as such by the European Union based on their economic importance and supply risk. They are directly linked to high growth technologies such as

  4. Slide 4: Woxna Graphite

    Slide 4: Woxna Graphite

    Woxna Graphite Annual potential anode output from Woxna Graphite* could support the production of lithium-ion batteries needed for a significant amount of electric cars 100 000 * Management estimate calculations based on publicly available data and product output numbers from National Instrument 43-

  5. Slide 5: Norra Kärr HREE

    Slide 5: Norra Kärr HREE

    Norra Kärr HREE Annual potential output from Norra Kärr* could support the production of NdFeB permanent magnets needed for a significant amount of electric cars 1 200 000 1 900 000 * Management estimate calculations based on publicly available data and product output numbers from National Instrumen

  6. Slide 6: Norra Kärr HREE

    Slide 6: Norra Kärr HREE

    Norra Kärr HREE Annual potential output from Norra Kärr* could support the production of NdFeB permanent magnets needed for a significant amount of 10MW wind turbines 370 2 185 * Management estimate calculations based on publicly available data and product output numbers from National Instrument 43-

  7. Slide 7: Board and Management

    Slide 7: Board and Management

    Board and Management Canadian public company with EU leadership Lars-Eric Past President & CEO Ivanhoe Mines Sanjay CEO and founder SKS Business Services Ltd. Swarup CFO Kinross Gold Corporation Chairman Past Johansson CFO Noranda Inc CFO Mandalay Resources (TSX) CFO CFO Falconbridge Vice President

  8. Slide 8: Share Capital

    Slide 8: Share Capital

    Share Capital ▪ Tickers: LEM.V (TSXV) LEMIF (OTCQB) LEMSE (NFN) 7FL (Fra) Insider Ownership ▪ Quote: CAD $0.36 / SEK 2.70 (per 19.10.2021) ▪ Mkt Cap: CAD $53m / SEK 372M (non-diluted) ▪ Shareholder base: ~50% North American vs European 0% 20% 40% 60% 80% 100% Fiscal 2020 trading volume Sweden 25% Ca

  9. Slide 9: Shares, Warrants and Options

    Slide 9: Shares, Warrants and Options

    Shares, Warrants and Options Potential proceeds from exercise 0 5,000,000 10,000,000 15,000,000 Issued and Outstanding as of October 18, 2021: 146,960,500 Stock Options 6,050,000 Expiring May 30/22 @ 0.225 600,000 Expiring Nov 02/22 @ 0.64 1,900,000 Expiring Aug 11/23 @ 0.155 3,400,000 Expiring Aug

  10. Slide 10: Critical Raw Materials

    Slide 10: Critical Raw Materials

    Critical Raw Materials Economic Importance ▪ CRMs are directly linked to technologies such as batteries and permanent magnets that are critical for growth industries like renewables, energy storage and electromobility ▪ CRMs enable the transition to a green, digital and autonomous EU Supply Risk ▪ E

  11. Slide 11: Economic Importance and Supply Risk

    Slide 11: Economic Importance and Supply Risk

    Economic Importance and Supply Risk Economic Importance Supply Risk • Expected growth in industries such as renewables, energy • The production of many critical raw materials is dominated storage and e-mobility is expected to drive demand growth by individual third countries making the EU reliant on

  12. Slide 12: The Challenge for Europe

    Slide 12: The Challenge for Europe

    The Challenge for Europe “Green and digital technologies currently depend on a number of scarce raw materials. We import lithium for electric cars, platinum to produce clean hydrogen, silicon metal for solar panels. 98% of the rare earth elements we need come from a single supplier: China. This is n

  13. Slide 13: European Battery Industry

    Slide 13: European Battery Industry

    European Battery Industry LEADING EDGE MATERIALS Anode eo EUROPEAN _ . "ee GIGAFACTORIES collector formations) Ane s by (IC anergicuNE | 7 Electrolyte (lithium salts) Envision AESC WOXNA fees GRAPHITE. amt Charge Discharge mibetic MELMCME Sion Flake Graphite Demand for LIB 202,617 1,108,448 2,896,22

  14. Slide 14: Battery Value Chain Gap

    Slide 14: Battery Value Chain Gap

    Battery Value Chain Gap LEADING EDGE MATERIALS Cell production capacity EU Demand in 2030;

  15. Slide 15: Woxna Graphite Anode project

    Slide 15: Woxna Graphite Anode project

    Woxna Graphite Anode project

  16. Slide 16: Woxna Graphite Overview

    Slide 16: Woxna Graphite Overview

    Woxna Graphite Overview Mine Concentrator Sizing Shaping Purification Coating

  17. Slide 17: Woxna Graphite Resources

    Slide 17: Woxna Graphite Resources

    Woxna Graphite Resources* Mineral Resource Estimate – Measured and Indicated Classification of Mineral Notes: Property Tonnes (Mt) Grade C (%) Resource • Inconsistencies in totals are due to rounding; Measured 0.96 9.21 Indicated 1.65 9.09 • 4% Cg mill cut-off grade applied for reporting purposes co

  18. Slide 18: Woxna Graphite Anode PEA

    Slide 18: Woxna Graphite Anode PEA

    Woxna Graphite Anode PEA* Financial Highlights Operational Highlights ▪ Pre- and post-tax Net Present Value (NPV) of $317m ▪ Life of Project (LOP) is 19 years and $248m using an 8% discount rate ▪ Life of Mine (LOM) is 15 years ▪ Pre- and post-tax IRR of 42.9% and 37.4% ▪ LOM average annual plant fe

  19. Slide 19: Woxna Graphite Anode PEA

    Slide 19: Woxna Graphite Anode PEA

    Woxna Graphite Anode PEA* ▪ The PEA indicates the potential viability of a Swedish operation producing battery grade graphite anode material utilizing an existing graphite mine and concentrator with the addition of a value-add processing facility offsite ▪ Thermal purification process which, combine

  20. Slide 20: Woxna Graphite LCA Results

    Slide 20: Woxna Graphite LCA Results

    Woxna Graphite LCA Results* ▪ 1 tonne of natural graphite anode material (coated spherical purified graphite (“CSPG”)) from natural graphite extracted at the Woxna Graphite mine is forecast to have an impact of 1.8 tonnes CO2 eq ▪ 85% to 90% lower impact than the current market dominant Chinese alte

  21. Slide 21: Proposed 50/50 JV with Sicona

    Slide 21: Proposed 50/50 JV with Sicona

    Proposed 50/50 JV with Sicona* ▪ Targeting the production of advanced natural graphite and silicon- graphite-carbon composite active anode materials ▪ Sicona is commercialising innovative silicon-graphite-carbon composite anode and binder technology and materials that have been developed over the la

  22. Slide 22: Woxna Graphite Mine

    Slide 22: Woxna Graphite Mine

    Woxna Graphite Mine LEADING EDGE MATERIALS

  23. Slide 23: Rare Earth Elements

    Slide 23: Rare Earth Elements

    Rare Earth Elements Permanent Magnets Electric Vehicles Wind Power “rare earth elements may see three to seven times higher demand in 2040 than today” “The Role of Critical Minerals in Clean Energy Transitions” – IEA, 2021

  24. Slide 24: Norra Karr HREE Project

    Slide 24: Norra Karr HREE Project

    LEADING EDGE MATERIALS Norra Karr HREE Project

  25. Slide 25: Location of Norra Karr

    Slide 25: Location of Norra Karr

    Location of Norra Karr LEADING EDGE MATERIALS @ © carbonate 7 © Paraleline neous yw, rl © Heavymineralsands | L f rae ZL * © otter ‘an US. Gui Surya 0 ancl nt 1098 em Ral at 2 Rn jin Wel Gand Satan 18 ct

  26. Slide 26: Norra Kärr Mineral Resource Statement

    Slide 26: Norra Kärr Mineral Resource Statement

    Norra Kärr Mineral Resource Statement Resource REO Distribution Ce2O3 21.0% Pr2O3 3.0% Nd2O3 11.0% La2O3 10.0% Tb2O3 0.7% Dy2O3 5.0% Y2O3 34.1% 52% HREO * See National Instrument 43-101 report titled “PRELIMINARY ECONOMIC ASSESSMENT OF NORRA KÄRR RARE EARTH DEPOSIT AND POTENTIAL BY-PRODUCTS, SWEDEN"

  27. Slide 27: Significant Dysprosium Resource

    Slide 27: Significant Dysprosium Resource

    Significant Dysprosium Resource* Contained dysprosium 30,000 25,000 20,000 15,000 10,000 5,000 0 Norra Kärr Indicated Resource Norra Kärr 26 year LoM Mt Weld Reserve** * See National Instrument 43-101 report titled “PRELIMINARY ECONOMIC ASSESSMENT OF NORRA KÄRR RARE EARTH DEPOSIT AND POTENTIAL BY-PR

  28. Slide 28: Norra Kärr 2021 PEA vs 2015 PFS

    Slide 28: Norra Kärr 2021 PEA vs 2015 PFS

    Norra Kärr 2021 PEA* vs 2015 PFS ▪ More than 50% of total mined material is planned to be sold as products compared with less than 1% in the previously project submitted for permitting ▪ Opportunity for further improvement with waste rock for construction material and aegirine for paint pigment or b

  29. Slide 29: Norra Kärr 2021 PEA

    Slide 29: Norra Kärr 2021 PEA

    Norra Kärr 2021 PEA* Operational Highlights 1,150ktpa • Life of Mine (LOM) is 26 years 733ktpa • LOM average annual 292ktpa • Mining rate of 1,150,000 tonnes • strip ratio of 0.32 • TREO 5,341 tonnes 103ktpa @ 5.8% TREO • Magnet REOs (Nd, Pr, Dy, Tb) 1,005 tonnes • Dy2O3: 248 tonnes • Tb2O3: 36 tonn

  30. Slide 30: Off-site Chemical Plant Localization

    Slide 30: Off-site Chemical Plant Localization

    Off-site Chemical Plant Localization ▪ Luleå chosen conceptually due to vicinity of sulphuric acid production, brownfield industrial areas and logistics 900km ▪ Access to low cost low carbon footprint hydropower ▪ 900 kilometers by train ▪ Other locations in Sweden, or neighbouring countries will be

  31. Slide 31: Norra Kärr 2021 PEA

    Slide 31: Norra Kärr 2021 PEA

    Norra Kärr 2021 PEA* Financial Highlights Revenue Distribution Nb2O5 5% Nepheline • Pre- and post-tax Net Present Value (NPV) of ZrO2 11% Syenite $1,026M and $762M using a 10% discount rate 11% • Pre- and Post-tax Internal Rate of Return (IRR) of 30.8% and 26.3% REO 74% • Accumulated LoM project rev

  32. Slide 32: Norra Kärr 2021 PEA

    Slide 32: Norra Kärr 2021 PEA

    Norra Kärr 2021 PEA* Total Operating Cost (excl. toll separation, by-product credit): USD14.27/kg Total Operating Cost (incl. toll separation, by-product credit): USD14.57/kg * See National Instrument 43-101 report titled “PRELIMINARY ECONOMIC ASSESSMENT OF NORRA KÄRR RARE EARTH DEPOSIT AND POTENTIA

  33. Slide 33: Radionuclide Content

    Slide 33: Radionuclide Content

    Radionuclide Content Mt Weld 500 Yangibana Dubbo Thorium (ppm, log scale) Lofdal Mountain Pass Nechalacho 50 Ngualla Browns range Norra Kärr 5 5 10 20 40 80 Uranium (ppm, log scale) Data for peer projects is managements estimates based on publicly available data. Leading Edge Materials Corp. does no

  34. Slide 34: Sustainability Opportunity of Norra Kärr

    Slide 34: Sustainability Opportunity of Norra Kärr

    Sustainability Opportunity of Norra Kärr Comparison of dysprosium production from different resources by life cycle assessment Source: Zapp, 2018

  35. Slide 35: Sweden's Power Advantage

    Slide 35: Sweden's Power Advantage

    Sweden’s Power Advantage Source: NodePole

  36. Slide 36: Social License of Norra Kärr

    Slide 36: Social License of Norra Kärr

    Social License of Norra Kärr 2013 2021 • Mining lease 2019 granted with • Mining support by • County Inspectorate Mining Administrative rejects mining Inspectorate Board demands lease 2009 2015 2021 and County N2000 permit application due • Exploration Administrative • Pre-Feasibility prior to minin

  37. Slide 37: Norra Kärr 2021 PEA Environmental Context

    Slide 37: Norra Kärr 2021 PEA Environmental Context

    Norra Kärr 2021 PEA Environmental Context Past footprint PEA footprint

  38. Slide 38: Bihor Sud Exploration Project

    Slide 38: Bihor Sud Exploration Project

    Bihor Sud Exploration Project

  39. Slide 39: Bihor Sud Cobalt Project

    Slide 39: Bihor Sud Cobalt Project

    Bihor Sud Cobalt Project Overview Bihor Peak/Cucurbăta Mare (1849m) • JV from 2018 with 51% ownership with potential to move to 90%. Local JV partner operates a Dolomite mine in the area offering shared resources and local knowledge Gruiu Dumi Avram Iancu • Located in the upper Cretaceous megallogen

  40. Slide 40: www.leadingedgematerials.com

    Slide 40: www.leadingedgematerials.com

    www.leadingedgematerials.com info@leadingedgematerials.com @LeadingEdgeMtls TSX.V: LEM Nasdaq First North: LEMSE OTCQB: LEMIF FRA: 7FL

Source: Internet Archive copy of leadingedgematerials.com

More decks from Leading Edge Materials Corp.

All 11 Leading Edge Materials decks