Rox Resources Ltd · ASX:RXL
Rox Resources — Investor Presentation (July 2025)
19 slides from Rox Resources's investor presentation, July 2025
Slide 1: Near-Term Gold Producer
ASX: RXL Near-Term Gold Producer Grade. Margin. Upside. Investor presentation | July 2025
Slide 2: Important Information and Disclaimer
Important Information and Disclaimer ASX: RXL Important - you must read the following before continuing The following notices and disclaimers apply to this presentation and you are therefore advised to read this carefully before reading or making any other use of this presentation or any information
Slide 3: Important Information and Disclaimer
Important Information and Disclaimer ASX: RXL Important - you must read the following before continuing Production Target The Production Target and forecast financial information derived from the Production Target referred to in this release are underpinned by Indicated Mineral Resources (approximat
Slide 4: Major Highlights
Major Highlights ASX: RXL $0.50 12 High-grades and exploration upside • Flagship Youanmi gold project has high-grade resource with 10 $0.40 update due Q3 CY2025 • Underground gold project with compelling economics Volume (Millions) 8 • Mineral Resource open down dip and along strike $0.30 Share Pric
Slide 5: Flagship - Youanmi Gold Project
Flagship - Youanmi Gold Project ASX: RXL • Located in the central Youanmi Greenstone Belt, within the Southern Cross Province of the Archaean Yilgarn Craton • Situated in Western Australia – globally recognised as Australia’s premier gold province • Surrounded by million-ounce deposits and major gol
Slide 6: PFS Highlights – Youanmi Flagship Project
PFS Highlights – Youanmi Flagship Project ASX: RXL High-Grade Reserve and Resource • Probable Ore Reserve estimate of 3.8Mt @ 4.4 g/t Au for 546koz • Total Mineral Resource estimate of 16.2Mt @ 4.4 g/t Au for 2,300koz >100koz pa Production Profile • >100koz pa production profile - 786koz gold doré •
Slide 7: High-Grade Mineral Resource Estimate (January 2024)
High-Grade Mineral Resource Estimate (January 2024) ASX: RXL Cut-off Indicated Inferred Total Category Grade Tonnes Au Grade Au Metal Tonnes Au Grade Au Metal Tonnes Au Grade Au Metal (g/t) (Mt) (g/t) (Koz) (Mt) (g/t) (Koz) (Mt) (g/t) (Koz) Open Pit 0.5 5.1 2.8 458 1.4 2.4 108 6.5 2.7 565 Undergroun
Slide 8: High-Grade Ore Reserve (July 2024)
High-Grade Ore Reserve (July 2024) ASX: RXL Existing Decline to ~600m below surface Ore Reserve Tonnes (Mt) Grade (g/t Au) Contained Ounces (koz) Proved Underground Ore Reserve - - - Probable Underground Ore Reserve 3.83 4.4 546 Total Underground Ore Reserve 3.83 4.4 546 Investor presentation | July
Slide 9: Key Initial Results From Step-Up Program & Exploration Targets
Key Initial Results1 From Step-Up Program & Exploration Targets ASX: RXL Exploration Targets Target Tonnage Grade Au Ounce Au Area Range Range Range 1.0Mt to 5.3 g/t to 193Koz to Kathleen 1.3Mt 8.0 g/t 355Koz 0.8Mt to 3.9 g/t to 110Koz to Pollard 1.0Mt 7.8 g/t 269Koz Main 0.3Mt to 3.4 g/t to 42Koz t
Slide 10: Dewatering Early Works
Dewatering Early Works ASX: RXL • Significant infrastructure with high volume evaporation ponds and pits available – fully permitted • Pumping underway from United North and Main Pits • Significant step forward on Pathway to Production • United North exploration decline expected early Q4 CY2025 • Po
Slide 11: Metallurgical Testwork Underway
Metallurgical Testwork Underway ASX: RXL Metallurgical test work for the DFS advancing, comminution and flotation works completed High sulphur recovery to concentrate of ~98.3%, containing ~91.6% of gold, remaining gold in flotation tails to cyanide leaching1 Concentrate was produced and sent to Cor
Slide 12: Regional Advanced Projects
Regional Advanced Projects ASX: RXL Currans Find Gold Project1 Located 20km south of Youanmi Significant historical intercepts at Currans Find include: • CFRC026: 3m @ 32.58g/t Au from 115m • CFRC016: 3m @ 27.50g/t Au from 39m • CFRC031: 4m @ 18.59g/t Au from 108m • CFRC084: 3m @ 19.58g/t Au from 21
Slide 13: Indicative Pathway to Production
Indicative Pathway to Production ASX: RXL I CY24 CY25 CY26 CY27 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Key Project Deliverables Definitive Feasibility Study FID Mill construction and commissioning First gold Milestones Resource extensional drilling Extensional drilling Growth Exploration drilling Explorat
Slide 14: Team, Vision, Mission
Team, Vision, Mission ASX: RXL Board of Directors Stephen Dennis Phillip Wilding Experienced team with Non-Executive Chair Managing Director & CEO proven record in developing Australian Nathan Stoitis David Boyd gold mines Non-Executive Director Non-Executive Director Vision to deliver Management su
Slide 15: Next Steps
Next Steps ASX: RXL Near-Mine Exploration and Growth ~35,000m Drill Program Completed (28 April) • Continuing to drill near-mine growth exploration targets • Update MRE due July 2025 will include addition of ~46,000m of drilling since previous estimate Progress Definitive Feasibility Study • Continu
Slide 16: Thank You
ASX: RXL Thank You Level 2, 87 Colin Street, www.roxresources.com.au West Perth, Western Australia 6005 + 61 (8) 9226 0044 admin@roxresources.com.au rox-resources
Slide 17: Appendix - PFS Production Target – The Starting Point
Appendix - PFS Production Target – The Starting Point ASX: RXL Current Life of Mine, Ounces Mined and AISC – THE AIM: to bring in forward ounces and increase with higher throughput Ounces Mined (koz) AISC $/oz 140 2,800 130 Indicated Inferred AISC 120 2,400 110 100 2,000 90 80 1,600 70 60 1,200 50 4
Slide 18: Appendix - Project PFS Capital Requirement
Appendix - Project PFS Capital Requirement ASX: RXL Pre-Production Capital Costs $m Site Infrastructure 22 Processing Facilities 150 Tailings Storage Facility 4 Underground Development 39 Commissioning Costs – Net 15 Contingency 15 Total Pre-Production Costs 245 Sustaining Capital – Life Of Mine Und
Slide 19: Appendix - Processing – A Scalable Plant
Appendix - Processing – A Scalable Plant ASX: RXL Simple flowsheet to produce gold doré averaging 103koz per annum – with recoveries estimated at 92.6% Simple Flowsheet • Conventional crushing, grinding and flotation • Flotation concentrate to Albion Process • Flotation tails to conventional CIL • A