    ASX Announcement ASX: SS1 4th September 2024 Amended Investor Presentation Sun Silver Limited (ASX Code: SS1) (“Sun Silver” or “the Company”) refers to its announcement dated 3 September 2024 titled ‘Investor Presentation - RRS Gold Coast Conference’ (Presentation). The Company advises that slides 5

  2. Slide 2: Sun Silver Limited - Resources Rising Stars Conference 2024

    SUN SILVER LIMITED ASX CODE - SS1 Resources Rising Stars Conference 2024 September 2024

  3. Slide 3: Important Information

    IMPORTANT INFORMATION Not a disclosure document The purpose of this presentation is to provide general information about the Company and the Maverick Springs Project (Project) only. This presentation is not a disclosure document for the purpose of Chapter 6D of the Corporations Act 2001 (Cth) (Corpo

  4. Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS Largest pre-production primary silver deposit on ASX1 • Significant increase in Mineral Resource – 45% increase from 292Moz to 423Moz at 67.25g/t AgEq2 • Maverick Springs is the largest pre-production primary silver asset on the ASX with 253Moz at 40.25gt Ag Continued growth po

  5. Slide 5: Maverick Springs Updated JORC Mineral Resources Estimate

    MAVERICK SPRINGS UPDATED JORC MINERAL RESOURCES ESTIMATE 45% 423 Moz Increase in Mineral Silver Equivalent at Resource 67.25 g/t 253 Moz 2 Moz Silver at 40.25 g/t Gold at 0.32g/t (1) Mineral Resource estimated in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Res

  6. Slide 6: Maverick Springs - The Largest Pre-Production Primary Silver Project on the ASX

    MAVERICK SPRINGS - THE LARGEST PRE-PRODUCTION PRIMARY SILVER PROJECT ON THE ASX 250 200 150 M Oz Silver 100 With a Silver-only resource of 253 Moz, Maverick Springs is 50 the largest pre- production primary silver asset on ASX2. 0 Maverick Bowdens Maronan Kempfield Paris Silver Sorby Hills Wonawinta

  7. Slide 7: Corporate Summary

    Corporate Summary Shareholder Distribution Shares on Issue – 124.98M Market Capitalisation – ~$82.5M at 66c share 46% 54% IPO 15th May @ $20c Cash as of 30 June 2024 – $6.58M Top 20 Shareholders Balance of Holders 6

  8. Slide 8: Board and Management

    Board and Management Gerard O’Donovan Dean Ercegovic Nathan Marr Robert Anderson Executive Director Non-Executive Chairperson Non-Executive Director Exploration Manager – Nevada • Previous MD & CEO of Battery Age • Founding Director & Chief Operating • Qualified metallurgist with over 20 • 17 year e

  9. Slide 9: Interactive Overview – Maverick Springs Project

    Interactive Overview – Maverick Springs Project https://vrify.com/decks/16726?auth=e94a7bbc- 2e25-4cae-b5f9-0908302e0761 (1) The information in the Interactive Overview that relates to exploration results and estimates of mineral resources at the Maverick Springs Project is extracted from the Compan

  10. Slide 10: All extensional holes to date have intersected high grade silver mineralisation up to 605g/t

    All extensional holes to date have intersected high grade silver mineralisation up to 605g/t1 • 100% success rate: all extensional holes to date intersecting high-grade silver mineralisation outside the recently upgraded resource. • pXRF analysis shows antimony readings up to 1,327ppm antimony (Sb),

  11. Slide 11: What's next in the field

    What's next in the field • Extensional drill intercepts have proven the theory that high grade mineralisation extends to the northwest. • Geophysics, geochem & field mapping has been interpreted & defined further high priority drill targets1 • Drilling continues to focus on testing extensional holes

  12. Slide 12: Macro Silver Market – Supply/Demand Balance v Price

    Macro Silver Market – Supply/Demand Balance v Price Deficit / Surplus M Oz Ag USD / Ag Oz Source: Refer to Appendix A 11

  13. Slide 13: Silver & Solar

    Silver & Solar Silver is an essential material of every solar panel. 23% of a panel material cost is silver Silver Demand for Solar Panels 2014 - 2024 Silver demand from solar panels increased 380% since 2014 from 48 million ounces, to 232 m Oz in 2024. Maintaining current trajectory of solar panel

  14. Slide 14: USA Target 30% Solar by 2030

    USA Target 30% Solar by 2030 Currently 3% Solar 125 GW per annum Silver the most critical additional capacity target By 2030 metal posing price and supply risks 98% of the current global silver reservescould be depleted by 2050 based on demand projections. Source: Refer to Appendix A 13

  15. Slide 15: Silver Paste Opportunity – US Growth Market

    Silver Paste Opportunity – US Growth Market • Silver paste a key component in PV panel supply chain manufacturing • Over 90% of Solar PV cells manufactured in China. • 50% Tariff on Chinese solar imports to US • Banned imports from Xinjiang – 50% PV supply – due to ESG concerns • USD$60m Silver Past

  16. Slide 16: Key Activities

    Key Activities RESOURCE RESOURCE UPGRADE/GROWTH CLASSIFICATION UPGRADE SILVER PASTE INVESTIGATION DRILLING – EXTENSIONAL & INFILL MET TEST WORK Resource increase 7500m Infill & Increase classification Expand historical test Investigative studies utilising current market Extensional Drilling of curre

  17. Slide 17: Thank You

    Thank You Contact Information: Gerard O’Donovan Executive Director A: 288 Railway Parade, West Leederville, WA, 6007 W: sunsilver.com.au E: info@sunsilver.com.au Investor Relations: Nicholas Read Read Corporate T: (08) 9388 1474 E: nicholas@readcorporate.com.au 16

  18. Slide 18: Appendix A – External References

    Appendix A – External References Slide 11 Sources include: https://www.silverinstitute.org/wp-content/uploads/2024/04/World-Silver-Survey-2024.pd https://www.nasdaq.com/market-activity/commodities/si-cmx/historicalf Slide 12 Sources include: https://www.silverinstitute.org/wp-content/uploads/2023/04

  19. Slide 19: Appendix B – Silver Deposit Comparisons

    Appendix B – Silver Deposit Comparisons Deposit Country Operator Stage Measured Indicated Inferred Size Grade Contained Year Resource Standard Source (Mt) (Mt) (Mt) (Mt) (Ag g/t) Ag (Moz) Category Maverick USA Sun Silver Pre-Production 0.0 0.0 195.7 195.7 40.2 253 2024 Mineral Resource JORC https://