Sun Silver Ltd. · ASX:SS1

Sun Silver — Diggers & Dealers Mining Forum 2026

15 slides from Sun Silver's conference presentation, August 2026

  1. Slide 1: Sun Silver Limited – Maverick Silver Project

    SUN SILVER LIMITED Maverick Silver Project, Nevada, USA Diggers & Dealers – Mining Forum ASX: SS1 August 2026

  2. Slide 2: Important Information

    IMPORTANT INFORMATION Not a disclosure document The purpose of this presentation is to provide general information about the Company and the Maverick Silver Project (Project) only. This presentation is not a disclosure document for the purpose of Chapter 6D of the Corporations Act 2001 (Cth) (Corpor

  3. Slide 3: Largest Pre-Production Primary Silver Project Within the US

    LARGEST PRE-PRODUCTION PRIMARY SILVER PROJECT WITHIN THE US JORC INFERRED MINERAL RESOURCES ESTIMATE 539 Moz Silver Equivalent at 71 g/t 347.2 Moz 2.25 Moz Silver at 45.5 g/t Gold at 0.30g/t (1) Refer to Appendix A and the Company's ASX announcement dated 9 December 2025 for further details regardin

  4. Slide 4: Outstanding Transformation in 2 Years

    OUTSTANDING TRANSFORMATION IN 2 YEARS May 2024 (IPO) August 2026 Market Capitalisation A$25M 608% A$177M Share Price A$0.20 380% A$0.96 Mineral Resource 292,000,000 oz AgEq 85% 539,000,000 oz AgEq Daily Trading Volume* A$650k / 1m Shares 108% A$1.35m / 1.3m Shares Silver Price USD $29 per oz 103% US

  5. Slide 5: Corporate Summary

    CORPORATE SUMMARY CAPTIAL STRUCTURE ASX: SS1 BOARD, MANAGEMENT AND ADVISORS Andrew Dornan Shaun Hardcastle Existing Shares on Issue 184m Managing Director Non-Executive Chair Andrew is a seasoned mining executive with Shaun has a distinguished legal career 20+ years in exploration and project spanni

  6. Slide 6: Maverick Silver Project – Strategic for U.S. Silver Independence

    MAVERICK SILVER PROJECT – STRATEGIC FOR U.S. SILVER INDEPENDENCE Location, Resource Size, Multi-Commodity Potential, Supply Chain Risk and Policy Recognition • Location: Maverick Silver is strategically situated in Nevada, Tier 1 mining jurisdiction that aligns with U.S. critical minerals strategy.

  7. Slide 7: U.S. Engagement and Strategic Vulnerability

    U.S. ENGAGEMENT AND STRATEGIC VULNERABILITY Domestic Production, Demand vs Supply, Import Dependence, By-product Production Risks • U.S. Government Engagement: Met with senior officials from the Department of Commerce, Department of Energy and EXIM Bank, reinforcing support for domestic critical min

  8. Slide 8: High-Grade Silver Intercepted Beyond Current MRE

    HIGH-GRADE SILVER INTERCEPTED BEYOND CURRENT MRE Initial 2026 drilling confirms growth potential, with 8.3m @ 170g/t AgEq including 4.5m @ 301g/t AgEq intercepted beyond the current MRE and 100m+ cumulative mineralisation in individual holes, validating the geological model. Significant Down Hole Dr

  9. Slide 9: Maverick Springs – Long Section – AgEq

    MAVERICK SPRINGS – LONG SECTION - AGEQ 9 (1) For previously released intercepts not yet referenced refer to the Company’s ASX announcements dated 24 September 2024 and 26 March 2025.

  10. Slide 10: Maverick Silver – Long Section – Antimony

    MAVERICK SILVER – LONG SECTION - ANTIMONY 10 (1) For previously released intercepts not yet referenced refer to the Company’s ASX announcements dated 22 August 2024, 31 October 2024, 3 December 2024, 16 July 2025, 31 July 2025, 12 August 2025 and 25 August 2025.

  11. Slide 11: Exceptional Metallurgical Results

    EXECEPTIONAL METALLURGICAL RESULTS • Strong Intermittent Bottle Roll (IBR’s) Performance: Silver recoveries up to 78% (avg. 77%) and gold up to 77% (avg. 74%) under early-stage heap leach conditions. • High Recovery Upside: Conventional tank leach results demonstrate silver recoveries up to 90% and

  12. Slide 12: Maverick Silver Strategic Land Consolidation

    MAVERICK SILVER STRATEGIC LAND CONSOLIDATION CONTINUOUS OWNERSHIP OF 15KM MAVERICK SILVER TREND • 100% Acquisition of Bayan Springs North Project plus 106 additional lode claims staked. • Consolidates continuous ownership across an emerging 15km trend. • Only ~2.5km of strike drill tested, leaving s

  13. Slide 13: Growth via Consolidation, Resource Growth & Asset Confidence

    GROWTH VIA CONSOLIDATION, RESOURCE GROWTH & ASSET CONFIDENCE Q3 2026 Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 Q1 2028 Resource Extensional Drilling Infill Drilling Target Resource Updates Metallurgical Testwork Internal Studies Scoping Study / PEA Targeted Market Release – Scoping Study Environmental

  14. Slide 14: Thank You

    Thank You Contact Information: Investor Relations: Andrew Dornan Nicholas Read Managing Director Read Corporate A: 288 Railway Parade, West Leederville, WA, 6007 T: +61 (08) 9388 1474 W: sunsilver.com.au E: nicholas@readcorporate.com.au E: info@sunsilver.com.au

  15. Slide 15: Appendix A – Maverick Silver Project Mineral Resource Estimate

    Appendix A – Maverick Silver Project Mineral Resource Estimate Classification Cut-off (g/t AgEq) Tonnes (Mt) AgEq (Moz) AgEq (g/t) Ag (Moz) Ag (g/t) Au (Moz) Au (g/t) Inferred 30 237.3 539 71 347.2 45.5 2.25 0.30 (1) Maverick Silver Project Mineral Resource estimated in accordance with the Australas