Slide 1: Commissioning and Ramp-up of SART and Selen-IX: Key Ingredients to Achieving McNulty Series 1 or Better
Commissioning and Ramp-up of SART and Selen-IX: Key Ingredients to Achieving McNulty Series 1 or Better David Kratochvil, Chris Fleming, Amin Imani, Haijiang Yang COM 2026 Calgary

Slide 2: McNulty Criteria
McNulty Criteria 1) Novelty and complexity of process 2) Sophistication and capability of project team

Slide 3: Novel Process - SART
Novel Process - SART Inventor: Chris Fleming (SGS Lakefield) - 1998 Goal: Recovery and recycle of cyanide consumed by base metals with concurrent recovery of base metals into high grade concentrates Relevance: Enable exploitation of precious metals deposits rich in cyanide soluble copper and zinc. S

Slide 4: Novel Processes – Selen-IX
Novel Processes – Selen-IX Inventor: BQE Water (US and CAN patents - 2013) Goal: Selenate removal below 2 ppb, no new constituents released into treated water, stable residue suitable for re-use. Relevance: Environmental compliance without reliance on dilution, zero risks of chronic effects in aquat

Slide 5: SART & Selen-IX – Common Attributes
SART & Selen-IX – Common Attributes 1) Disruptive technologies with origin outside of major mining houses or equipment suppliers. 2) New chemical processing schemes contrary to status quo knowledge ❑ SART into metallurgical processing ❑ avoidance of Cu in Au ores ❑ operating cyanide at low pH / HCN

Slide 6: McNulty Criteria
McNulty Criteria 1) Novelty and complexity of process 2) Sophistication and capability of project team

Slide 7: SART Results | Hydraulic Capacity
SART Results | Hydraulic Capacity

Slide 8: SART Results | Copper Removal
SART Results | Copper Removal

Slide 9: Shandong Gold SART Performance
Shandong Gold SART Performance 6

Slide 10: Shandong Gold SART Concentrates
Shandong Gold SART Concentrates Copper Concentrate Zinc Concentrate 6

Slide 11: SART Results | EH&S
SART Results | EH&S Years in Number of E&HS Incidents Operations since Environmental Incident Health Safety SART Plant Commissioning Description Incident Description Commissioning Operations Completion Fresh water spray from loose - Fall/ankle injury flush port connection caused Zhongkuang 5.5 0 3 -

Slide 12: Selen-IX Results | Hydraulic Capacity
Selen-IX Results | Hydraulic Capacity

Slide 13: Selen-IX Effluent Quality
& B@E Water Pa) = i) > C -_ c co) = = LL >< 1 c 2 ® ip) 4 Plant Effluent - - ICP MS Detection Limit e Plant Influent (TSF) 100.0 Treatment Target 10.0 ; ' lt 3 {_% [og 8 ' os pt 8 1: | t | 0 ' {4 ' | 4 ' ft } 0 ; oo ra 1 ' } 4 t ; t iment {ot t t+! ' «at ) 4 t ' ly IL-l ' <t ' <a ' et ' STU qt ; ot

Slide 14: What stands out as being “different”
What stands out as being “different” ❑ Process expert was accountable not only for process design but for all aspects of engineering, automation, equipment selection, commissioning, and operation of new plants. Single point of accountability - minimizes interfaces & increases transparency ❑ Operatio

Slide 15: In-house Mix of Core Competencies De-risk Projects
In-house Mix of Core Competencies De-risk Projects Automation Operation Engineering & Commissioning Process Lab Testing Team

Slide 16: Ability to Deliver in Global Industry
Ability to Deliver in Global Industry

Slide 17: Lessons Learned
Lessons Learned ❑ Innovators to invest in building core competencies outside of process expertise: ❖ automation, commissioning, and operations. ❑ Project owners to consider project execution model holistically. ❖ Sole sourcing may lead to better outcomes than traditional bidding; ❖ Outsourcing of op

Slide 18: Recommendations
Recommendations Expand Original McNulty Analysis to Include: ❑ Role of process experts in projects deploying novel processes. ❑ Project execution model. ❖ Competitive bids vs partnerships. ❖ Allocation of risks. ❖ Incentives.
Source: company website
More decks from BQE Water Inc
Investor Presentation (October 2026)22 slides · October 2026
Investor Presentation (April 2026)21 slides · Apr 1, 2026
Investor Presentation (November 2025)22 slides · November 2025
Investor Presentation (June 2025)23 slides · June 2025
Investor Presentation (June 2023)19 slides · June 2023
Investor Presentation (May 2022)21 slides · May 2022