  1. Slide 1: Newcastle Community Dialogue Group

    Newcastle Community Dialogue Group Thursday, 16 November 2023

  2. Slide 2: Acknowledgement of Traditional Owners

    Before we begin, I would like to acknowledge the Traditional Owners of the lands on which we meet today and pay my respects to their Elders past and present. 2

  3. Slide 3: Agenda

    Agenda 1 Open and welcome, apologies, declarations, previous minutes, business a rising and correspondence 4 AGL Update 2 Land and Approvals Update 5 General business, next meeting and close 3 Newcastle Gas Storage Facility latest news Newcastle Community Dialogue Group | 16 November 2023 3

  4. Slide 4: Tomago Battery Project

    Tomago Battery Project Post EIS Submission Briefing CDG/AGL November 16, 2023

  5. Slide 5: Agenda

    Agenda 1 Introductions 4 Schedule 2 Project Overview 5 Discussion 3 Environmental Assessment Approach

  6. Slide 6: Project Overview

    Project Overview 250MW Torrens Island Battery, SA To construct, operate and maintain a Battery at Tomago, NSW: • Approximately 500 megawatts (MW) and storage of up to 2,000 megawatt-hours (MWh) in capacity • Transmission line from the Battery land to either the 132kV Transgrid substation (north) or

  7. Slide 7: Project Location

    Project Location Land: • Semi-rural/industrial area with industrial land uses located adjacent to and around the Site BESS Site: • 1940 Pacific Highway (Part Lot 5 & Lot 6 in DP1286735) Transmission Connections: • Across Lots 7, 8, 24, 25 and 28 DP1286735, Lot 104 DP1125747 and Lot 3 DP808004. • The

  8. Slide 8: The Site

    The Site • Area – Total site is ~22 ha.(Battery site is ~12 ha) • LGA – Port Stephens Council • Zoning – E4 (General Industrial) • Permissibility - permissible with consent within the E4 land use zone under the T&I SEPP • Design – will allow for known constraints CONFIDENTIAL | CDG Tomago BESS | Nov

  9. Slide 9: List of Environmental Chapters

    List of Environmental Chapters Project Description Noise and Vibration Hazards and Risks Bushfire Biodiversity Aboriginal Heritage Surface Water Social and Economic Soils and Contamination Air Quality Traffic and Transport Non-Aboriginal Heritage Visual Amenity Land Use Waste Cumulative Impacts CONF

  10. Slide 10: Key EIS Focus Areas

    Key EIS Focus Areas Noise and Vibration • AECOM prepared a noise and vibration impact assessment that accompanied and informed the EIS. • The noise assessment identified a single 2dBA exceedance (above the Noise Policy for Industry criteria). This exceedance is considered negligible in accordance wi

  11. Slide 11: Key EIS Focus Areas cont…

    Key EIS Focus Areas cont… Surface Water • AECOM prepared a surface water impact assessment, which accompanied the EIS. • The SWIA included an assessment to achieve NorBE outcomes (i.e., neutral or beneficial effect) • The Project proposed to connect into two discharge points on the western portion o

  12. Slide 12: Community and Stakeholder Engagement

    Community and Stakeholder Engagement AGL will continue to engage with key stakeholders throughout the Environmental Impact Assessment (EIS) and beyond • Relevant NSW and Federal Ministers • Department of Climate Change, Energy, the • Transport for NSW Environment and Water (DCCEEW) State & Federal G

  13. Slide 13: Schedule

    Schedule EIS Public EPBC Decision Submission Determination Exhibition 28 Construction September 23 3 November sought days Mid Q2 2026-2028 (not a CA) 23 July 24 November 23 CONFIDENTIAL | CDG Tomago BESS | November 2023 13

  14. Slide 14: For discussion

    For discussion 1. Stakeholder Engagement: • Company briefings • Open Days – location tba • 4-6pm Wednesday 29th November • 9-11am Saturday 2nd December 2. Other matters CONFIDENTIAL | CDG Tomago BESS | November 2023 14

  15. Slide 15: Questions

    Questions

  16. Slide 16: NGSF Update

    NGSF Update • No major Open incident, MTIs and welcome, or LTIs declarations, previous apologies, minutes, business • Workforce a rising re-structure and correspondence complete • New EA approved and signed • Minor security breach. Additional measures in place • Major maintenance activities complete

  17. Slide 17: Environment update

    Environment update (John M) 1. Bushfire Threat Assessment – next week • AGL has commissioned a third party qualified bushfire assessor to conduct a review of the NGSF • This will involve investigation of six key areas: 1. Site access 2. Asset Protection Zones 3. Utilities 4. Firewater storage 5. Lan

  18. Slide 18: Environment update

    Environment update (John M) 1. Wetland ponds • AGL has removed excess vegetation within the ponds to improve efficiency 2. Landscaping o AGL has removed excess leaves from around the flare compound as a fire precaution measure 18

  19. Slide 19: Newcastle Gas Storage Facility – Community Partnerships FY24

    Newcastle Gas Storage Facility – Community Partnerships FY24 Hunter Region Botanic Gardens - $10,000 AGL NGSF has been supporting the gardens for 7 years. An annual contribution of $10,000 will allow HRBG to carry out further infrastructure projects and initiatives so they continue to attract visito

  20. Slide 20: AGL Update

    AGL Update Newcastle Community Dialogue Group | 1 June 2023 20

  21. Slide 21: Contact

    Contact Jo Ferguson Community Relations Manager AGL Hunter Jo.ferguson@agl.com.au Newcastle Community Dialogue Group | 16 November 2023 21