Burley Minerals Ltd. · ASX:BUR
Burley Minerals — Shareholder Meeting (November 2023)
14 slides from Burley Minerals's shareholder meeting presentation, Nov 29, 2023
Slide 1: Drilling continues to define more spodumene at Chubb Lithium Project in Quebec
Drilling continues to defining more spodumene at Chubb Lithium Project in Quebec Annual General Meeting Presentation November 2023 ASX:BUR
Slide 2: Disclaimer & Forward-Looking Statements
Disclaimer & Forward-Looking Statements This presentation has been prepared by Burley Minerals Ltd “BUR”. This document contains background information about Relevant Announcements Referenced BUR current at the date of this presentation. The presentation is in summary form and does not purport to be
Slide 3: Burley Minerals Ltd - Projects
Burley Minerals Ltd - Projects Lithium and Iron Projects in world class Tier 1 mining provinces of Quebec, Canada and Western Australia Chubb Lithium Project, Quebec, Canada – 100% Interest • Known spodumene-bearing pegmatites mapped, drilled and modelled on tenure – high grade Li2O (>1.5% zone) 1 •
Slide 4: Burley Minerals Ltd - Corporate Overview
Burley Minerals Ltd - Corporate Overview Corporate Structure Bryan Dixon, BCom CAANZ AGIA ACG Non-Executive Chairman ASX Code BUR Mr Dixon has extensive experience in the mining sector and the management of publicly listed companies. Mr Dixon has held numerous executive and director roles with emerg
Slide 5: Chubb Lithium Project - World Class Lithium Province
Chubb Lithium Project - World Class Lithium Province Excellent Location in Tier 1 Lithium Province • Located in the southwest corner of Quebec, Canada and within 550 km of Montreal • Proximal to working Lithium mines and the only hard-rock spodumene mine and concentrator in Canada – NAL JV Plant • F
Slide 6: Chubb Lithium Project - Historic Drilling and Close to Mine & Concentrator
Chubb Lithium Project - Historic Drilling and Close to Mine & Concentrator Historic Drilling and Mineral Claims • Historic drilling at Chubb Central confirmed the presence of spodumene bearing lithium pegmatites in shallow, multi-stacked parallel dykes extending along strike for more than 560m, and
Slide 7: Chubb Lithium Project - Drilling Targets and Phase Drilling Program
Chubb Lithium Project - Drilling Targets and Phase Drilling Program Systematic approach to exploring the whole project • Drilling aimed at expansion of Chubb Central mineralized zone. • Mineralisation remains open to NW and SE of known mineralized zone. • ANT Geophysics survey indicates structural a
Slide 8: Chubb Lithium Project - high-grade lithium assays confirm strike of > 560 m
Chubb Lithium Project - high-grade lithium assays confirm strike of > 560 m Proven Spodumene Mineralisation at Chubb Central • Chubb Central has spodumene-bearing pegmatite with a strike length of at least 560 m, extending from surface to below 200m depth. • More than 7,800 m diamond drilling Chubb
Slide 9: Chubb North: 6 Large Pegmatite Prospects
Chubb North: 6 Large Pegmatite Prospects • Mapping and field pXRF mineral geochemistry completed in August identifies 6 pegmatite targets. • Outcropping pegmatites extend over an area of more than 200 hectares. • Preliminary 6 drill hole program designed and permitted to develop an understanding of
Slide 10: Chubb North – Abundant Pegmatite Outcrops
Chubb North – Abundant Pegmatite Outcrops An overhead view of CN3 pegmatite prospect at Chubb North with drill rig and support vehicles for scale.
Slide 11: Chubb North – Extension Pegmatite Prospect
Chubb North – Extension Pegmatite Prospect An overhead view of CN1 pegmatite prospect and north side view Geologist Paul Nagerl traversing the large CN1pegmatite outcrop Chubb North CN1 pegmatite with at least 500m strike with location of CLP049 and CLP50 diamond holes that had LCT pegmatite combine
Slide 12: Gascoyne Lithium Projects
Gascoyne Lithium Projects Mt James and Dragon Lithium ELA’s • Located within the same corridor as the Yinnetharra Lithium Project, recently owned by Delta Lithium Ltd (ASX:DLI) • Numerous known pegmatites are located throughout both project sites • A process of geophysical interpretation and potenti
Slide 13: Investment Summary: A portfolio of assets in Tier 1 Mining provinces
Investment Summary: A portfolio of assets in Tier 1 Mining provinces Chubb Lithium Project: In the world-class lithium province of Quebec, Canada • W h 20km of C ’ o op g h mm co c o • Ongoing exploration drill results from both Chubb Central and Chubb North in short and medium term Quebec, Canada G
Slide 14: Stewart McCallion ASX: BUR
For further information please contact: Stewart McCallion MANAGING DIRECTOR +61 (8) 9322 6283 ASX: BUR
Burley Minerals — Shareholder Meeting (November 2023) on 6ix