Sherritt International Corporation · TSX:S

Sherritt International — Q4 2020 Earnings Presentation

21 slides from Sherritt International's earnings presentation, Feb 11, 2021

  1. Slide 1: Q4 Earnings Call: Review of Financial and Operational Results

    Q4 Earnings Call Review of Financial and Operational Results February 11, 2021

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements This presentation contains certain forward-looking statements. Forward-looking statements on key personnel and skilled workers; the possibility of equipment and other failures; risks The Corporation may, from time to time, make oral forward-looking statements. The can gene

  3. Slide 3: Q4 Highlights

    Q4 Highlights 1. Ended year with strengthened balance sheet 2. Strong production results driven by operational excellence and measures to mitigate COVID-19 3. Year-end results largely in line with guidance 4. US$20M of re-directed distributions reduced overdue receivables 5. Recovery of nickel and c

  4. Slide 4: Review of operating results

    Review of operating results 4

  5. Slide 5: Impact of COVID-19

    Impact of COVID-19 • Limited impact on production to date • Physical distancing and intensified hygiene measures implemented • Costs for added health and safety measures have been marginal • Contributed to rescheduling of annual maintenance shutdown • Added health and safety measures to remain in ef

  6. Slide 6: Moa JV highlights

    Moa JV highlights Q4 Production(1) (tonnes) Full Year Production(1) (tonnes) Finished Nickel Finished Cobalt Finished Nickel Finished Cobalt 16,554 4,049 4,020 15,753 1,688 1,685 451 411 Q4 2019 Q4 2020 Q4 2019 Q4 2020 FY2019 FY2020 FY2019 FY2020 • Q4 2020 impacted by unplanned autoclave repairs at

  7. Slide 7: Moa JV highlights – Costs

    Moa JV highlights – Costs (1) Mining, Processing and Refining Costs (US$/lb) Net Direct Cash Cost(1) (US$/lb) $5.46 $5.31 $4.93 $4.73 $4.47 $4.14 $4.20 $3.75 Q4 2019 Q4 2020 FY2019 FY2020 Q4 2019 Q4 2020 FY2019 FY2020 • MPR costs declined by 11% in Q42020 • NDCC in Q4 2020 impacted by lower fertiliz

  8. Slide 8: Oil and Gas highlights

    Oil and Gas highlights Oil Production (Cuba GWI, bopd)(1) Unit operating costs (Cuba GWI, $/bbl(2)) $27.17 $24.23 4,175 $23.13 3,785 $21.60 2,599 2,947 Q4 2019 Q4 2020 FY2019 FY2020 Q4 2019 Q4 2020 FY2019 FY 2020 • Production impacted by natural reservoir declines • FY2020 cost increase largely due

  9. Slide 9: Power highlights

    Power highlights Electricity production (33⅓% GWh(1)) Unit operating costs ($/MWh(2)) 736 186 $26.73 602 144 $22.15 $18.22 $17.38 Q4 2019 Q4 2020 FY2019 FY2020 Q4 2019 Q4 2020 FY2019 FY2020 • Q4 2020 production impacted by reduced natural gas • Q4 2020 and FY2020 unit costs impacted by timing of ava

  10. Slide 10: Financial Highlights

    Financial Highlights sherritt

  11. Slide 11: Liquidity

    Liquidity Energas 79.8 Energas 75.0 Sherritt ended 2020 with an increase in consolidated cash and more cash in Canada 1. Net of Energas consolidation adjustment 2. Excluding interest paid on notes, Moa JV dividend distributions and redirections from GNC 11

  12. Slide 12: Status of Cuban energy receivables

    Status of Cuban energy receivables Received on Q3 2020 Expected/ receivables Q4 2020 US$M overdue due Received agreement overdue Oil & Gas - Trade receivables $ 23.1 $ 2.0 $ – $ – $ 25.1 Power Trade receivables/other $ 4.5 $ 0.9 $ (2.4)(1) $ (0.4) $ 2.6 Energas CSA $131.5 $14.0 $ – $ (27.3) $118.2 T

  13. Slide 13: Unification of Cuban currencies

    Unification of Cuban currencies Key highlights Impacts to Sherritt 1. Cuba’s dual currency system ended Dec. 31 1. All payments made in $US 2. Convertible currency (CUC) unified with domestic 2. No effect on distributions from Moa JV currency (CUP) on Jan. 1 3. Cash held at Energas unaffected 3. CUP

  14. Slide 14: Outlook

    Outlook 14

  15. Slide 15: 2021 Outlook

    2021 Outlook Moa JV • Production guidance at Moa JV consistent Finish nickel 32,000 – 34,000 tonnes with historical production Finished cobalt 3,300 – 3,600 tonnes • Production guidance reflects ongoing Net direct cash cost: US$4.25 - $4.75/lb commitment to Operational Excellence Capital Spending: U

  16. Slide 16: Outlook for OGP

    Outlook for OGP 1. PSC at Puerto Escondido/Yumuri set to expire March 19, 2021 2. Efforts to secure earn-in partner for drilling and exploration activities on Blocks 10 and 6A are ongoing 3. Power forecasts for 2021 impacted by re-scheduling of maintenance activities deferred in 2020 4. Power agreem

  17. Slide 17: Nickel and cobalt prices since July 2020

    Nickel and cobalt prices since July 2020 60% US$22.18 Cobalt +55% 50% US$8.38 Nickel +45% 40% 30% 20% 10% US$5.80 0% US$14.33 (10%) 6-Oct 13-Oct 20-Oct 27-Oct 3-Nov 10-Nov 17-Nov 24-Nov 1-Dec 8-Dec 15-Dec 22-Dec 29-Dec 5-Jan 2-Feb 9-Feb 30-Jun 7-Jul 14-Jul 21-Jul 28-Jul 4-Aug 1-Sep 8-Sep 12-Jan 19-J

  18. Slide 18: Outlook for nickel and cobalt

    Outlook for nickel and cobalt • Recent price momentum driven by economic recovery and renewed interest in electric vehicles • New government policies and automotive industry investments paving the way • Nickel remains the metal of choice for battery chemistries • Price volatility expected in the nea

  19. Slide 19: Summary

    Summary • Strongest balance sheet since financial crisis • Results for 2020 were largely in line with guidance for the year • 2021 guidance based on a number conservative forecasts • Overdue payments will be lumpy in 2021 • Long-term outlook for nickel and cobalt prices is favourable Sherritt is wel

  20. Slide 20: Q&A Discussion

    Q&A Discussion sherritt

  21. Slide 21: Sherritt International Corporation contact details

    Sherritt International Corporation 22 Adelaide West, 42nd Floor Toronto, Ontario, Canada M5H 4E3 Joe Racanelli, Director, Investor Relations Telephone: (416) 935 -2457 I Toll -Free: 1 (800) 704 -6698 Email: joe.racanelli@sherritt.com I Website: www.sherritt.com

Sherritt International — Q4 2020 Earnings Presentation on 6ix