  1. Slide 1: Dogger Bank: The wind hub in the heart of the North Sea

    Dogger Bank The wind hub in the heart of the North Sea

  2. Slide 2: The Dogger Bank Wind farm

    Creyke Beck A The Dogger Bank Wind farm Creyke Beck B Teesside A Dogger Bank Round 3 Zone Teesside converter station World-class wind speed in shallow waters Creyke Beck converter station • 3 projects: Creyke Beck A, B and Teesside A • Installed capacity per project: 1.2 GW, total 3.6 GW • Planning

  3. Slide 3: Indicative timeline

    Indicative timeline 2015 2019 2020 2023 Development consent Contract for difference Final investment decision (FID) First power generation order received awarded (CfD) for the first project, Creyke Beck A* *Creyke Beck B and Teeside A will be developed sequentially Open

  4. Slide 4: Dogger Bank – project overview

    Dogger Bank – project overview Strike prices Expected production Estimated CAPEX Project financing Creyke Beck A project Equals UK households Total The joint venture will be seeking 39.650 ~4.5 9 bn non-recourse project financing to fund the Dogger Bank development. GBP per MWh Million GBP for 3 pro

  5. Slide 5: Creating value from scale

    Creating value from scale A wind hub with an upside potential • Highly competitive engineering concepts • Leveraging Equinor’s global supply chain relationships • Innovative Operations and Maintenance (O&M) strategy with enhanced digital solutions • Additional synergies through phasing of projects •

  6. Slide 6: Wind projects in operation and construction

    Wind projects in operation and construction PROJECT Sheringham Dudgeon Hywind Arkona Cañadón León Shoal Windfarm Scotland TECHNOLOGY Under STATUS In operation In operation In operation In operation construction LEAD Equinor Equinor Equinor E.ON YPF Luz COMPANY OWNER SHARE 40% 35% 75% 50% 50% INSTALL

  7. Slide 7: Offshore wind project pipeline

    Offshore wind project pipeline PROJECT Hywind Dogger Bank Empire Wind Poland US East coast UK South Korea Tampen (NY + MA) Extensions TECHNOLOGY STATUS FID 2H 2019 Planning Planning Planning Planning Planning Planning LEAD Equinor/ Equinor Equinor / SSE Equinor Equinor Equinor KNOC COMPANY Polenergi

  8. Slide 8: Responding to the energy transition

    Responding to the energy transition Market trends • Cost reductions from technology innovation and project scale • Strong growth in the offshore wind market • Global opportunity set, new markets opening • Mature markets trending towards merchant risk • Floating offshore wind – the next frontier Equi

  9. Slide 9: Dogger Bank - The wind hub in the heart of the North Sea

    Dogger Bank - The wind hub in the heart of the North Sea © Equinor ASA This presentation, including the contents and arrangement of the contents of each individual page or the collection of the pages, is owned by Equinor. Copyright to all material including, but not limited to, written material, pho

  10. Slide 10: Hywind Tampen

    Hywind Tampen The world’s first floating offshore wind farm to supply renewable power to offshore oil and gas installations. • 11 wind turbines • Combined capacity of 88MW • Concrete substructures and shared anchors • 200.000 tons/year CO2 emission reduction Open

  11. Slide 11: Empire Wind

    Empire Wind Building an offshore wind core area on the US East Coast • Awarded capacity: 816 MW • Bottom-fixed • Next generation turbines: +10MW • Water depth: 20-40 m • Construction period: 2022 – 2023 • First power: 2024 Open