  1. Slide 1: Kalgoorlie Nickel Project – Goongarrie Hub

    Kalgoorlie Nickel Project – Goongarrie Hub A multi-decade, large scale, low cost nickel-cobalt operation Andrew Penkethman Managing Director & CEO PDAC Conference March 2025 Page 1 ASX:ARL

  2. Slide 2: Disclaimer

    Disclaimer Important notice This presentation contains general information only and is, or is based upon, information which has been released to ASX or is contained in the Ardea Resources Limited (Ardea or the Company) prospectus dated 9 November 2016 (including supplementary prospectuses dated 18 N

  3. Slide 3: Ardea Resources - Snapshot

    Ardea Resources - Snapshot Mat Longworth Non-Executive Chair Experienced across exploration, project evaluation / development including KNP and corporate management Experienced Board & management, respected Partners, Andrew Penkethman MD & CEO supportive Shareholders, tight capital structure Experie

  4. Slide 4: Multi-decade nickel-cobalt Mineral Resource

    Multi-decade nickel-cobalt Mineral Resource1 Nationally strategic KNP nickel-Cobalt MRE1 is the largest in Australia, located in Tier 1 jurisdiction KNP KNP Goongarrie Hub - 584Mt at 0.69% Ni and 0.043% Co for 4Mt of contained Ni and 250kt of contained Co 1 DFS fully funded by Partners 2 Infrastruct

  5. Slide 5: Experienced international partners

    Experienced international partners Partnership validates globally significant Critical Minerals source Staged earn in agreement with Sumitomo Metal Mining & Mitsubishi Corporation via sole funding of Kalgoorlie Nickel Pty Ltd (KNPL) in progress DFS Managing KNP Goongarrie Hub up to A$98.5M1,2 Defini

  6. Slide 6: Long life project with expansion potential

    Long life project with expansion potential Nationally strategic KNP Goongarrie Hub to strengthen the battery minerals supply chain for decades Significant source of low cost Highway Deposit 17km Goongarrie Hill Nickel-Cobalt for >40years1 2023 PFS1 • Average 30ktpa Ni and 2ktpa Co Goongarrie South •

  7. Slide 7: Unique, low cost project

    Unique, low cost project Potential lowest cost producer thanks to KNP Goongarrie Hub ore deposit characteristics & geometry Goethite Premium Ore • 25km continuous strike Mineralised Neutraliser 2 • Mainly free-digging ore makes up 69% of Plant Feed1 • Low acid consumption and energy requirements1 Go

  8. Slide 8: Ardea Exploration Pipeline Upside

    Ardea Exploration Pipeline Upside Battery and Critical Mineral exploration potential Ardea controls ~3,500km2 of tenure in the Eastern Goldfields of WA with unrivalled exploration potential • Kalpini Project - Massive nickel-copper-PGE sulphides discovered at Emu Lake (AELD0003: 2.72m at 5.42% Ni &

  9. Slide 9: Operating to high ESG standards

    Operating to high ESG standards Recruiting and retaining Strong leadership & We engage early with Innovative design governance the best people, building a skilled, passionate team First Nations Delivering a diverse, Reducing CO2 Workforce of ~50 Communities for resilient and emissions & meaningful o

  10. Slide 10: KNP Goongarrie Hub – the only Australian nickel project being meaningfully advanced

    KNP Goongarrie Hub – the only Australian nickel project being meaningfully advanced, with the best possible Partners, Sumitomo Metal Mining Co., Ltd and Mitsubishi Corporation >40 year mine life DFS Underway Project to boost Long term supply with expansion potential Consistent news flow with nationa

  11. Slide 11: Andrew Penkethman

    For further information Andrew Penkethman Managing Director & CEO +61 8 6244 5136 ASX:ARL ardea@ardearesources.com.au Keep up to date with news, videos and more at our website: www.ardearesources.com.au or follow our socials Youtube - Free social media icons A black background with a black square De

  12. Slide 12: Appendix 1 Reserves & Resources

    Appendix 1 Reserves & Resources Page 12 ASX:ARL

  13. Slide 13: Appendix - Competent Persons

    Appendix 1 - Competent Persons Information in this presentation has been summarised from ARL ASX MRE Announcement 30 June 2023, ARL ASX PFS Announcement 5 July 2023 Ore Reserves and ARL ASX Consortium Announcement 26 April 2024, 14 August 2024 and 30 August 2024. Information in this presentation tha

  14. Slide 14: KNP Global MRE

    KNP Global MRE KNP Global nickel and cobalt Mineral Resources based on a 0.5% Ni cut-off grade The Competent Persons (CP) for the Mineral Resources, are Contained Contained Mr Ian Buchhorn and Mr Andrew Penkethman, both are full-time KNP Hub Resource Category Size (Tonnes) Ni (%) Co (%) Ni (kt) Co (

  15. Slide 15: KNP Goongarrie Hub MRE

    KNP Goongarrie Hub nickel and cobalt Mineral Resources based on a 0.5% Ni cut-off grade Resource Size Ni Co Contained Metal Estimation Details Prospect Category (Mt) (%) (%) Ni (kt) Co (kt) Method Source Year KNP Goongarrie Hub MRE Measured 18 0.94 0.085 171 15 LUC Ardea 2021 Goongarrie Indicated 82

  16. Slide 16: KNP Goongarrie Hub Ore Reserve Summary

    KNP Goongarrie Hub Ore Reserve Summary Ore >= 0.5% Ni Ore > 0.5% NiEq and LOI > 25% Total Ore KNP Goongarrie Hub Ore Reserve Summary consisting of ore Ni Co Ni Co Ni Co Ni Co Ni Co Ni Co above 0.5% Ni as the feed stock for the processing facility, and ore Deposit Mt Mt Mt % % kt kt % % kt kt % % kt

  17. Slide 17: Appendix 2 2023 PFS

    Appendix 2 2023 PFS Page 17 ASX:ARL

  18. Slide 18: PFS Key Financial Metrics

    PFS Key Financial Metrics Financials PFS defines > 40-year Nickel Revenue A$ M 44,429 operation with strong Cobalt Revenue Revenue - combined A$ M A$ M 7,880 52,309 financial metrics1: EBITDA LOM A$ M 34,217 EBITDA Annual (average) A$ M 800 • Pre-tax NPV7 of A$7,625M (IRR 30%) EBITDA margin % 65% •

  19. Slide 19: PFS 2023 Capital Cost Estimate

    PFS 2023 Capital Cost Estimate KNP – Goongarrie Hub Preproduction Cost Category Costs (A$) • Contingency considered appropriate to the level of the capital cost estimate has been included Mining – overheads, mobilisation, 98M • Base date March 2023 pre-strip and other • Refer to 5 July 2023 ARL PFS

  20. Slide 20: PFS 2023 Opex

    PFS 2023 Opex KNP Goongarrie Hub estimated operating costs of US$6,000 to US10,000 per tonne Ni asset2 • Goongarrie Hub PFS Ore Reserve2 194.1Mt at 0.70% Ni and 0.05% Co for 1.36Mt of nickel and 99,000t of cobalt to sustain production of ~30,000t of nickel and 2,000t of cobalt per year for > 40 year

  21. Slide 21: DFS Key Budget Items

    DFS Key Budget Items The Consortium (SMM and MC) will DFS Cost Centre Costs (A$) fund 100% of the KNP Goongarrie Drilling 13.4M Hub DFS costs, up to the agreed Metallurgical Test Work 2.3M budget of A$98.5 million Mine Design 15.0M (incl dewatering & geotechnical) Process Plant Design 28.3M Building

  22. Slide 22: Superior HPAL Intensity

    KNP Goongarrie Hub Superior HPAL Intensity ✓ Good ore grade + good slurry density = Lower Capex & Opex $$ ✓ Atmospheric leach = stable operation, utilizes saprolite resource ✓ MHP & MSP Product = known technology & good market acceptance Operating data from Australian HPAL Producers Performance Driv

  23. Slide 23: Innovated approach to elevate ESG performance

    Innovated approach to elevate ESG performance Continual improvement within a responsible ESG framework, enhanced by innovation in plant design • Ardea’s R&D defined MN, within designed pits. This material can replace imported neutralising Mineralised material – reducing need to import lime, Neutrali

  24. Slide 24: 25 years of Goongarrie Hub stakeholder engagement and ore body knowledge

    25 years of Goongarrie Hub stakeholder ASX:ARL engagement and ore body knowledge Positive 2018 NSW projects KNP Flowsheet Update to Goongarrie Hub high Awarded Major Project Status. April 2024, Cooperation 1.5Mtpa PFS and divested via is developed and grade Ni and Co resource. Metallurgical testwork

  25. Slide 25: Appendix 3 Metal Markets

    Appendix 3 Metal Markets Page 25 ASX:ARL

  26. Slide 26: Battery demand to grow 7-fold by 2040

    Battery demand to grow 7-fold by 2040 Record 17 million Electric Vehicles (EV) sales for 2024, global EV sales grew by 25% in 2024 compared to 2023 1 Increased battery demand, along with increase in use of high-nickel cathodes will result in growing nickel demand Page 26 Graphs after: © Benchmark Mi

  27. Slide 27: Goongarrie is well positioned for growing nickel demand

    Goongarrie is well positioned for growing nickel demand KNP Goongarrie Hub production is aligned with expected nickel market deficits from 2028 onwards • 2023-24 nickel surplus has led to higher cost producers cutting or ceasing production in Australia (eg BHP) and internationally Expected Goongarri

  28. Slide 28: Potential upside of Scandium as a by-product

    Potential upside of Scandium as a by-product1 • Scandium is a lightweight, soft metal with a high melting point, good electrical and heat conductivity. • Scandium as an alloy, increases the strength of aluminium, reduces 20x its weight and improves other qualities • Scandium plays an important role

  29. Slide 29: Appendix 4 KNPL

    Appendix 4 KNPL Page 29 ASX:ARL

  30. Slide 30: Partnership detail

    Partnership detail Partnership validates KNP Goongarrie Hub’s global significance as a desirable Critical Minerals source 80% 20% Non KNP Goongarrie KNP Goongarrie Hub Incorporated Consortium has received support under Japanese Joint Venture (IJV) Ministry of Economy, Trade and Industry (METI) Hub P

  31. Slide 31: KNP Goongarrie Hub – Strong global interest

    KNP Goongarrie Hub – Strong global interest KNPL and Ardea hosted a recent site visit for representatives from JOGMEC, METI and JC Above: The KNPL team with Ardea’s Andrew Penkethman and Michael Rodriguez and representatives from the Japan Organization for Metals and Energy Security (JOGMEC), the Ja