Golden Minerals Company · TSX:AUMN

Golden Minerals — Investor Presentation (May 2017)

25 slides from Golden Minerals's investor presentation, May 9, 2017

  1. Slide 1: Corporate Presentation

    Corporate Presentation May 9, 2017

  2. Slide 2: Cautionary Statements

    Cautionary Statements Cautionary Note Regarding Forward Looking Statements: Statements made regarding matters which are not historical facts, such as expectations regarding the oxide plant lease, including its term and anticipated net cash payments; statements regarding the Santa Maria PEA results (

  3. Slide 3: Cautionary Statements (2)

    Cautionary Statements (2) Cautionary Statement regarding Mineralized Material "Mineralized material" as used in this presentation, although permissible under the Securities and Exchange Commission’s (SEC) Industry Guide 7, does not indicate "reserves" by SEC standards. We cannot be certain that any

  4. Slide 4: Business Strategy

    Business Strategy • Establish Golden Minerals as a mid-tier precious metals mining company, focused in Mexico • Explore properties selected for high grades, low development costs and near-term production • Priority to properties within haulage distance of Golden’s Velardeña mills • Acquire advanced

  5. Slide 5: Why Mexico?

    Why Mexico? ‐ World’s largest silver producing country Pesos per dollar ‐ Government supportive of mining industry; fast permitting timelines ‐ Mexican peso remains weak relative to dollar Pesos per Ag oz ‐ Strong future operational advantage as substantial portion of mining and processing costs wil

  6. Slide 6: Precious Metals Focus in Mexico and Argentina

    Precious Metals Focus in Mexico and Argentina 5

  7. Slide 7: Principal Projects - Mexico

    Principal Projects - Mexico SANTA MARIA • Silver and gold mine RODEO • Golden has right to acquire • Near‐surface gold deposit • PEA and updated NI 43‐101 • Trucking distance to resource reported March 2017 Velardeña oxide mill • Work continues to optimize • 43‐101 resource reported operating plans

  8. Slide 8: Santa Maria

    Santa Maria • Silver and gold mine near Parral District in southern Chihuahua State • Golden has the right to acquire the property under an option agreement - $0.9M to acquire 100% of property • PEA and updated NI 43-101 released March 2017 • Next steps: optimize operating plans, complete permitting

  9. Slide 9: Santa Maria – Mar. 2017 PEA Highlights

    Santa Maria – Mar. 2017 PEA Highlights 1 • $6.3M post-tax NPV and 84% pre-tax IRR at current metals prices 1 • Low capital costs: $1.0 initial + $0.2M sustaining = $1.2 million • Payback in month 16 • Life of mine (LOM) 3.2 years • LOM free cash flow $8.2 million • LOM Ag production 2.0 Moz; LOM Au

  10. Slide 10: Santa Maria – Mar. 2017 PEA Highlights

    Santa Maria – Mar. 2017 PEA Highlights Unit Cost Total Value Description ($/t‐milled) ($M) Net Smelter Return $152.77 $32.2 • 38-month underground mining Land Acquisition Net Revenue ‐$4.91 $147.86 $1.0 $31.2 operation Operating Costs Mining $55.77 $11.7 • Initially uses pre-existing Processing G&A

  11. Slide 11: Santa Maria – 2017 Mineral Resource Estimate

    Santa Maria – 2017 Mineral Resource Estimate The March 2017 NI 43-101-compliant mineral resource estimate incorporates results of 24 additional drill holes and 460 channel samples from drifts and the trial mining face. This has allowed for a more than doubling of the indicated resource since the pre

  12. Slide 12: Drilling to Date - Santa Maria

    Drilling to Date - Santa Maria Exploration 2014 to 2016 Ramp entrance Total 5066 mts in 37 holes 2184 m in 24 underground holes 2882 m in 13 surface holes 11

  13. Slide 13: Long Section - Santa Maria

    Long Section - Santa Maria Santa Maria Long Section West East ? ? Grade of vein intercept in drill hole, Ag g/t ? Open Open 12

  14. Slide 14: Rodeo

    Rodeo • 1,900 ha gold project located 80 km west of Velardeña; acquired in 2015 • 2,080-meter core drilling program conducted in 2016 • NI 43-101 resource announced Jan. Quartz vein outcrop 2017 • Potential future open-pit source of material for Velardeña’s oxide mill • 2017 plans include metallurgi

  15. Slide 15: Rodeo NI 43-101

    Rodeo NI 43-101 Mineral Resource Estimate Base Case (Mill Processing Pit Constrained) 1 Cutoff Au oz Ag oz Waste: Classification (M) Au g/t Ag g/t AuEq g/t (‘000) (M) Resource Indicated 0.83 0.4 3.3 11 46 0.2 0.91 Inferred ‐ ‐ ‐ ‐ ‐ ‐ ‐ Notes: (1) Cutoff grade and Au equivalent calculated using meta

  16. Slide 16: Rodeo NI 43-101 (2)

    Rodeo NI 43-101 (2) Mineral Resource Alternative Case (Heap Leach Processing Pit Constrained) 1 Cutoff Au oz Ag oz Waste: Classification (M) Au g/t Ag g/t AuEq g/t (‘000) (M) Resource Indicated 0.17 3.6 0.8 12 94 1.4 0.53 Inferred 0.17 3.6 0.4 11 47 1.3 Notes: (1) Cutoff grade and Au equivalent calc

  17. Slide 17: Rodeo Surface Map

    Rodeo Project - Surface Map ‘| b } Mill processing pit (base case) Rodeo Pit Outlines GMC drill hole Historic drill hole Rodeo Faults Hydrothermal Breccia Quartz Vein Ignimbrite Cretaceous Sediments Rhyolite Contours (20m) S \ { Heap-leach pit (alternative case) Torreon Rodeo Project a * Velardefa M

  18. Slide 18: Celaya Property Overview

    Celaya Property Overview • 5,600 ha silver and gold property located 10 km east of Plata Latina’s Naranjillo silver and gold discovery and 45 km southeast of the historic Guanajuato District in Guanajuato State • High grade epithermal gold and silver mineralization discovered beneath clay-silica alt

  19. Slide 19: Celaya Farm-Out

    Celaya Farm-Out • Golden received $0.2M at signing • Electrum to incur exploration expenditures of $0.5M in year one, and can elect to acquire a 60% interest in the property by incurring $2.5M of exploration costs in the first three years • Thereafter, Golden has the right to maintain its 40% intere

  20. Slide 20: Velardeña Overview

    Velardeña Overview • 560 ha silver and gold property with two underground mines and two processing plants • Mines on care and maintenance until current metals prices and mine plans indicate sustainable positive operating margin • NI 43-101 PEA (Feb. 2015; Tetra Tech) in place Velardeña Grade Silver

  21. Slide 21: Velardeña Plant Lease

    Velardeña Plant Lease • Oxide plant leased to Hecla Mining Company: • In Q3 16, contract extended by six months, through June 30, 2017 • In Q1 17, further extended for 18 months, through December 31, 2018 • Hecla began tailings impoundment expansion in Q1 17 • Hecla processing its intended throughpu

  22. Slide 22: Argentina

    Argentina • El Quevar silver project, 55,000 ha, Salta Province • 2km strike length; resource remains open to east & west • NI 43-101 resource in place (June 2012, RungePincockMinarco) • 32 M oz Ag Indicated • 30 M oz Ag Inferred • Significant exploration conducted: • Over 1,200 meters underground e

  23. Slide 23: Total Company Resources

    Total Company Resources Grade Tonnes Silver Gold Silver Eq. Silver Gold (M) (M oz) (‘000 oz) (M oz) g/t g/t Velardeña Properties Measured 0.4 4.3 65 8.9 321 4.9 Indicated 1.0 9.5 126 18.4 311 4.1 Inferred 1.6 16.4 239 33.2 320 4.7 El Quevar Indicated 7.1 32.0 ‐ 32.0 141 n/a Inferred 6.2 30.2 ‐ 30.2

  24. Slide 24: Key Facts

    Key Facts Stock Symbols NYSE MKT and TSX: AUMN Corporate Headquarters Golden, Colorado Stock Price (5/2/17), 52‐Wk Hi/Lo close (US) $0.48 ($0.78/$0.48) Shares Outstanding (5/2/17) 89.7 M Warrant Shares Outstanding 17.6 M Options & Restricted Stock Units 1.7 M KELTIP* Units 0.6 M Shares Outstanding ‐

  25. Slide 25: Contact Information

    Contact Information Investor Relations Karen Winkler, Director of Investor Relations Phone: 303.839.5060 Email: investor.relations@goldenminerals.com Corporate Headquarters 350 Indiana Street, Suite 800 Golden, Colorado 80401 Tele. 303.839.5060 Corporate website www.goldenminerals.com Transfer Agent

Golden Minerals Company — Investor Presentation (May 2017) on 6ix