Golden Minerals Company · TSX:AUMN
Golden Minerals — Investor Presentation (May 2017)
25 slides from Golden Minerals's investor presentation, May 9, 2017
Slide 1: Corporate Presentation
Corporate Presentation May 9, 2017
Slide 2: Cautionary Statements
Cautionary Statements Cautionary Note Regarding Forward Looking Statements: Statements made regarding matters which are not historical facts, such as expectations regarding the oxide plant lease, including its term and anticipated net cash payments; statements regarding the Santa Maria PEA results (
Slide 3: Cautionary Statements (2)
Cautionary Statements (2) Cautionary Statement regarding Mineralized Material "Mineralized material" as used in this presentation, although permissible under the Securities and Exchange Commission’s (SEC) Industry Guide 7, does not indicate "reserves" by SEC standards. We cannot be certain that any
Slide 4: Business Strategy
Business Strategy • Establish Golden Minerals as a mid-tier precious metals mining company, focused in Mexico • Explore properties selected for high grades, low development costs and near-term production • Priority to properties within haulage distance of Golden’s Velardeña mills • Acquire advanced
Slide 5: Why Mexico?
Why Mexico? ‐ World’s largest silver producing country Pesos per dollar ‐ Government supportive of mining industry; fast permitting timelines ‐ Mexican peso remains weak relative to dollar Pesos per Ag oz ‐ Strong future operational advantage as substantial portion of mining and processing costs wil
Slide 6: Precious Metals Focus in Mexico and Argentina
Precious Metals Focus in Mexico and Argentina 5
Slide 7: Principal Projects - Mexico
Principal Projects - Mexico SANTA MARIA • Silver and gold mine RODEO • Golden has right to acquire • Near‐surface gold deposit • PEA and updated NI 43‐101 • Trucking distance to resource reported March 2017 Velardeña oxide mill • Work continues to optimize • 43‐101 resource reported operating plans
Slide 8: Santa Maria
Santa Maria • Silver and gold mine near Parral District in southern Chihuahua State • Golden has the right to acquire the property under an option agreement - $0.9M to acquire 100% of property • PEA and updated NI 43-101 released March 2017 • Next steps: optimize operating plans, complete permitting
Slide 9: Santa Maria – Mar. 2017 PEA Highlights
Santa Maria – Mar. 2017 PEA Highlights 1 • $6.3M post-tax NPV and 84% pre-tax IRR at current metals prices 1 • Low capital costs: $1.0 initial + $0.2M sustaining = $1.2 million • Payback in month 16 • Life of mine (LOM) 3.2 years • LOM free cash flow $8.2 million • LOM Ag production 2.0 Moz; LOM Au
Slide 10: Santa Maria – Mar. 2017 PEA Highlights
Santa Maria – Mar. 2017 PEA Highlights Unit Cost Total Value Description ($/t‐milled) ($M) Net Smelter Return $152.77 $32.2 • 38-month underground mining Land Acquisition Net Revenue ‐$4.91 $147.86 $1.0 $31.2 operation Operating Costs Mining $55.77 $11.7 • Initially uses pre-existing Processing G&A
Slide 11: Santa Maria – 2017 Mineral Resource Estimate
Santa Maria – 2017 Mineral Resource Estimate The March 2017 NI 43-101-compliant mineral resource estimate incorporates results of 24 additional drill holes and 460 channel samples from drifts and the trial mining face. This has allowed for a more than doubling of the indicated resource since the pre
Slide 12: Drilling to Date - Santa Maria
Drilling to Date - Santa Maria Exploration 2014 to 2016 Ramp entrance Total 5066 mts in 37 holes 2184 m in 24 underground holes 2882 m in 13 surface holes 11
Slide 13: Long Section - Santa Maria
Long Section - Santa Maria Santa Maria Long Section West East ? ? Grade of vein intercept in drill hole, Ag g/t ? Open Open 12
Slide 14: Rodeo
Rodeo • 1,900 ha gold project located 80 km west of Velardeña; acquired in 2015 • 2,080-meter core drilling program conducted in 2016 • NI 43-101 resource announced Jan. Quartz vein outcrop 2017 • Potential future open-pit source of material for Velardeña’s oxide mill • 2017 plans include metallurgi
Slide 15: Rodeo NI 43-101
Rodeo NI 43-101 Mineral Resource Estimate Base Case (Mill Processing Pit Constrained) 1 Cutoff Au oz Ag oz Waste: Classification (M) Au g/t Ag g/t AuEq g/t (‘000) (M) Resource Indicated 0.83 0.4 3.3 11 46 0.2 0.91 Inferred ‐ ‐ ‐ ‐ ‐ ‐ ‐ Notes: (1) Cutoff grade and Au equivalent calculated using meta
Slide 16: Rodeo NI 43-101 (2)
Rodeo NI 43-101 (2) Mineral Resource Alternative Case (Heap Leach Processing Pit Constrained) 1 Cutoff Au oz Ag oz Waste: Classification (M) Au g/t Ag g/t AuEq g/t (‘000) (M) Resource Indicated 0.17 3.6 0.8 12 94 1.4 0.53 Inferred 0.17 3.6 0.4 11 47 1.3 Notes: (1) Cutoff grade and Au equivalent calc
Slide 17: Rodeo Surface Map
Rodeo Project - Surface Map ‘| b } Mill processing pit (base case) Rodeo Pit Outlines GMC drill hole Historic drill hole Rodeo Faults Hydrothermal Breccia Quartz Vein Ignimbrite Cretaceous Sediments Rhyolite Contours (20m) S \ { Heap-leach pit (alternative case) Torreon Rodeo Project a * Velardefa M
Slide 18: Celaya Property Overview
Celaya Property Overview • 5,600 ha silver and gold property located 10 km east of Plata Latina’s Naranjillo silver and gold discovery and 45 km southeast of the historic Guanajuato District in Guanajuato State • High grade epithermal gold and silver mineralization discovered beneath clay-silica alt
Slide 19: Celaya Farm-Out
Celaya Farm-Out • Golden received $0.2M at signing • Electrum to incur exploration expenditures of $0.5M in year one, and can elect to acquire a 60% interest in the property by incurring $2.5M of exploration costs in the first three years • Thereafter, Golden has the right to maintain its 40% intere
Slide 20: Velardeña Overview
Velardeña Overview • 560 ha silver and gold property with two underground mines and two processing plants • Mines on care and maintenance until current metals prices and mine plans indicate sustainable positive operating margin • NI 43-101 PEA (Feb. 2015; Tetra Tech) in place Velardeña Grade Silver
Slide 21: Velardeña Plant Lease
Velardeña Plant Lease • Oxide plant leased to Hecla Mining Company: • In Q3 16, contract extended by six months, through June 30, 2017 • In Q1 17, further extended for 18 months, through December 31, 2018 • Hecla began tailings impoundment expansion in Q1 17 • Hecla processing its intended throughpu
Slide 22: Argentina
Argentina • El Quevar silver project, 55,000 ha, Salta Province • 2km strike length; resource remains open to east & west • NI 43-101 resource in place (June 2012, RungePincockMinarco) • 32 M oz Ag Indicated • 30 M oz Ag Inferred • Significant exploration conducted: • Over 1,200 meters underground e
Slide 23: Total Company Resources
Total Company Resources Grade Tonnes Silver Gold Silver Eq. Silver Gold (M) (M oz) (‘000 oz) (M oz) g/t g/t Velardeña Properties Measured 0.4 4.3 65 8.9 321 4.9 Indicated 1.0 9.5 126 18.4 311 4.1 Inferred 1.6 16.4 239 33.2 320 4.7 El Quevar Indicated 7.1 32.0 ‐ 32.0 141 n/a Inferred 6.2 30.2 ‐ 30.2
Slide 24: Key Facts
Key Facts Stock Symbols NYSE MKT and TSX: AUMN Corporate Headquarters Golden, Colorado Stock Price (5/2/17), 52‐Wk Hi/Lo close (US) $0.48 ($0.78/$0.48) Shares Outstanding (5/2/17) 89.7 M Warrant Shares Outstanding 17.6 M Options & Restricted Stock Units 1.7 M KELTIP* Units 0.6 M Shares Outstanding ‐
Slide 25: Contact Information
Contact Information Investor Relations Karen Winkler, Director of Investor Relations Phone: 303.839.5060 Email: investor.relations@goldenminerals.com Corporate Headquarters 350 Indiana Street, Suite 800 Golden, Colorado 80401 Tele. 303.839.5060 Corporate website www.goldenminerals.com Transfer Agent
Golden Minerals Company — Investor Presentation (May 2017) on 6ix