Slide 1: Corporate Presentation January 2021
CORPORATE PRESENTATION Janaury 2021 Photo by Magda Biernat
Slide 2: Forward Looking Statements
Forward Looking Statements The reader is advised that the PEA summarized in this presentation is preliminary in nature and is intended to provide an initial, high- level review of the project’s economic potential and design options. The PEA mine plan and economic model includes numerous assumptions
Slide 3: Forward Looking Statements
Forward Looking Statements Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation, that all technical, economical and financial conditions will be met in order to achieve such events qualified by
Slide 4: Disclaimer
Disclaimer NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes Under the United States Securities and Exchange Commission’s (the “SEC”) Industry standards for all public disclosure an issuer makes of scientific and technical Guide 7 as currently in effect (“Guide
Slide 5: Corporate Structure
Corporate Structure Stock Symbol NBY - TSX-V Major Shareholders (fully diluted) Share Price $0.60 Osisko Development Inc 15% Osisko Mining Inc 10% Shares Outstanding 70 M Caisse Dépôt Placement 10% Options 4M Management 7% Warrants 9M Market Cap $42 M Cash on hand $13 M 52-week High/Low $0.20-$0.80
Slide 6: Board & Management
Board & Management Management Directors Claude Dufresne, P.eng. - President & CEO Serge Savard. - Chairman + 20 years Nb business: Ex-NHL, Businessman, Real Estate Iamgold, Camet, Cambior Derek Teevan, MES - VP Aboriginal & Jacques Bonneau, P.Geo - Director Governmental Ex-Mazarin/ Niobec + 20 years
Slide 7: What is Niobium?
What is Niobium? • Niobium (Nb) is naturally occurring refractory transition metal, with impressive characteristics,: • High heat resistance • High durability • Highly stable • These properties have led to the incorporation of Niobium in the manufacturing process of a wide array of products and tech
Slide 8: A Green Metal
A Green Metal Why Niobium? • From lighter, stronger components for every type of vehicle, to safer, faster-charging batteries, Niobium is playing a key role in advanced materials that are driving innovation, performance, safety and efficiencies in the Mobility sector. • Niobium transforms materials,
Slide 9: Niobium – A Green Metal: Construction Sector
Niobium – A Green Metal Construction Sector • Niobium enhances strength, toughness, and formability of steel which can help make projects more sustainable and efficient by reducing their carbon footprint and contributing to dematerialization in the construction industry. • By incorporating small amo
Slide 10: Niobium – A Green Metal: Mobility Sector
Niobium – A Green Metal Mobility Sector • Makes vehicles lighter, safer and smarter. • Revolutionary Third generation battery • Fast Charging, higher density, safer Toshiba Next-generation SCiB™ battery anode, made of Niobium Titanium Oxide (NTO), supporting smart mobility in the age of MaaS (Mobili
Slide 11: Niobium – A Green Metal: Electrification
Niobium – A Green Metal Electrification • The lithium-ion batteries that power our cell phones, laptop computers and electric cars are a necessary part of our every-day life. • As we increasingly transition to electric vehicles for transportation and mobility, even lithium-ion batteries will need im
Slide 12: Niobium – A Green Metal: Energy Sector
Niobium – A Green Metal Energy Sector • Today’s batteries cannot safely offer fast charging while maintaining a high energy density. • Graphite and silicon anodes enable high energy density cells, but it is unsafe to fast charge them. • LTO (Lithium-Titanate) anodes enable safe fast charge but suffe
Slide 13: Niobium – A Green Metal: Energy Sector
Niobium – A Green Metal Energy Sector Niobium is increasingly being applied in the composition of lithium-ion battery materials to meet the increasing demand for higher performance, longer-life, and safer batteries TSXV:NBY Source: CBMM 13
Slide 14: James Bay Niobium Project
James Bay Niobium Project Description Project Map • 42 km south of Moosonee, in the James Bay Lowlands, Ontario, Canada • 42 km south of Moosonee, ON • Airport (2 runways, 1.2km & 1km) • Rail line from Cochrane • Powerline 38 km from project • Winter Road (Wetum Road) – 12km from project • Located w
Slide 15: PEA Mining Scenarios
PEA Mining Scenarios 1. 1. Open Pit 2. Open 2. Open Pit Pit + Underground + Underground 3. Underground 3. Underground + Employment/contractor Opportunity + Employment/contractor Opportunity + Lower footprint (borrow pit ?) + Lower mining cost + Lower footprint + Carbon Free possibility (EV fleet) +
Slide 16: PEA Summary Economic Impact
PEA Summary Open Pit Open Pit + UG Underground Economic Impact Pre-Tax Internal Rate of Return (IRR) 33.6% 33.4% 26.0% Pre-Tax Net Present Value (NPV) 8% $1,475 M $1,268 M $1,104 M Pre-Tax Payback (years) 2.6 years 2.5 years 3.8 years After-Tax Internal Rate of Return (IRR) 27.5% 27.0% 21.6% • $500
Slide 17: Niobium Peer Group Comparison
Niobium Peer Group Comparison James Bay has competitive resources and high recoveries amongst Niobium Peer Group Resources (Mt) Recoveries (%) OPEX Comparison (US$/kg Nb) 90 85% 84Mt2 82%1 80 80% 78% 75Mt4 72Mt3 71Mt 70 75% 60 70% 65%4 50 65% 63%2 61%3 40 60% 36Mt1 30 55% Elk Creek, James Bay, Panda
Slide 18: Niobium Peer Group Comparison
Niobium Peer Group Comparison NPV/ CAPEX Mine life / Payback CAPEX / LOM Nb Prod. 2,500 $6.881 $7.00 Niocorp1 Elk Creek, NioCorp 12.6 1 2,000 $6.00 $5.00 1,500 James Bay OP, NPV (C$ M) 9.4 NioBay US$/ kg Nb $4.00 $3.572 1,000 $2.943 $2.884 Niobay $3.00 Panda Hill, Cradle 6.3 3 $2.39 Cradle3 $2.00 50
Slide 19: High Value Relative to Base Metals
High Value Relative to Base Metals The project is well positioned to deliver high returns will relatively low initial capital requirement compared to Exploration/ Development stage base metal projects è NAV/CAPEX of 1.98x vs. 1.42x P/NAV1 NAV/CAPEX1 Eva, Copper Mountain, Australia, Cu 0.29x Vermel h
Slide 20: Program for 2021
Program for 2021 • 12,000 m infill drill program • Environmental Baseline • Move Inferred to Indicated resources • NioBay & MCFN • Explore high-grade zone raking north • Mineral Resource Estimate Update • Pre-Feasibility Study • G Mining Services Ltd. – TBC • RPA - Q3 2021 • Begin Q4 2021 – 6 to 9 m
Slide 21: Moose Cree First Nation
Moose Cree First Nation • Chief & Council elected July 2019 (4 years term). • Favorable to engage with resource developers. • Seeking opportunities for local community. • Signed an update “Protection Agreement’’ for early exploration programs. • Discussion on a Development Protocol. • Partnership Ag
Slide 22: Regulatory Roadmap
Regulatory Roadmap MCFN Community Meetings Protection Agreement Update (if required) Environmental Baseline led by MCFN 2020-2021 Exploration Permit Application MCFN Business and Training Planning Advanced Exploration Definition Drilling Environmental Assessment Construction Decision Pre Feasibility
Slide 23: An Investment in NioBay
An Investment in NioBay Minable Historic Resource with Team Capable of Bringing it Through to Production Our Value Experienced Team A Team that has Built Mines Claude Dufresne P. Eng. - CEO & Director Jacques Bonneau, P.GEO - Director • 40+ years experience in the mining industry in the Region • 20+
Slide 24: Thank You!
Thank You ! Claude Dufresne, P.Eng. President & CEO NioBay Metals Inc 300-1100 Ave Canadiens-de-Montreal Montreal, QC H3B 2S2 cdufresne@niobaymetals.com TSXV:NBY 24
Slide 25: Niobium Market
NioBay! METALS Niobium Market TSXV:NBY 25
Slide 26: Niobium Supply
Niobium Supply Capacity 100,000 tpy Nb +500M t @ 2.5% Nb2O5 2019 Sales Price setter – cost: <10$/kg Nb Araxa, Brazil Capacity 8,500 tpy Nb 50M t @ 1% Nb2O5 8% Poor recovery, Chinese owned Cost: +12$/kg Nb, 11% Catalao, Brazil 82,000 t Capacity 7,000 tpy Nb Nb +75M t @ 0.56% Nb2O5 80% Only U/G Nb ope
Slide 27: Marketing Strategy
Marketing Strategy Sale FeNb (t Nb) 250,000 James Bay Project aims to supply no more than 5% WS No ‘action’ anticipated by CBMM 200,000 150,000 CBMM sales continue to grow 100,000 50,000 - 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 World James Bay CBMM TSXV:
Slide 28: Marketing Strategy
Marketing Strategy Looking to become the smallest producer with 5% market share 90% 6.0% 5.5% 85% 5.0% Step-Up possibility ? 4.5% 80% 4.0% 75% 3.5% 3.0% 70% 2.5% James Bay Sand Box 65% 2.0% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 CBMM Step-Up James Bay TS
Slide 29: Niobium Demand Globally
Niobium Demand Globally 170,000 150,000 130,000 Tonnes Nb 110,000 90,000 70,000 Financial Crisis COVID-19 6% CAGR 50,000 30,000 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 2
Slide 30: Niobium Prices
USD / kg Nb TSXV:NBY 25 30 35 40 45 50 20 04 20 05 20 06 20 07 20 08 20 Source: HIS Markit / Company forecasts 09 20 10 20 11 Niobium Prices 20 12 20 Financial Crisis 13 20 14 20 15 20 16 20 17 20 18 20 19 COVID-19 20 20 20 21 20 22 20 23 20 24 20 25 20 26 20 27 20 Forecasts 28 20 29 20 30 20 31 20
Slide 31: Niobium Demand by Region
Niobium Demand by Region 2019 2009 Others 26% China Others 25% 30% China 36,500 t 38% 82,000 t Nb Nb N.A. 17% N.A. Europe 15% 28% Europe 21% TSXV:NBY Source: HIS Markit for ferro-niobium market 31
Slide 32: Technical Information
Technical Information Mr. Claude Dufresne, P. Eng., President, CEO and director of the Company, is the Qualified Person (as defined in National Instrument 43-101) who has reviewed this presentation and is responsible for the technical information reported herein, including verification of the data d