Greentech Metals Ltd. · ASX:GRE
Greentech Metals — Investor Presentation (July 2023)
21 slides from Greentech Metals's investor presentation, July 2023
Slide 1: Discovering Tomorrow's Battery Metals Today
Discovering Tomorrow’s Battery Metals TODAY ASX:GRE July 2023
Slide 2: Disclaimer
Disclaimer Forward-Looking Statements Competent Person Statement Statements in this announcement which are not statements of historical facts, The information in this report that relates to Exploration Targets, including but not limited to those relating to the proposed transaction, are Exploration
Slide 3: Market Information
Market Information Shares on Issue Cash at Bank 0.6 25 69.8m ~$4m 0.5 20 Share Options Market Cap 0.4 16m ~$30m* Millions 15 *as at 12/07/23 0.3 10 0.2 Shareholders 5 Top 5: ~33% Artemis Resources Ltd 0.1 Top 20: ~50% 10% 0 0 Sorrento Resources Ltd 7% 22 22 22 2 2 2 2 3 3 3 3 3 02 02 02 02 02 02 02
Slide 4: Experienced Board of Directors
Experienced Board of Directors Thomas Reddicliffe Guy Robertson Rod Webster Executive Director Non-Executive Director Non-Executive Director Mr Reddicliffe is a geologist with Mr Robertson has 30 years’ Mr Webster is a mining some 40 years of largely experience as a Director, CFO engineer (Universit
Slide 5: Project Portfolio
Project Portfolio Battery Metal Exposure ü Lithium ü Copper ü Nickel 5 CORPORATE PRESENTATION
Slide 6: Pilbara Project Summary
Pilbara Project Summary The Pilbara Projects • 225km2 under tenure • Granted MLs at Whundo/Ayshia and Yannery • Prospective for mafic intrusion hosted NiS, VMS style Cu-Zn-Co Kobe Li deposits and lithium pegmatites. Kobe - Lithium • A new and exciting lithium discovery - assays return a high of 1.8%
Slide 7: Lithium M&A 2023
Lithium M&A 2023 7 CORPORATE PRESENTATION ASX:GRE
Slide 8: The Lithium Market
The Lithium Market The Right Market Lithium demand expected to increase to +3mt by 2030 The Right Location Western Australia Tier 1 Mining Jurisdiction The Right People Successful track record of lithium exploration and project development 8 CORPORATE PRESENTATION
Slide 9: Kobe – Lithium
Kobe – Lithium An exciting new project on existing Greentech tenements: • Assays report up to 1.8% Li2O, with mineralisation confirmed as spodumene • Significant sampling assays recorded include; ü 1.80% Li2O (Sample No 23GT11-041) ü 1.70% Li2O (Sample No 23GT11-042) ü 1.65% Li2O (Sample No 23GT06_0
Slide 10: Kobe – A New Lithium Frontier
Kobe – A New Lithium Frontier • Strong pipeline of near- term exploration activity planned to refine priority target areas including further rock chip sampling, soil geochemistry and mapping programs • POW’s lodged for maiden RC drilling program at Kobe prospect – drilling commencement subject to re
Slide 11: Whundo – Cu/Zn Project
Whundo – Cu/Zn Project Early Drilling Targeting Resource Growth • Drilling program 6,000m + completed • Best results included: • 32m @ 2.43% Cu from 75m • 62m @ 1.12% Cu, 1.36% Zn and 0.36g/t Ag from 21m • A typical VMS field • High grade thick cores, low grade thin periphery • Multiple prospects in
Slide 12: Austin – The Sleeping Giant
Austin – The Sleeping Giant A separate mineralised event • Open in all directions • All drilling completed at average depths of less than 250m Recent drill intercepts include: ü 19m @ 0.81% Cu and 0.15% Zn from 225m, including ü 15m @ 1% Cu from 226m, and ü 6m @ 2% Cu from 226m, and ü 1m @ 5.4% Cu f
Slide 13: Whundo - Copper-Zinc
Whundo - Copper-Zinc An advanced exploration asset • An area of ~9km² located ~40km south- southwest of Karratha, Western Australia, within the West Pilbara Mineral Field. • Previous production at Whundo includes: Whim Creek Consolidated NL open pit mine produced 6,700 tonnes at 27.4% copper from Wh
Slide 14: Ayshia Yannery
Ayshia Yannery • Mineralised zone up to 100m wide plunges to the north at 350 - 400 and remains open at depth • 800m north-east from Whundo • JORC 2012 Inferred Resource: 0.9Mt @ 1.14% Cu, 1.14% Zn • Headlined by hole 23GTRC009 *Resource can be upgraded to JORC 2012 Indicated with limited ü 21m @ 2.
Slide 15: Whundo - Horizontal outlook
Whundo - Horizontal outlook Surface/underground workings 15 CORPORATE PRESENTATION ASX:GRE
Slide 16: >100% Increase to Mineral Resource
>100% Increase to Mineral Resource Greentech has achieved a greater than 100% increase at Whundo since IPO Current: Total Mineral Resource Estimate (MRE) currently 6.2 Mt @ 1.12% Cu, 1.04% Zn Resource at IPO: • Whundo: 2.7mt @ 1.14% Cu & 1.14% Zn • Ruth Well: 152kt @ 0.5% Cu & 0.6% Ni Whundo/Ayshia
Slide 17: Ruth Well - Nickel-Copper
Ruth Well - Nickel-Copper A fourth advanced exploration asset • An area of ~58km2 located approximately 15km south of Karratha, Western Australia, within the West Pilbara Mineral Field. • The Ruth Well nickel–copper deposit was discovered in 1971 • JORC 2012 indicated resource of 265,000t at 0.4% Cu
Slide 18: Upcoming Work Program
Upcoming Work Program July 2023 August 2023 Ruth Ground recon Target Follow up drilling Maiden Well/Kobe at Bertram identification for at Austin and Drilling at ground recon project lithium drilling Yannery Kobe July 2023 July/Aug January 2023 2023 Sept / Oct 2023 18 CORPORATE PRESENTATION ASX:GRE
Slide 19: Positive Outlook
Positive Outlook ü Exciting Kobe Lithium project, will only get bigger ü Current Cu/Zn resource 6.1mt and increasing ü Cu resource on existing mining licenses ü Close to Karratha port, airport and logistics ü Current insitu Cu value >AUD$800m1 ü Funding in place for further exploration - ~$4m cash a
Slide 20: Investment Proposition
Investment Proposition High quality project Substantial exploration Close to processing portfolio in tier #1mining upside facilities and on granted jurisdiction Numerous targets mining licenses Li, Cu, Ni lined up for testing Potential fast track to copper production. 20 CORPORATE PRESENTATION ASX:G
Slide 21: Contact
ASX:GRE Contact Thomas Reddicliffe Address Website Technical Director C/- Level 8, 99 St Georges Terrace GreenTechmetals.com M: +61 437 384 213 Perth WA 6000 E: info@greentechmetals.com