Arizona Eagle Mining Corp. · TSXV:AZEM
Arizona Eagle Mining — Investor Presentation (September 2026)
29 slides from Arizona Eagle Mining's investor presentation, September 2026
Slide 1: Regenerating Past-Producing High-Grade Gold Mines in Arizona
ARIZONA EAGLE MINING Regenerating Past - Producing High - Grade Gold Mines in Ariz ona 1 Investor Presentation September 2026 TSXV: AZEM | OTCQB: AZEMF
Slide 2: Forward Looking Statement
Forward Looking Statement This presentation contains "forward -looking information" within the meaning of applicable Canadian securities legislation and “forward -looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 , including statements as to
Slide 3: Disclaimer
Disclaimer This presentation is provided solely for informational purposes and does not constitute an offer to buy, sell, issue or subscribe for, or the solicitation of an offer to buy, sell, issue or subscribe for any securities in any jurisdiction in which such offer, solicitation or sale would be
Slide 4: Exploring the past producing McCabe High-Grade Gold Mine and surrounding mines - The Eagle Project
Exploring the past producing McCabe High-Grade Gold Mine and surrounding mines - The Eagle Project Past Producing Gold, Sooner Shaft, 1982 High -grade Historical Silver Mine Resource with Significant 15' concrete lined production shaft sunk to Acquisition of 100% of the past -producing 1,450' Upside
Slide 5: McCabe Mine - Historic High-Grade Resource
McCabe Mine - Historic High-Grade Resource High -Grade Historic Resource McCabe Mine Historical Resources¹ Located on Patented Ground: Tonnage Ounces/Ton Total Ounces 1984 Total Estimate of: Gold Silver Gold Silver • 877,617 ounces gold at a grade of 11.7 g/t gold Total Historical 2,593,682 0.34 2.0
Slide 6: Eagle Project - Historic Mining District of Yavapai County
Eagle Project - Historic Mining District of Yavapai County Located in historic mining district of Yavapai County, Arizona 4,169 acres of BLM claims Eagle Project 420 acres of patented land (including water rights and wells) 1 100% ownership; 2% NSR with 1% buyback option for US$1M Mining -friendly j
Slide 7: Management and Key Advisors
Management and Key Advisors Kevin Reid MBA Ben Somps PhD Sung Ming (Eric) Myung CPA President & CEO VP Exploration Chief Financial Officer Mr . Re id h a s a BSc . Ho n o u rs in Ge o lo gic a l Sc ie n c e s fro m Mr. So m p s is a p ro fe s s io n a l ge o lo gis t wit h o ve r n in e Mr. Myu n g
Slide 8: Board of Directors
Board of Directors Marc Pais B.Sc Kevin Reid MBA Dawn Meidinger Mike Pilmer MBA Rickard Vernon MBA, B.Sc Chairman Director Director Director Director Mr . Pais is the co -founder, Director Mr . Reid has a BSc. Honours in Ms. Meidinger joined the law firm of Mr . Pilmer has more than 30 years of Mr .
Slide 9: Corporate Structure
Corporate Structure AZEM Share Structure Issued & Outstanding 56,858,105 Stock Options 2,686,764 Warrants 6,833,533 Fully Diluted 66,378,402 As of June 30, 2026 ARIZONA EAGLE MINING TSX.V: AZEM | OTCQB: AZEMF 9
Slide 10: The 830' Level, “Wall Rocks in Excellent Condition”
The 830' Level, “Wall Rocks in Excellent Condition” 1982: Sooner shaft sunk, replacement cost US$30 -40M 1983: inspection of the McCabe workings that dated back to 1937, when operations ceased. Fifty years later the wall rocks were reported in “excellent” condition The rock compentency bodes well fo
Slide 11: 15’ Concrete Lined Production Shaft
15’ Concrete Lined Production Shaft 1982: Sooner shaft sunk, replacement cost US$30 -40M In place, a 15' concrete lined shaft to 1,650', and 17,000' of underground workings Ability to access underground infrastructure enables significant cost savings compared to surface drilling ARIZONA EAGLE MINING
Slide 12: McCabe Cross Section, Past Production
McCabe Cross Section, Past Production 17,0 0 0 ' o f u n d e rgro u n d wo rkin gs , a p p ro xim a t e ly US$ 3M in a d d it io n a l in fra s t ru c t u re Th e Mc Ca b e a n d Gla d s t o n e s h a ft s we re u s e d in t h e e a rly 19 0 0 's Th e So o n e r s h a ft wa s s u n k in t h e e a rl
Slide 13: 1050' Level - Sampled over 650', Averaging 0.41 OPT Gold
1050' Level - Sampled over 650', Averaging 0.41 OPT Gold (Source: Stan West, 1983 Annual Report) “The diagram shows the entire plan view of the drifting on the 1050' level.” “Th e d rift o n t h e 1,0 50 ' le ve l e n c o u n t e re d s t ro n g, p e rs is t e n t m in e ra liza t io n o ve r it s e
Slide 14: McCabe Mine - 1050' Level
McCabe Mine - 1050' Level Grant Morin, miner, and Birl W. Worley, Vice -President of Operations, at the 1050 level of the McCabe Mine (BHP Annual Report 1996). ARIZONA EAGLE MINING TSX.V: AZEM | OTCQB: AZEMF 14
Slide 15: McCabe Mine - 1050' Level, Channel Sampling
McCabe Mine - 1050' Level, Channel Sampling “Richard Pape, mining geologist, is shown cutting a channel sample from the north face (N 664.8) on the 1050' level of the McCabe Mine.” Detailed channel sampling was completed by Stan West in 1983 returning: 0.41 opt (14.1 g/t) gold 2.6 opt (89 g/t) silve
Slide 16: McCabe Mine - 1050' Level, Sampling
McCabe Mine - 1050' Level, Sampling Detailed sampling was carried o u t e ve ry 6 -8 ' o ve r t h e e n t ire le n gt h o f t h e d rift Drift in g 6 ' x 7' Th e 10 50 ' re t u rn e d a n a ve ra ge gra d e o f 0 .4 1 o p t (14 .1 g/ t ) go ld , 2.6 o p t (8 9 g/ t ) s ilve r o ve r a 6 50 ' d rift
Slide 17: McCabe Mine - Adjacent and Parallel Structures
McCabe Mine - Adjacent and Parallel Structures McCabe -Gladstone Zone “This zone has a strike length of over 3000' and previously supported high grade gold and silver production down to the 1000' level.” Rebel -Little Kicker Zone “Th is zo n e is a d ja c e n t t o t h e Mc Ca b e -Gla d s t o n e a
Slide 18: Eagle Project - Drill Cost Savings Analysis
Eagle Project - Drill Cost Savings Analysis Drilling costs from surface are approximately US$100/foot Ta rge t in g t h e 8 50 '-1,4 0 0 ' le ve ls fro m s u rfa c e re q u ire s h u n d re d s o f a d d it io n a l d rillin g Fro m u n d e rgro u n d a s m a ll d rill (lo we r c o s t ) a n d d ra
Slide 19: Eagle Project - Exceptional Infrastructure
Eagle Project - Exceptional Infrastructure Power lines currently in place run to property boundary Budget for re -establishing old lines farther on to the project Near -term potential to re -establish infrastructure ARIZONA EAGLE MINING TSX.V: AZEM | OTCQB: AZEMF 19
Slide 20: Eagle Project - District Scale with Significant Upside
Eagle Project - District Scale with Signficant Upside Located in historic mining district of Yavapai County, Arizona ~4,169 acres of BLM claims and 420 acres of patented land with water rights 100% ownership; 2% NSR with 1% buyback option for US$1M McCabe Mine hosts a historic estimate of 877,617 ou
Slide 21: Gold and Silver Zones - Expansion Potential
Gold and Silver Zones - Expansion Potential 15,000' McCABE MINE 300' shaft depth 500' shaft 260' shaft depth depth Possible Extension of Historic McCabe Vein System Resource Estimate¹ 650 ft Eagle Gold Zone Eagle Silver Zone Historic Resource Estimate: 8 77,6 17 o u n c e s o f go ld a t a gra d e o
Slide 22: Eagle Project - Past Producing Mines
Eagle Project - Past Producing Mines ~4,169 acres of BLM claims and 420 acres of p a t e n t e d la n d wit h wa t e r righ t s 10 h is t o ric s h a ft s o n p riva t e gro u n d Pa ra lle l s t ru c t u re t o t h e Mc Ca b e Min e , t h e “Fre e m a n ” t o t h e n o rt h a n d t h e “Ad ve n t u
Slide 23: Eagle Silver Project
Eagle Silver Project Arizona Eagle has acquired three past - producing, high -grade siver mines: High -grade silver (500 g/t), lead (3%) and zinc (4%) mined from the 1870s to 1930s Historic shafts reach a maximum depth of 500' Only shallow oxides were mined historically, sulphides open for expansion
Slide 24: Eagle Silver - Silver Belt Mine
Eagle Silver - Silver Belt Mine Silver Belt is the oldest recorded mine in the Big Bug district, which hosts the McCabe and Iron King mines Discovered in 1870 Located on strike with the McCabe Mine, and between the Lookout and Arizona National silver mines No mining or exploration undertaken since t
Slide 25: Eagle Copper Zone - Unlocking High-Impact VTEM Targets
Eagle Copper Zone - Unlocking High-Impact VTEM Targets VTEM survey completed in February 2025 identified a la rge VMS-t yp e a n o m a ly b e n e a t h h igh -gra d e c o p p e r-go ld zo n e s EM t a rge t s p a n s 30 0 0 ' x 30 0 0 ', in d ic a t in g s t ro n g s c a le p o t e n t ia l Pla n n
Slide 26: Eagle Copper Zone - Untested “VMS” Potential
Eagle Copper Zone - Untested “VMS” Potenial Outcrop sampling completed in 2024 and 2025 on t h e s o u t h e a s t o f t h e Ea gle Pro je c t in t e rs e c t e d m u lt ip le c o p p e r- a n d s ilve r-ric h ve in s Mo re t h a n 6 0 0 0 ' o f s t rike le n gt h is u n t e s t e d wit h n o h is t
Slide 27: Key Upcoming Near-term Catalysts
Key Upcoming Near-term Catalysts Evaluating Accessing the Underground (Phase 1) via the Sooner Shaft Arizona Eagle is evaluating opportunities to access the underground through the rehabilitation of t h e So o n e r s h a ft Skytem Survey (August 2026) He lic o p t e r-b o rn e t im e -d o m a in e
Slide 28: Summary Highlights
Summary Highlights High Grade Resource, McCabe Mine hosts historic estimate of ~877,617 ounces of gold grading 11.7 g/t and 5,119.169 ounces of silver grading 69 g/t Past Producer McCabe Mine produced 60,000 gold with 17,000' of underground development during 1987 -88 leaving behind an estimated ~82
Slide 29: Contact Information
Contact Information Kevin Reid, MBA President and CEO kreid@arizonaeglemining.com www.arizonaeaglemining.com @AzEagleMining Arizona Eagle Mining Corp ARIZONA EAGLE MINING TSX.V: AZEM | OTCQB: AZEMF 29
Arizona Eagle Mining — Investor Presentation (September 2026) on 6ix