Agl Energy Limited · ASX:AGL

Agl Energy — Corporate Update (February 2023)

27 slides from Agl Energy's corporate update, Feb 23, 2023

  1. Slide 1: Newcastle Community Dialogue Group

    Newcastle Community Dialogue Group Thursday, 23 February 2023

  2. Slide 2: Acknowledgement of Traditional Owners

    Before we begin, I would like to acknowledge the Traditional Owners of the lands on which we meet today and pay my respects to their Elders past and present.

  3. Slide 3: Agenda

    Agenda Open and welcome, apologies, 1 declarations, previous minutes, business arising and 4 AGL Update correspondence 2 Land and Approvals Update 5 General business, next meeting and close 3 Newcastle Gas Storage Facility latest news

  4. Slide 4: Tomago Battery Energy Storage System Project

    Tomago Battery Energy Storage System Project Briefing CDG/AGL February 23, 2023

  5. Slide 5: Agenda

    Agenda 1 Introductions 4 Schedule 2 Project Overview 5 Discussion 3 Environmental Assessment Approach

  6. Slide 6: AGL - Renewables

    AGL - Renewables AGL is Australia's largest generator, and largest ASX listed renewables operator and developer: • 1,578 MW of wind • 155 MW of large-scale solar • 800 MW of hydropower • Building 300 MW of batteries now • 3.2 GW of projects in pipeline now Latest Review of Strategic Directions (ROSD

  7. Slide 7: Project Overview

    250MW Torrens Island Battery, SA Project Overview To construct, operate and maintain a battery energy storage system (BESS) at Tomago, NSW: • Construction and operation of a BESS of approximately 500 megawatts (MW) and up to 2,000 megawatt-hours (MWh) in capacity • Transmission line from the BESS la

  8. Slide 8: Project Location

    Project Location Land The site is at Tomago in a semi-rural/industrial area with industrial land uses located adjacent to and around the Site. Several industrial sites are immediately to the east, while rural properties are located to the south and east. BESS Site: 1940 Pacific Highway, Tomago (Lots

  9. Slide 9: The Battery Site

    The Battery Site • Area – total land is approximately 22 ha. BESS site is approximately 12 ha • LGA – Port Stephens Council • Zoning – IN1 (General Industrial) • Permissibility - permissible with consent within the IN1 General Industrial land use zone under the T&I SEPP • Design – will allow for kno

  10. Slide 10: Newcastle Power Station Site

    Newcastle Power Station Site • Project approved in March 2021 • Larger footprint • Site and constraints are well known • The Newcastle Power Station EIS • investigated the site in detail • widely consulted the community • received State planning approval with no objections CONFIDENTIAL | CDG Tomago

  11. Slide 11: NSW Environmental Assessment for BESS

    NSW Environmental Assessment for BESS Key and other environmental issues The EIS will detail any anticipated potential environmental impacts of a development on the environment, as well as proposing avoidance, mitigation and management. Key Matters Other Items Aboriginal heritage assessment – Severa

  12. Slide 12: Aboriginal Heritage

    Aboriginal Heritage (Sourced from Newcastle Power Station EIS – Nov 2019) CONFIDENTIAL | CDG Tomago BESS Project | February 2023 12

  13. Slide 13: Matters of National Environmental Significance

    Matters of National Environmental Significance MNES MNEs within 10 km of the Project World Heritage Properties None National Heritage Place None Wetlands of International Importance 1 Great Barrier Reef Marine Park None Commonwealth Marine Area None Listed Threatened Ecological 7 Communities Listed

  14. Slide 14: Threatened species and likelihood – Moderate or greater

    Threatened species and likelihood – Moderate or greater Scientific name Common name Conservation status Likelihood of occurrence Grevillea parviflora Small-flower grevillea Vulnerable Recorded subsp. parviflora Phascolarctos Koala Endangered Moderate cinereus • Site contains scattered, non-preferred

  15. Slide 15: Community and Stakeholder Engagement

    Community and Stakeholder Engagement AGL will engage with key stakeholders during the preparation of the Environmental Impact Assessment (EIS) and beyond • Relevant NSW and Federal Ministers • CASA • Transport for NSW • Department of Climate Change, Energy, State & Federal Government • DPE Environme

  16. Slide 16: Schedule

    Schedule Scoping Determination Complete Report/ EPBC Submit EIS Mobilise to site sought Construction Lodge August 23 Q2 2026 Feb 24 Q2 2028 Feb 23 CONFIDENTIAL | CDG Tomago BESS Project | February 2023 16

  17. Slide 17: For discussion

    For discussion 1. Planning pathway • AGL intends to lodge a State Significant Development application • Existing SSI-9837 approval (15/3/21) Newcastle Power Station 2. General engagement over coming months 3. Anything else? CONFIDENTIAL | CDG Tomago BESS Project | February 2023 17

  18. Slide 18: Questions

    Questions

  19. Slide 19: Newcastle Gas Storage Facility

    Newcastle Gas Storage Facility Latest News

  20. Slide 20: Newcastle Gas Storage Facility – General

    Newcastle Gas Storage Facility – General • No major incident, MTIs or LTIs • A break-in on Christmas eve. Perpetrators arrested the next day • Major maintenance activities completed as planned • Injection commenced late November 2022 • Injection is on hold for now due to low incoming pressure from J

  21. Slide 21: Newcastle Gas Storage Facility – Community

    Newcastle Gas Storage Facility – Community Local Community Investment Program – Round 1 FY23 Hunter Region Botanic Gardens - $5000 contribution to growing the Palm Gardens A renewed garden will allow the many visitors to the gardens enjoy a tranquil walk-through landscaped palm gardens with the oppo

  22. Slide 22: AGL Update

    AGL Update

  23. Slide 23: 2023 Half Year Result in line with expectations

    2023 Half Year Result in line with expectations 1.7* $(1,075)m $87m 65.2% +12 Total Injury Statutory Profit Underlying Net Profit Commercial Record high Net Frequency Rate after tax after tax Availability Promoter Score Reflects a disciplined and Including $(706)m of Down 55% on H122 Down 8.5 percen

  24. Slide 24: AGL is leading Australia’s energy transition

    AGL is leading Australia’s energy transition Connecting our customers Transitioning our nergy to a sustainable future energy portfolio the e tra ng ns di itio Lea n fo ns 4.3 million services provided nationally - Ambition to add up to 12 GW of new ra helping our customers decarbonise the way they l

  25. Slide 25: AGL is making strong progress on delivering on its strategy

    AGL is making strong progress on delivering on its strategy TODAY NEAR TERM FOCUS Connecting our customers • Growth in customer services and record • Accelerate growth of decentralised assets to a sustainable future high NPS under orchestration and electrification, underpinned by new technology • 19

  26. Slide 26: General business, next meeting and close

    General business, next meeting and close

  27. Slide 27: Contact

    Contact Jo Ferguson Community Relations Coordinator AGLCommunity@agl.com.au