Macro Metals Limited · ASX:M4M
Macro Metals — Kogi Iron — Mining Indaba 2013
22 slides from Macro Metals's conference presentation, February 2013

Slide 1: Mining Indaba Presentation ASX announcement
1 February 2013 Company Announcements ASX Limited Level 8, Exchange Plaza PERTH WA 6000 MINING INDABA PRESENTATION Kogi Iron Limited (ASX: KFE) advises that Non-Executive Chairman, Dr Ian Burston is attending Mining Indaba in Cape Town, South Africa between 4-7 February 2013, and with other Company

Slide 2: Exploring a Potential World-class Iron Ore Project in Nigeria
www.kogiiron.com | ASX: KFE Exploring a Potential World-class Iron Ore Project in Nigeria Mining Indaba – February 2013

Slide 3: Forward-looking Statements
Forward-looking Statements This presentation contains forward-looking statements which are identified by words such as ‘may’, ‘could’, ‘believes’, ‘estimates’, ‘targets, ‘expects’, or ‘intends’ and other similar words that involve risks and uncertainties. These statements are based on an assessment

Slide 4: Kogi Iron corporate snapshot
Kogi Iron represents a unique iron ore investment opportunity with large resource potential, proximity to infrastructure and potentially significant project scale Corporate Snapshot Projects (Nigeria, West Africa) Ownership ASX Code KFE Agbaja Iron Ore Project (196km2) 100% Shares on Issue 285.2m Ad

Slide 5: Board of Directors
Dr Ian Burston (Non-Executive Chairman) AM, DSc, FIEA, FIMM, FAICD Dr Burston has more than 50 years of experience in Western Australian and international iron ore mining and export sales. He has held executive management and Board positions with some of Australia’s largest and most successful minin

Slide 6: Nigeria overview and mining regime
• Federal constitutional republic comprising 36 states and Federal Capital Territory, Abuja. • Former British colony with a population of more than 163 million, which gained independence in 1960. • President elected by popular vote for a four year term – last election held in April 2011, next in Apr

Slide 7: Agbaja Project snapshot
Snapshot Location • Kogi State, Central Nigeria • Approx. 200km by sealed road south east of the capital city, Abuja Mineralisation • Shallow channel iron deposit (CID) overlain by laterite • Laterite: averages 35% Fe and 6m thick • CID Oolite: averages 46% Fe and 13m thick • Beneficiation required

Slide 8: www.kogiiron.com | ASX: KFE
www.kogiiron.com | ASX: KFE 7

Slide 9: www.kogiiron.com | ASX: KFE
www.kogiiron.com | ASX: KFE 8

Slide 10: Exploration licences and land package
15 granted Exploration Licences (EL) and one EL application for a land package of 400km2. Eight ELs and one application in three project areas prospective for CIDs in Cretaceous rocks. Current focus on EL12124 (178km2) at Agbaja Project with prospective CID plateau area of 80km2. Exploration target

Slide 11: Drilling on EL12124
• Current focus on EL12124 only. • Drilling on EL12124 commenced in October 2011 within the Stage 1 Resource Area. • Stage 1 Resource Area ≈15km2 of total Agbaja CID plateau area of approximately 80km2 (18% of prospective area). • 681 RC and 11 Diamond holes drilled1 (total 16,935m) on 200 x 100m pa

Slide 12: Iron mineralisation hosted in Cretaceous CID
• Iron mineralisation hosted in Cretaceous CID overlain by laterite. • Shallow, flat-lying sedimentary sequence. • Laterite: • comprises ferruginous interbedded sandstone and oolite beds. • Average thickness 6m (range 2-12m). • CID: • comprises iron-bearing nodules termed ooids (1-2mm) and pisoids (

Slide 13: Maiden Inferred Mineral Resource of 488Mt at 43% Fe
• Maiden Inferred Mineral Resource of 488Mt at 43% Fe announced September 2012. • Resource comprises approximately 90% of Stage 1 area. • CID is laterally extensive and continuous, being drill defined over an area >5 x 4km. www.kogiiron.com | ASX: KFE 12

Slide 14: 2013 resource and exploration programs
• 2013 resource program aimed to complete drill-out of Stage 1 Resource Area and upgrade Inferred resource to Indicated category: – Head assay of 11 diamond holes and comparison to adjacent RC holes, and collection of additional density measurements, and – Complete remaining Stage 1 resource definit

Slide 15: Metallurgical test work
• 11 PQ (85mm diameter) diamond holes from the Stage 1 resource drilling program shipped to ALS Metallurgy, Perth to prepare four representative run-of-mine samples (two each of Laterite Ironstone Laterite Ironstone Laterite and Oolitic Ironstone) for metallurgical test work. • First phase metallurg

Slide 16: Proximate to existing infrastructure with latent capacity
Proximate to existing infrastructure with latent capacity Major highway entering Lokoja from Abuja • Government owned, existing, operational heavy haul railway within 68km of Agbaja Project. • Government owned and currently on care & maintenance, Itakpe iron ore beneficiation plant located within 50

Slide 17: www.kogiiron.com | ASX: KFE
www.kogiiron.com | ASX: KFE 16

Slide 18: 2013 work program and milestones
• Maiden JORC Resource = Released September 2012 • Met/Beneficiation Test Work = Underway – continues throughout 2013 • Environmental & Social Baselines = Underway – continues throughout 2013 • Iron Ore Marketing Studies = Underway – continues throughout 2013 • Preliminary Mining Study = Commence Q1

Slide 19: Community and government support
• Strong support by the Massi of Agbaja, HRH Abubakar Isa Alugbere, and within the 11 local Agbaja communities. • Commitment to local content: – Exclusive recruitment of workers from the Agbaja communities; and – Local procurement of goods and services. H.M.Massi of Agbaja KCM Mining Personnel www.k

Slide 20: Kogi Iron peer share price performance
Kogi Iron peer share price performance (rebased to 100)¹ Out performed peers since relisting ¹All share prices have been indexed from 15 March 2012 to closing price as at 29 January 2013 www.kogiiron.com | ASX: KFE 19

Slide 21: Investment highlights
• Maiden Inferred JORC Resource: 488 million tonnes at an in situ iron grade of 42.7%. One of the highest grade beneficiable iron ore resources in West Africa. • Significant Resource Potential & Project Scale: Large landholding, large Exploration Target, with maiden JORC resource representing only 1

Slide 22: For further information contact
For further information contact: Ian Burston Shane Volk Chairman Company Secretary + 61 8 9200 3456 + 61 8 9200 3456 13 Colin Street West Perth, Western Australia 6005 Telephone: + 61 8 9200 3456 Facsimile: + 61 8 9200 3455 www.kogiiron.com www.kogiiron.com | ASX: KFE 21
Source: Internet Archive copy of kogiiron.com
More decks from Macro Metals Limited
Shareholder Meeting (November 2026)28 slides · Nov 20, 2026
Investor Presentation (October 2026)13 slides · Oct 13, 2026
Shareholder Meeting (November 2025)13 slides · Nov 27, 2025
Investor Presentation (February 2025)17 slides · Feb 12, 2025
Non-Deal Roadshow (December 2024)26 slides · Dec 2, 2024
Shareholder Meeting (November 2024)30 slides · Nov 26, 2024