Perseus Mining Limited · ASX:PRU

Perseus Mining — Technical Presentation (November 2018)

91 slides from Perseus Mining's technical presentation, Nov 15, 2018

  1. Slide 1: Edikan Gold Mine Investor Site Visit Presentation

    For personal use only EDIKAN GOLD MINE INVESTOR SITE VISIT PRESENTATION NOVEMBER 2018

  2. Slide 2: Disclaimer

    Disclaimer For personal use only Disclaimer No representation or warranty, express or implied, is made by Perseus that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, each of Perseus, its directors, officer

  3. Slide 3: Overview

    For personal use only OVERVIEW

  4. Slide 4: Edikan Senior Management Team

    Edikan Senior Management Team For personal use only • Management team a blend of expatriate and local managers • Most of the managers have additional international exposure in terms of career • Managers are focused and goal oriented • Resilient management team 4

  5. Slide 5: Regional Map

    Regional Map For personal use only Sissingué 5

  6. Slide 6: Edikan - Overview

    Edikan - Overview For personal use only • Two mining leases – Ayanfuri & Nanankaw Mining leases covering 93.13 km2 • Initially owned by Cluff and Ashanti Goldfields (now AngloGold Ashanti) • Perseus acquired in May 2006 and mining leases granted in January 2010 • Commenced mining operations in Febru

  7. Slide 7: Mining Lease

    For personal use only Mining Lease 7

  8. Slide 8: Infrastructure Layout

    Infrastructure Layout For personal use only 8

  9. Slide 9: Occupational Health and Safety

    For personal use only OCUPATIONAL HEALTH and SAFETY OHS

  10. Slide 10: Key OHS Trends

    For personal use only Key OHS Trends 10

  11. Slide 11: OHS Activities

    OHS Activities For personal use only Level 3 Awarded 2017 Emergency Best Mine Drill Based Health, Safety and Environmental Audit Zone 2 First Aid and Safety Safety Refresher Competition Training PMGL Team placed First 11

  12. Slide 12: OHS Leading Actions – Continuous Improvements

    OHS Leading Actions – Continuous Improvements For personal use only • Leading Indicators / Actions – (Preventive) – Inspections – Hazard Identification, Reporting and Correction – Audit and Systems Reviews and Controls – Planned Task Observations and Corrections – Employee Safety Training / Communic

  13. Slide 13: Our Safety Journey!

    Our Safety Journey! For personal use only 13

  14. Slide 14: Mining Operations

    For personal use only MINING OPERATIONS

  15. Slide 15: Mining Equipment / Contractors

    Mining Equipment / Contractors For personal use only • Two (2) Mining contractors on site AMS and Rocksure -moving to one Rocksure won tender • African Mining Services (AMS): Working in ESN, Fetish, & Chirawewa, and responsible for D&B, L&H, GC drilling, Crusher Feed and Dewatering Production Fleet

  16. Slide 16: FY 2019 Q1 Production and Cost Summary

    FY 2019 Q1 Production and Cost Summary For personal use only Q1_ SUMMARY KPI Units Q1_ Actual Q1_ Budget Variance Ore Tonnes Mined Mt 2.34 2.26 0.08 Ore Grade g/t 1.09 1.12 0.21 Waste Tonnes Mined Mt 5.43 6.7 (1.24) Total Tonnes Mined Mt 7.77 8.9 (1.16) Strip Ratio t:t 2.32 2.95 (15.80) COST SUMMARY

  17. Slide 17: Challenges and Remedial Actions

    Challenges and Remedial Actions For personal use only Issue Remedial Action Responsible Person Getting GC Drilling ahead of Mining a. Sequence mining operations to allow adequate time a. Mining Manager/Technical for GC and ensuring operations comply with mining Services Manager (TSM) 1. Grounds not

  18. Slide 18: Mining Strategy going forward

    Mining Strategy going forward For personal use only • Previous LOM was optimised on ounces • Current LOM optimised on Cash flow • Reduced mining volumes to reduce mining cost • Supplement mill feed with ore from stockpile • To mine and feed ore from hanging wall to footwall to reduce preferential tr

  19. Slide 19: Mine to Mill Reconciliation

    For personal use only MINE to MILL RECONCILIATION

  20. Slide 20: Reconciliation Overview

    Reconciliation Overview For personal use only • Covers period Jul-18 to Sept-18 • Compare MIK model with GC model • Compare GC Model with Truck Count • Compare GC Mill Feed with Truck Count & Δ Stockpile • Compared Mill to GC Mill Feed • Reconcile Mill back to MIK model 20

  21. Slide 21: FY2019 Q1 Reconciliation Conclusions

    FY2019 Q1 Reconciliation Conclusions For personal use only Month Unit MIK GC Truck Count Mill + Δ S/Pile Tonnes Ore t 2,096,921 2,237,522 2,446,597 2,339,585 Grade g/t 1.17 1.11 1.07 1.06 Contained Gold oz 78,575 79,736 84,554 79,510 F Factors Parameter F1 F2 F3 F4 F1*F2*F3*F4 Tonnes Ore 1.07 1.09 0

  22. Slide 22: F1 Grade Control Model to MIK model

    F1 Grade Control Model to MIK model For personal use only 2019 QTR1 • Tonnes mined – +3% +12% by month – +7% for 2019 QTR1 • Grade – -8% + 1% by month – -5% for 2019 QTR1 • Contained gold – -6% +7% by month – +1% for 2019 QTR1 • 2019 QTR1: consistently more tonnes at lower grade for same metal 22

  23. Slide 23: F2 Truck Count to Grade Control Model

    F2 Truck Count to Grade Control Model For personal use only 2019 QTR1 • Tonnes mined – +8% +11% by month – +9% for 2019 QTR1 • Grade – -4% -3% by month – -3% for 2019 QTR1 • Contained gold – +5% +8% by month – +6% for 2019 QTR1 • 2019 QTR1: consistently more tonnes at lower grade for more metal 23

  24. Slide 24: F3 GC to Mill to Truck Count & ΔS/Pile

    F3 GC to Mill to Truck Count & ΔS/Pile For personal use only • Tonnes fed 2019 QTR1 – -6% -1% by month – -4% for 2019 QTR1 • Grade – +1% + 3% by month – +2% for 2019 QTR1 • Contained gold – -4% +1% by month – -2% for 2019 QTR1 • 2019 QTR1: Consistently less tonnes at higher grade for less metal 24

  25. Slide 25: F4 Mill to GC to Mill

    F4 Mill to GC to Mill For personal use only • Tonnes milled 2019 QTR1 – -6% +2% by month – -2% for 2019 QTR1 • Grade – -6% - 2% by month – -3% for 2019 QTR1 • Contained gold – -7% -4% by month – -5% for 2019 QTR1 • 2019 QTR1: Consistently less tonnes at lower grade for less metal 25

  26. Slide 26: MIK Model to Mill (F1 x F2 x F3 x F4)

    MIK Model to Mill (F1 x F2 x F3 x F4) For personal use only 2019 QTR1 • Tonnes Ore – +8% +16% by month – +10% for 2019 QTR1 • Grade – -14% - 4% by month – -9% for 2019 QTR1 • Contained gold – -7% +6% by month – 0% for 2019 QTR1 • 2019 QTR1: Consistently more tonnes at lower grade for same metal 26

  27. Slide 27: Continuous Improvement and Future Strategies

    Continuous Improvement and Future Strategies For personal use only • Mining Factors: continue with the visual control, monitoring of all ore polygons staked out in the pit and control on digging ore blocks • Blast Monitoring: This will continue in all pits. Mining flitch heights will be adjusted to

  28. Slide 28: Processing and Maintenance

    For personal use only PROCESSING and MAINTENANCE

  29. Slide 29: Edikan Process Plant

    Edikan Process Plant For personal use only 29

  30. Slide 30: Edikan Flowsheet

    For personal use only Edikan Flowsheet 30

  31. Slide 31: Edikan Flowsheet

    Edikan Flowsheet For personal use only • Simple and robust flow sheet • Single stage primary crushing to crushed ore stockpile. • Dual drive 14MW SAG Mill with pebble crusher circuit • Gravity circuit – centrifugal concentrators and intensive leach of concentrate (up to ~25% of recovered gold) • Sul

  32. Slide 32: FY 2019 Q1 Production Summary

    FY 2019 Q1 Production Summary For personal use only March 2018 Calendar Year to Parameter Unit June 2018 Quarter Sept 2018 Quarter Quarter 30 Sept 2018 Gold Production & Sales Total material mined: tonnes 9,911,975 9,569,667 7,771,173 27,252,815 Total ore mined tonnes 2,810,297 2,720,364 2,339,586 7

  33. Slide 33: Plant Availabilities FY2019 Q1

    Plant Availabilities FY2019 Q1 For personal use only 100 90 100 92 91 95 93 90 84 84 86 SAG Mill 90 CRUSHER 80 80 70 70 60 60 50 50 8 86% 93% 40 40 30 30 20 20 Actual Actual 10 10 Budget Budget 0 0 FYTD July Aug Sept 100 94 93 93 93 95 94 95 95 OXIDE Feeder 90 REGRIND Mill 100 90 80 80 70 70 60 60 5

  34. Slide 34: FY 2019 Q1 Cost Summary

    FY 2019 Q1 Cost Summary For personal use only • Unit costs in $/t was 3.8% below budget • Unit costs in $/oz was 5.2% below budget • Miscellanence was over budget mainly due to crane hire as a result of delayed crane transport from the Sissingue’ mine site 34

  35. Slide 35: Tailing Storage Facility Update

    Tailing Storage Facility Update For personal use only ONGOING ACTIVITIES FUTURE ACTIVITIES • Deposition at the Southern TSF; to - Southern TSF raise to 206mRL continue until January 2019 - Continue 208mRL raise of NTSF • Raise of NTSF embankments to - Strategic Plan 203mRL; Provide sufficient TSF ca

  36. Slide 36: Performance Improvements

    Performance Improvements For personal use only • Business Improvement initiatives in place • Plant upgrade project of USD 10 million was successfully completed in October 2016 and positive outcomes realised • Cost saving measures continuing in plant 36

  37. Slide 37: Risks Review

    Risks Review For personal use only RISK REMEDIAL ACTION LPF Availability Min 80Kt on COS Metal/Wood planks Metal detector/Belt attendants CIL Low Rec Use 25mm steelballs to crack gold locked in fines Flotation Tailings line blockage Cyclone roping detector Screen 6 Panel failure Use Eurogomma/Metso

  38. Slide 38: Commissioned Onsite Laboratory

    Commissioned Onsite Laboratory in Nov19 For personal use only FUTURE FOCUS • Analysis of Plant and Grade Control Solid Samples • Perform analysis on Carbon, Bullion and Other Analysis • Security Installations • FIRE PERMIT: Granted Verbal Approval • Final Mincom Inspection And Permit: Granted Verbal

  39. Slide 39: Continuous Improvement

    Continuous Improvement For personal use only 1. Gold Room Crucible • Changed from DA200 crucible to A200 spouted crucible • Savings of ~$10/smelt ($51/smelt for DA200 against $41/smelt A200). • Increase furnace brick liner life • Reduction in spillages 2. Metal Detector for CV10 • Installed to pick

  40. Slide 40: Continuous Improvement Continued

    Continuous Improvement Continued For personal use only 5. Crusher Liners • Exploiting local manufacturing of Crusher concaves in the quest to reduce costs. • New Crusher concave liner design to reduce gap to 105mm (On site to be installed in November). 6. CIL Rec./Regrind Mill Steel balls (25mm) • A

  41. Slide 41: Continuous Improvement Continued

    Continuous Improvement Continued For personal use only 7. COS Cost Management (Crush to Mill Philosophy -2017FY/ ~80kt 2018FY) • Saved 38% in 2017FY and 57% in 2018FYTD (LPF availability can impact negatively on COS cost management) 8. Gravity Recovery study • A small table scale concentrator will b

  42. Slide 42: Capital and Continuous Improvement Activities

    Capital and Continuous Improvement Activities For personal use only • FTSF PUMPS AND PIPE UPGRADE – Engineering and procurement in progress. Installation and commissioning scheduled for Q3 and Q4 of FY2018/19. • FLOTATION AND CIL AUTO SAMPLERS – Samplers shipped, installation scheduled for 21 Novemb

  43. Slide 43: Major Activities Planned for Q2 - Q4

    Major Activities Planned for Q2 - Q4 For personal use only • LOW PROFILE FEEDER – Replace conveyor complete with belt, chains and slats in November 2018 • PROCESS WATER POND – De-sludge the process water pond starting in January to April 2019 • EVENT POND – Construction begins in November 2018 43

  44. Slide 44: Commercial

    For personal use only COMMERCIAL

  45. Slide 45: Quarterly Production Trend

    Quarterly Production Trend For personal use only • Stable Production - Q1 production 6% lower than Q4 at 54,595oz versus Q4 57,861oz, but 6% higher than Q1 last year. • Marginally lower throughput and grade compared to last quarter. 45

  46. Slide 46: Quarterly Cost US$/oz Trend

    Quarterly Cost US$/oz Trend For personal use only • Q1 AISC 4% lower at $1,045/oz versus Q4 $1,090/oz and 6% lower than Q1 last year. • Steady performance through cost improvement initiatives 46

  47. Slide 47: Quarterly Mining Costs

    Quarterly Mining Costs For personal use only • Unit mining costs increased 10% from $3.56/t (Q4) to $3.91/t reflecting impact of mining at lower elevations and impact of fixed cost on lower material movement (9.6MT to 7.8MT) 47

  48. Slide 48: Quarterly Processing Unit Costs Trend

    Quarterly Processing Unit Costs Trend For personal use only • Q1 unit processing costs increased slightly to $8.98/t from $8.94/t in Q4, and 15% lower than Q1 last year • Lower power costs (versus last year) and reduced contractor costs contributed to lower unit cost 48

  49. Slide 49: Quarterly G&A Costs

    Quarterly G&A Costs For personal use only • G&A costs were slightly lower quarter-on-quarter at $4.8M • Average monthly Q1 G&A costs were at $1.62M compared to Q4 $1.73M 49

  50. Slide 50: Power and Fuel

    Power and Fuel For personal use only VRA power cost trending down 50

  51. Slide 51: Capital Spend (US$M)

    Capital Spend (US$M) For personal use only 51

  52. Slide 52: Human Resources and Industrial Relations

    For personal use only HUMAN RESOURCES and INDUSTRIAL RELATIONS

  53. Slide 53: HR Overview

    HR Overview For personal use only • 2022 personnel working onsite for the quarter ending September • 452 PMGL personnel (including 5 expatriates) • 1,570 Mining and other contractors • 40.5% of personnel are from the local communities in conformance to legal localization requirements • PMGL employee

  54. Slide 54: Environmental

    For personal use only ENVIRONMENTAL

  55. Slide 55: Environmental Overview

    Environmental Overview For personal use only • EIS/EMP/L.I 2182 – stipulates closure Rehabilitated Waste dump criteria including progressive rehabilitation • EPA required a reclamation bond for site closure/rehabilitation of est. $8m (recoverable) • Monthly site monitoring including water (surface a

  56. Slide 56: Security

    For personal use only SECURITY

  57. Slide 57: Security Overview

    Security Overview For personal use only • Security Management consists of experienced ex-military and ex-police officers with extensive industrial security knowledge • Current onsite security is provided by a contracted Private Security Company with experienced personnel managed by the PMGL Security

  58. Slide 58: Social Development

    For personal use only SOCIAL DEVELOPMENT

  59. Slide 59: Social Development

    Social Development For personal use only • Five main catchment communities surrounding Edikan – Ayanfuri, Gyaman, Fobinso, Abenabena and Nkonya • Regular communication with communities and other stakeholders, both formal and informal • Formal consultation groups including Crop Negotiation Committee

  60. Slide 60: Consolidating Social Development

    Consolidating Social Development For personal use only 60

  61. Slide 61: FY 2019 Q1 Highlights

    FY 2019 Q1 Highlights For personal use only • Commissioned and handed over Abenabena Health Centre to the Municipal Health Directorate. • Handed over Nkonya ICT Centre jointly funded by PMGL through Edikan Trust Fund and America Peace Corps. • Surveyed building condition status of all structures at

  62. Slide 62: FY 2019 Q1 Highlights – Cont'd

    FY 2019 Q1 Highlights – Cont’d For personal use only • Third quarter Edikan Board meeting organised. A total of 4 project proposals were approved, including requests from Exploration communities. • Inaugurated new Community Consultative Committee. • Twenty (20) engagement meetings and consultations

  63. Slide 63: FY 2019 Q1 Challenges

    FY 2019 Q1 Challenges For personal use only Challenges Remedy / Action Illegal mining activities on PMGL’s External stakeholders (Paramount chief, District concessions pose a lot of threat. Chief Executive, opinion leaders) etc. are being consulted for resolution. Community Impediment to Exploration

  64. Slide 64: Outlook for FY 2019 Q2

    Outlook for FY 2019 Q2 For personal use only • Publication (video documentary and quarterly newsletter) of PMGL’s Corporate Social Responsibility programmes to strategically brand the Company. • Organise friendly football match with the catchment communities to strengthen relationship. • Intensify c

  65. Slide 65: Land Relocation Action Plan (LARP)

    For personal use only LAND RELOCATION ACTION PLAN LARP

  66. Slide 66: Resettlement - Ayanfuri

    Resettlement - Ayanfuri For personal use only 66

  67. Slide 67: Resettlement - Ayanfuri

    Resettlement - Ayanfuri For personal use only 67

  68. Slide 68: Resettlement - Ayanfuri

    Resettlement - Ayanfuri For personal use only Completed Phase 1 Street Scene 68

  69. Slide 69: Esuajah South Resettlement

    Esuajah South Resettlement For personal use only • Construction of first 9 building commenced on 3rd September 2018 with scheduled completion date of 31st March 2019. • Four (4) local contractors with 74 workmen are working on the first 9 buildings. • Materials have been purchased for project execut

  70. Slide 70: Edikan Gold Mine Life of Mine Plan

    For personal use only EDIKAN GOLD MINE LIFE OF MINE PLAN Source: “Perseus Mining Updates Edikan’s Life of Mine Plan” dated 29 August 2018

  71. Slide 71: Overview

    Overview For personal use only Solid Edikan Life of Mine which is:  Economically very attractive – US$950/oz all-in site cost and US$264M after tax cashflow  Technically robust – Operating and processing experience in all pits (except Bokitsi), resource/mill reconciliation performance well underst

  72. Slide 72: Summary of Changes Since Previous LOM

    Summary of Changes Since Previous LOM For personal use only • Increase in mining contract cost – rise & fall • Additional ore mining costs – grade control & rehandle • Labour cost increase in all areas • Lower throughput rates – fixed costs higher per tonne • Mill run time increased – fixed costs lo

  73. Slide 73: Main LOM Assumptions

    Main LOM Assumptions For personal use only • Scheduled from 1 July 2018 • Gold price US$1,200/ounce • Diesel price US$1.01/L • Power 99% grid ($0.147/kWh), 1% self generated ($0.273/kWh) • AMS mining cost for Eastern and Northern Pits • Rocksure mining costs for Fobinso and AG Final pits • Mill Run

  74. Slide 74: Snapshot of Outcomes

    Snapshot of Outcomes For personal use only Parameter Units Value • 6 Year Mine Life Waste + Ore Mined Mt 116.2 • LOM Ounce Production 180 Ore processed Mt 39.2 Head Grade g/t 0.98 koz/yr with 200 koz/yr in first Weighted Average Recovery % 87.5% 3ars Sustaining Capital US$M 31.9 • All in site cost U

  75. Slide 75: Edikan Resource Estimates

    Edikan Resource Estimates For personal use only • All Open Pit Resource Estimates Regularly Updated – Generally MIK Estimation Method • Heap Leach and ROM Stockpiles Included • Good reconciliation between reserve model and grade control over the last 2 years 75

  76. Slide 76: Edikan Resource Estimate (Jun 2018)

    Edikan Resource Estimate (Jun 2018) 7, 8, 9 For personal use only Measured Resources Indicated Resources Measured + Indicated Deposit Deposit Quantity Grade Gold Quantity Grade Gold Quantity Grade Gold Type Mt g/t Au koz Mt g/t Au koz Mt g/t Au koz AF Gap1, 2, 3 Open Pit 7.8 1.00 253 11.1 0.95 338 1

  77. Slide 77: Edikan Reserve Estimate (Jun 2018)

    Edikan Reserve Estimate (Jun 2018) 3, 6, 7 For personal use only Proved Probable Proved + Probable Deposit Deposit Quantity Grade Gold Quantity Grade Gold Quantity Grade Gold Type Mt g/t Au koz Mt g/t Au koz Mt g/t Au koz AF Gap¹,⁴ Open Pit 4.3 1.09 150 4.7 1.11 169 9.0 1.10 319 Fobinso¹ ⁴, Open Pit

  78. Slide 78: Edikan LOM Ore Sources

    Edikan LOM Ore Sources For personal use only 78

  79. Slide 79: Total Material Movement by Ore Source

    Total Material Movement by Ore Source For personal use only 1,400 Thousands BCM 1,200 1,000 800 600 400 200 - 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 FY18-19 FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FOB_FINAL AFG_FINAL ESN_FINAL FET_STG2 FET_FI

  80. Slide 80: Tonnes and Grade Processed

    Tonnes and Grade Processed For personal use only 8,000 1.20 1.06 1.08 Thousands tonnes 1.00 1.00 7,000 0.92 1.00 6,000 0.79 0.80 5,000 0.60 4,000 6,974,166 6,857,530 6,950,230 6,657,704 6,302,455 5,490,606 0.40 3,000 2,000 0.20 1,000 - FY18-19 FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 Tonnes Grade 80

  81. Slide 81: Ounce Production by Ore Source

    Ounce Production by Ore Source For personal use only 220 Thousands oz 200 180 160 140 120 100 80 60 40 20 - FY18-19 FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FOB_FINAL AFG_FINAL ESN_FINAL FET_STG2 FET_FINAL BKS_STG1 Existing Stockpile Heap Leach 81

  82. Slide 82: Edikan Exploration Update

    For personal use only EDIKAN EXPLORATION UPDATE

  83. Slide 83: Perseus Property Locations – SW Ghana

    Perseus Property Locations – SW Ghana For personal use only • Geological setting - south eastern part of the West African Craton. • Total Gold Endowment: o Ashanti Belt (≥ 125Moz Au) o Sefwi – Bibiani Belt (≥ 30Moz Au) o Kumasi Basin – (13Moz Au) 83

  84. Slide 84: District Geology & Gold Mineralisation

    District Geology & Gold Mineralisation For personal use only District Geology • Underlain principally by steeply dipping, Esuajah N & S NE-trending metasedimentary rocks and AB & Fobinso Fetish lesser metavolcanic rocks of the Chirawewa Paleoproterozoic Birimian Supergroup • D2 NE-SW thrust fault –

  85. Slide 85: Exploration Strategy

    Exploration Strategy For personal use only • Previous conventional use of soil geochemistry in defining drill targets has outlived its usefulness in this mature exploration environment, and is not effective in delineating blind deposits. • Recognition of need to use multi-geoscience data in an integ

  86. Slide 86: 2017-18 Target Testing

    2017-18 Target Testing For personal use only Esuajah NE Target Esuajah Gap South Esuajah South Poku South Nkonya West Saa NE Target Huntado Target 86

  87. Slide 87: Esuajah Gap – CGSG Target

    Esuajah Gap – CGSG Target 1 For personal use only • Conceptual buried én-echelon granite plug(s) between Esuajah Nth and Sth granites – undrilled due to Ayanfuri town site • Soil sampling also not conducted within residential area. • Alluvial workings in drainage from target zone • Two RC holes of 1

  88. Slide 88: Esuajah Gap Diamond Drilling

    Esuajah Gap Diamond Drilling For personal use only EGRDD001 Esuajah Nth Granite EGRDD002 EGDD001 EG holes – previous quarters EGDD004 EG holes – completed September quarter EG holes – completed post-quarter-end Esuajah EGDD006 Sth EGDD003 Granite EGDD005 Esuajah Gap Granite VTEM Ch8 Resistivity back

  89. Slide 89: Esuajah Gap Cross Section – Looking NE

    Esuajah Gap Cross Section – Looking NE For personal use only • Granite appears not to daylight – blind deposit with mineralisation preserved in granite apex and heavily altered and quartz veined ‘bleed out’ zone within sediments above. • Strongly altered – pervasive 1-4% disseminated pyrite + quartz

  90. Slide 90: Esuajah Gap – EGDD001 Intersection

    Esuajah Gap – EGDD001 Intersection For personal use only Apy Apy Py 90

  91. Slide 91: Edikan Exploration – Summary

    Edikan Exploration – Summary For personal use only • Edikan is a mature exploration environment. • Until 2016 exploration largely driven by soil geochemistry with considerable success but diminishing returns over time. • Current program driven by CGSG targeting exercise, with focus on a new generati

Perseus Mining — Technical Presentation (November 2018) on 6ix