Ashley Gold Corp. · CSE:ASHL

Ashley Gold — Investor Presentation (September 2023)

16 slides from Ashley Gold's investor presentation, September 2023

  1. Slide 1: Corporate Presentation Q3 2023

    Q 3 - 2023 CREATING LONG-TERM SHAREHOLDER VALUE THROUGH FOCUSED EXPLORATION, DISCOVERY, AND ACQUISITION. CSE: ASHL Corporate Presentation Q 3 - 2023 www.ashleygoldcorp.com Scan For Newsletter

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Investors are cautioned that, except for statements of historical fact, certain information contained in this document includes “forward looking information”, with respect to a performance expectation for Ashley Gold Corporation. Such forward looking statements are based o

  3. Slide 3: About Ashley Gold Corp

    ABOUT ASHLEY GOLD CORP Ashley Gold Corp was created to hedge against global inflationary pressures by investing in lower risk precious metals opportunities. With a conservative approach to capital structure, opportunity identification, and prudent exploration Ashley Gold Corp is positioning itself t

  4. Slide 4: Corporate Share Structure

    CORPORATE SHARE STRUCTURE © ASHLEY GOLD CORP SHARE STRUCTURE AS OF AUG. 17/23 EXCHANGE

  5. Slide 5: Why Ashley Gold?

    WHY ASHLEY GOLD? PEOPLE ⚬Ashley Gold has a well-rounded board and management team with proven track records of financing, discovery, and development. ⚬Driven to deliver long-term growth and value with low G&A costs. ⚬Proactive stakeholder engagement, strong capital market sense and minimally dilutiv

  6. Slide 6: Tabor Lake & Santa Maria Acquisitions

    TABOR LAKE & SANTA MARIA ACQUISITIONS o Ashley has strategically acquired 1811 hectares of contiguous land to develop into one large prospective property with a multitude of high-grade workings and sampling. o The property can be accessed just 10km south of Trans-Canada Highway #17, the main access

  7. Slide 7: Historical High-Grade Targets

    HISTORICAL HIGH-GRADE TARGETS Immediate Follow-Up Required to Validate Historical workings • A Historical Bulk Sample was taken in 1938 – Open cut at surface of 77 tons milled with an average grade of 0.54 oz/t (16.8 g/t) Au*. A 1.75 ton sample at 125 ft drift average 1.5 oz/t (42.43 g/t) Au*. • 198

  8. Slide 8: Drilling to Confirm Historical High-Grade

    DRILLING TO CONFIRM HISTORICAL HIGH-GRADE Historical Workings Achieved Excellent Results • DDH-8 (1958) – Encountered three, 3ft (0.9m) wide Parallel Veins over 30m with historical drill assays including 54 g/t Au over 0.3m, 1.93 oz/t (60.03 g/t) Au over 1.0m* and 26.95 oz/t (838.24 g/t) Au over 1.0

  9. Slide 9: Inversion Defines Mineralized Porphyry

    INVERSION DEFINES MINERALIZED PORPHYRY • April 2023 unconstrained magnetic inversion shows magnetic low over the mineralized zone • Results show potential for porphyry to be open below 250m • This will be tested in future deep drilling programs dependent on 2023 confirmation drilling

  10. Slide 10: Historical High-Grade Targets

    HISTORICAL HIGH-GRADE TARGETS An Airborne EM & magnetic survey was flown over the Santa Maria 4 Known Gold Showings on Property claims in 2012 by Geotech Ltd and identified 3 distinct EM anomalies. • The Santa Maria property is a continuation of the Tabor Lake Each anomaly is suggestive of bedrock c

  11. Slide 11: Howie Project

    HOWIE PROJ ECT • The Howie Project is comprised of 64 mining claims over 1000 Ha and shares a border with Dynasty Gold’s 180,000-ounce Au resource where the geology is strikingly similar. • Recently, Dynasty Gold had a successful drill program boasting intercepts of 9m of 22.58 g/t Au, 3m of 65.2 g/

  12. Slide 12: Howie Lake Project

    HOWIE LAKE PROJ ECT • Multiple Mineralized zones have been identified at surface and at depth • Fall 2023 program will be channel and rock sampling across these zones as well as geological mapping to understand the main structural controls for mineralization in preparation for a winter drill program

  13. Slide 13: Alto-Gardnar Project

    ALTO-GARDNAR PROJ ECT Alto-Gardnar Project ⚬The Alto-Gardnar Project is strategically located near Treasury Metals Inc. (TML.V) Goliath Gold Complex with a M&I Resource estimate of 2,138,600 oz of Au. ⚬Magnetics suggests shear continues along strike ⚬Historical grab samples recorded gold values as h

  14. Slide 14: Objectives / Path Forward

    OBJ ECTIVES / PATH FORWARD POSITIONED FOR LOW-RISK GROWTH AND SUCCESS OPTIMIZE BALANCE RISK-REWARD BUILD VALUE CURRENT OBJECTIVES PATH FORWARD ⚬Maiden Drill Program September 2023 on Tabor Lake ⚬Economical management compensation and G&A Lease ⚬Proactive stakeholder engagement including indigenous ⚬

  15. Slide 15: Management Team

    MANAGEMENT TEAM GEORGE STEPHENSON DARCY CHRISTIAN SHANNON BAIRD Chairman President & CEO Exploration Manager Mr. Baird brings over 17 years of Mr. Stephenson brings 45 years Mr. Christian has over 15 years technical, management, of experience in the areas of of International experience in evaluation

  16. Slide 16: Contact Us

    Contact Us: 707 7 Ave SW #1150, Calgary, AB T2P 3H6 info@ashleygoldcorp.com 1 (587) 777-9072 www.ashleygoldcorp.com CSE: ASHL Corporate Presentation Q3 - 2023 www.ashleygoldcorp.com

Ashley Gold — Investor Presentation (September 2023) on 6ix