Torrent Power Limited · NSE:TORNTPOWER

Torrent Power — Q2 FY2022-23 Earnings Presentation

24 slides from Torrent Power's earnings presentation, Nov 10, 2022

  1. Slide 1: Cover letter to stock exchanges

    November 10, 2022 To, To, Corporate Relationship Department Listing Department BSE Limited, National Stock Exchange of India Limited 14th Floor, P. J. Towers, “Exchange Plaza”, C – 1, Block G Dalal Street, Fort, Bandra- Kurla Complex, Bandra (East), Mumbai-400001 Mumbai-400051 SCRIP CODE: 532779 SCR

  2. Slide 2: Torrent Power Limited Investor Presentation Q2 FY 2022-23

    Torrent Power Limited Investor Presentation Q2 FY 2022-23

  3. Slide 3: Disclaimer

    DISCLAIMER This information may contain certain forward-looking statements/details in the current scenario, which is extremely dynamic and increasingly fraught with risks and uncertainties. Actual results, performances, achievements or sequence of events may be materially different from the views ex

  4. Slide 4: Presentation Outline

    PRESENTATION OUTLINE TORRENT GROUP TORRENT POWER LIMITED OVERVIEW OF OPERATIONS Q2 FY23 INVESTMENT RATIONALE FIVE YEAR TREND: KEY FINANCIAL & TECHNICAL STATISTICS

  5. Slide 5: Torrent Group

    TORRENT GROUP TORRENT PHARMACEUTICALS LIMITED • A generics pharmaceutical major with strong global footprint • Ranked in top 10 in Indian pharma market with leading position in niche therapeutic areas • Ranked No. 1 among Indian Pharma companies in Brazil, Germany & Philippines TORRENT POWER LIMITED

  6. Slide 6: Torrent Group

    TORRENT GROUP Turnover $ 3.00 Bn Market Cap $ 9.34 Bn Enterprise Value $ 10.88 Bn Employees 22,400+ Spreading smiles Illuminating Lives Not just healthcare… Lifecare Generating Trust. Distributing Opportunities. Turnover: $ 1.12 Bn Turnover: $ 1.88 Bn Building pan-India state-of-art Enterprise Value

  7. Slide 7: Torrent Power Limited

    TORRENT POWER LIMITED Spreading smiles Illuminating Lives Thermal Solar Wind Transmission Distribution - Licensed: - 2,730 MW - 263 - 138 MW oper- - 805 MW oper- - 430 MW of - 355 kms 400 kV - Licensed ational MW of capacity ational capacity Ahmedabad/ state-of-art gas operational & - 355128km Kms 4

  8. Slide 8: Torrent Power Limited asset locations

    TORRENT POWER LIMITED GUJARAT UTTAR PRADESH AMGEN (362 MW) Sabarmati, Agra Ahmedabad KARNATAKA DGEN (1200 MW) Dahej, Bharuch SUGEN & Kamrej, Surat Wind (120 MW) Gulbarga and UNOSUGEN Raichur, Karnataka (1530 MW) Wind (49.6 MW) Jamnagar Wind (251.6 MW) Kutch 03 Wind (50.9 MW) Rajkot 05 Wind (50.4 MW)

  9. Slide 9: Portfolio of Assets: Thermal Generation

    TORRENT POWER LIMITED PORTFOLIO OF ASSETS : THERMAL GENERATION Particulars Sugen Unosugen Dgen Amgen Capacity 1147.5 382.5 1200 362 (MW) (3 x 382.5) (1 x 382.5) (3 x 400) (1 x 120, 2 x 121) Plant Type Gas-based CCPP Gas-based CCPP Gas-based CCPP Coal Based Location Near Surat, Gujarat Near Surat, Gu

  10. Slide 10: Portfolio of Assets: Renewable Generation

    TORRENT POWER LIMITED PORTFOLIO OF ASSETS : RENEWABLE GENERATION Particulars Solar Wind Capacity (MW) 263 804.50 Gujarat,Maharashtra,Karnataka, Location Gujarat, Maharashtra & Telangana Rajasthan & Madhya Pradesh COD FY 15 to FY17 FY 12 to FY 19 Avg Tariff (₹/kWh) 7.46 3.96 • 352.50 MW with Company’

  11. Slide 11: Portfolio of Assets: Licensed Distribution

    TORRENT POWER LIMITED PORTFOLIO OF ASSETS : LICENSED DISTRIBUTION Ahmedabad/ Particulars Surat Dahej Gandhinagar Licensed Area ~ 356 sq. km. ~ 52 sq. km. ~ 17 sq. km. Peak Demand(FY22) 1,646 MW 689 MW 93 MW License validity Till 2025 Till 2028 Till 2034 Accolades / Highlights  T&D loss 3.9% during

  12. Slide 12: Portfolio of Assets: Licensed Distribution

    TORRENT POWER LIMITED PORTFOLIO OF ASSETS : LICENSED DISTRIBUTION Dadra and Nagar Haveli and Daman Particulars Dholera SIR and Diu Power Distribution Licensed Area ~ 920 sq. km. ~603 sq. km. Peak Demand(FY22) - ~1,150 MW License validity Till 2044 Till 2047 Accolades /  Major project on DMIC, to be

  13. Slide 13: Portfolio of Assets: Franchised Distribution

    TORRENT POWER LIMITED PORTFOLIO OF ASSETS : FRANCHISED DISTRIBUTION Particulars Bhiwandi Agra Shil, Mumbra, Kalwa (SMK) Licensed Area ~ 721 sq. km. ~ 221 sq. km. ~65 sq. Km. Peak Demand 566 MVA 472 MVA 132 MVA (FY22) License validity 25th Jan 2027 31st March 2030 29th Feb 2040 Accolades /  Country'

  14. Slide 14: Overview of Operations – Q2 FY 2022-23

    OVERVIEW OF OPERATIONS – Q2 FY 2022-23 Consolidated Financial Statement Q2 22-23 Q2 21-22 Growth H1 22-23 H1 21-22 Growth FY 21-22 (₹ in Cr.) Unaudited Unaudited % Unaudited Unaudited % Audited Revenue from Operations 6,703 3,648 84% 13,213 6,747 96% 14,257 Power Purchase Cost 4,457 2,165 9,182 4,06

  15. Slide 15: Overview of Operations – Q2 FY23

    OVERVIEW OF OPERATIONS – Q2 FY23 The TCI for Q2 FY23 was higher by Rs. 118 Cr compared to Q2 FY22. The major reasons for improvement in the adjusted TCI for the y-o-y basis are:  Increase in contribution from franchised distribution business due to reduction in T&D losses on account of continuous a

  16. Slide 16: Q2 Thermal PLF / Net Generation

    OVERVIEW OF OPERATIONS – Q2 FY23 Q2 Thermal PLF(%)/ Net Generation(MUs) 91.5% 82.8% 670 MUs 69.8% 59.2% 603 MUs 573 40.3% 1459 MUs MUs 34.7% 2635 2032 MUs MUs 13.3% 7.0% 3.0% 844 174 0.0% 0.0% 0.0% MUs MUs 174 MUs SUGEN UNOSUGEN DGEN GAS PLANTS AMGEN THERMAL 1147.5 MW 382.5 MW 1200 MW 2730 MW 362 MW

  17. Slide 17: Q2 Renewable PLF / MUs Dispatched

    OVERVIEW OF OPERATIONS – Q2 FY23 Q2 Renewable PLF (%)/ MUs Dispatched 35.9% 27.7% 558 MUs 475 MUs 14.9% 12.9% 39 86 MUs 264 MUs MUs WIND 804.5 MW SOLAR 213 MW Q2 21-22 Q2 22-23

  18. Slide 18: Q2 USO/Purchase and T&D Loss

    OVERVIEW OF OPERATIONS –Q2 FY23 Q2 USO/Purchase (MUs) 2,487 2,266 2,281 1,004 913 886 993 663 693 166 181 186 193 Ahmedabad Surat Dahej DDDNH Bhiwandi Agra SMK Q2 22 Q2 23 T&D Loss (%) T&D Loss(%) 42.26% 6.12% 5.57% 35.32% 3.60% 3.13% 2.13% 13.07% 10.98% 13.09% 11.35% 0.44% 0.57% Ahmedabad Surat Dah

  19. Slide 19: Investment Rationale

    INVESTMENT RATIONALE • State of the art gas • Huge growth • Need for a robust • Opportunities for based plants potential in grid to support private sector renewables; returns increase in considering the • Direct import of LNG above COE for renewables capacity endemic at efficient cost selected proje

  20. Slide 20: Investment Rationale

    INVESTMENT RATIONALE Excellent Regulated operational Promising businesses records growth ensuring opportunities stable returns Unmatched Strong project distribution management model skills World class Rational generation Value allocation of assets Creation capital

  21. Slide 21: 5 Year Trend - Financial Statistics

    5 YEAR TREND - FINANCIAL STATISTICS Revenues from Operations (₹ Crore) EBIDTA (₹ Crore)/EBIDTA Margin (%) 13641 14257 13151 11512 12173 3826 3734 3607 3381 3389 30% 29% 27% 27% 26% 2017-18 2018-19 2019-20 2020-21 2022-22 2017-18 2018-19 2019-20 2020-21 2021-22 TCI* (₹ Crore) Net Worth (₹ Crore) 1072

  22. Slide 22: 5 Year Trend - Financial Statistics

    5 YEAR TREND - FINANCIAL STATISTICS Net Debt / EBITDA Net Debt Equity Ratio 2.61 0.89 2.49 0.80 0.80 0.80 2.18 2.24 1.98 0.64 17-18 18-19 19-20 20-21 21-22 17-18 18-19 19-20 20-21 21-22 Return on Capital Employed Return on Networth 14.22% 12.62% 12.42% 10.01% 10.31% 11.05% 9.62% 9.32% 9.54% 8.23% 17

  23. Slide 23: 5 Year Trend - Operational Statistics

    5 YEAR TREND - OPERATIONAL STATISTICS THERMAL PLF (%) T&D loss (%) Licensed Distribution 87.8% 6.31% 6.03% 71.4% 72.9% 5.61% 76.9% 4.98% 65.3% 60.1% 57.8% 59.9% 4.06% 4.17% 62.3% 44.3% 3.59% 3.43% 3.43% 59.9% 44.3% 3.38% 33.3% 41.1% 33.4% 40.7% 38.4% 9.8% 30.6% 0.0% 0.0% 6.5% 0.40% 0.35% 0.31% 0.49%

  24. Slide 24: Thank You

    THANK YOU Contact details: Rishi Shah Torrent Power Limited “Samanvay”, 600 Tapovan, Ambawadi, Ahmedabad 380015 Ph. No. (079) 26628473 Email: IR@torrentpower.com

Torrent Power — Q2 FY2022-23 Earnings Presentation on 6ix