Afentra Plc · LSE:AET

Afentra — Investor Presentation (September 2025)

5 slides from Afentra's investor presentation, September 2025

  1. Slide 1: African Energy Transition: Value driven growth - Block 3/24

    African Energy Transition Value driven growth Block 3/24 September 2025 Afentra plc 1

  2. Slide 2: Disclaimer

    Disclaimer The information set out in this presentation and the accompanying verbal presentation including any question and answer session and any documents or other materials distributed with the presentation (the “Presentation”) has been produced by Afentra plc (the “Company”) as at the date of th

  3. Slide 3: Strategic Addition to Afentra's Portfolio

    Strategic Addition to Afentra’s Portfolio Highlights ▪ Natural extension of Afentra’s infrastructure-led strategy ▪ First offshore operatorship, leveraging existing technical and operational capability ▪ Adjacent to Block 3/05 offering significant value from development synergies ▪ Potential to unlo

  4. Slide 4: Low-Cost Development Opportunities Adjacent to Existing Infrastructure

    Cefo Palanca NE Low-Cost Development Opportunities Discovery date: 1988 Test rate: 1,150bcpd + Discovery date: 1988 Test rate: 6,000 bopd Adjacent to Existing Infrastructure 32 mmscfd Provisional OIIP: 24 mmbbl Provisional GIIP: 400 bscf Golungo Proven Discoveries Discovery date: 1988 Test rate: 2,4

  5. Slide 5: Uniquely positioned to capitalise on the African Energy Transition

    Uniquely positioned to capitalise on the African Energy Transition 1. 2. 3. 4. 5. Significant hydrocarbon Gap in market for Proven team Committed to African Energy Transition resource base in Africa credible operators to with significant responsible stewardship provides compelling with material M&A

Afentra — Investor Presentation (September 2025) on 6ix