  1. Slide 1: Value driven growth

    African Energy Transition Value driven growth Trading Update - Investor Presentation 7 July 2026 Afentra plc 1

  2. Slide 2: Disclaimer

    Disclaimer The following applies to this presentation, including the slides, the information contained in the slides, any question and answer session, any oral presentation and any written or oral material discussed or distributed during the presentation meeting (together, the "Presentation"). This

  3. Slide 3: Proven Value Creation Through Disciplined Capital Allocation

    Proven Value Creation Through Disciplined Capital Allocation Building scale, production and cashflow through strategic investment Team & Expertise ▪ Deep West Africa expertise ▪ Proven capital markets experience 6kbopd Disciplined M&A Net Production ▪ 4 acquisitions completed1 May 2021 120mmboe ▪ 4

  4. Slide 4: H1 2026 Highlights

    H1 2026 Highlights Building momentum across operations, financing and portfolio growth Net Production Crude Oil Sales ▪ Strategic Review concluded, Afentra will pursue the next phase of growth as an independent E&P company. 5,777 bopd ~1 mmbbls ▪ Balance sheet strengthened, completion new $125 milli

  5. Slide 5: H1 2026 Cash Reconciliation ($m)

    H1 2026 Cash Reconciliation ($m) 40.3 110.3 Net Cash $28.4m (3.5) 97.4 (7.2) (2.2) 27.5 32.2 Net Debt $21.8m 10.2 (1) (2) (3) (4) Balance @ Net Asset Prepayment Facility Net Equity Gross Cash Contingent G&A Non-recurring Balance @ 01-Jan-26 Cashflow (Net) Proceeds Inflows Consideration Overheads 30-

  6. Slide 6: Structured Offtake Profile, Volumes Projected to Rise

    Structured Offtake Profile, Volumes Projected to Rise Production growth from drilling & development activities support lifting volumes through 2028 FY 2026 ESTIMATED LIFTINGS FY 2027 / 2028 INDICATIVE ~2.3 mmbbls (includes ~0.36 mmbbls YE25 carried inventory) ~3.5 – 4.0 mmbbls p.a. Realised liftings

  7. Slide 7: Commodity Price Risk Management

    Commodity Price Risk Management Disciplined Hedging Strategy Secures Downside While Preserving Upside Exposure Hedge coverage by cargo period Hedging Position DOWNSIDE PROTECTION UPSIDE EXPOSURE ▪ ~48% of 2026 forecast sales hedged Q1-26 15% following selective execution 518 kbbl 85% Apr-26 100% ▪ C

  8. Slide 8: Funding Secured to Underpin Next Phase of Growth

    Funding Secured to Underpin Next Phase of Growth Refinancing objectives achieved, strengthening liquidity and capital flexibility REFINANCING OBJECTIVES Secure >$100m facility Lower cost of capital Liquidity to fund the near-term development programme Pricing to reflect the de-risked, cash-generativ

  9. Slide 9: Gunvor Facility

    Gunvor Facility Refinancing provides flexible debt structure at lower cost of capital Facility Overview Debt Maturity Profile ▪ $125m committed ($100m + $25m), plus uncommitted accordion2; ▪ Term SOFR + 6% margin Principal Tranches ($m) ▪ 4-year tenor ▪ 12-month principal repayment grace period Faci

  10. Slide 10: Equity Raise Accelerates Next Phase of Growth

    Equity Raise Accelerates Next Phase of Growth Capital Register Shareholder Base US$40 million raised 21 new institutional investors added Existing shareholder support maintained – Strong institutional demand resulted – 52% of placing allocated to new – 11+ existing shareholders increased in a heavil

  11. Slide 11: Existing Portfolio Driving Material Organic Upside

    Existing Portfolio Driving Material Organic Upside Offshore scale and onshore fast-cycle optionality underpin Afentra’s growth strategy Offshore Onshore ▪ >20kbopd net production potential ▪ Material emerging Kwanza Basin optionality ▪ Infrastructure-led redevelopment programme ▪ Early oil productio

  12. Slide 12: Multi-Billion bbl Shallow Water Assets Offshore Angola

    Multi-Billion bbl Shallow Water Assets Offshore Angola Significant recovery upside potential across Block 3/05 (30%), 3/05A (21.33%) & 3/24 (40% op) Scale of the Prize Oil & Gas in Place >3.7 bbo ~ 1.2 Tcf Reserve & Resource Potential >250 mmbo >550 Bcf Current 2P reserves: 106 mmbo Top 10 UK North

  13. Slide 13: Infrastructure Rejuvenation – 70% complete

    Infrastructure Rejuvenation – 70% complete Substantial investment has upgraded core infrastructure and extended asset life 2022 ~70% Complete ~30% Remaining ~$400m Infrastructure capacity of ~200,000 blpd, ~$180m Invested since 2022 Current throughput ~75,000 blpd Remaining investment FSO Asset Life

  14. Slide 14: Pacassa SW– Unlocking Large, Undrilled Potential

    Pacassa SW– Unlocking Large, Undrilled Potential Drilling underway on Pac SW-1 well; potential to open-up significant extension of the Pacassa Field Potential Oil in place1,2 Pacassa SW-1- Potential2 ▪ 5000+ bopd expected initial rate 32–210 mmbo ▪ US$50m well cost carried by Sonangol3 ▪ First Oil t

  15. Slide 15: Pacassa Field - Unlocking Large Undrilled Potential

    Pacassa Field - Unlocking Large Undrilled Potential Gross Production (kbopd) Upside/future work programmes 25.0 Growth from 2026/27 campaigns Underlying production 20.0 15.0 10.0 5.0 0.0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Gross Recoverable Volumes (mmbo)(1) 10

  16. Slide 16: Impala Field – Proven Resource, Material Untapped Potential

    Impala Field – Proven Resource, Material Untapped Potential Impala-2 well planned for Q3 2026, potential for significant additional reserves Oil in place1 lmpala 2 – Potential1 ▪ 4000 bopd expected initial rate 60–200 mmbo ▪ US$50m well cost carried by Sonangol2 ▪ First Oil target for Q4 2026 Recove

  17. Slide 17: Impala Area – Scaling a Proven Resource Base

    Impala Area – Scaling a Proven Resource Base Gross Production (kbopd) 20.0 Upside/future work programmes Growth from 2026/27 campaigns 15.0 Underlying production 10.0 5.0 0.0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 48.3 Gross Recoverable Volumes (mmbo)(1) Underlyin

  18. Slide 18: HWO Programme– Restoring Production from Shut-in Wells

    HWO Programme– Restoring Production from Shut-in Wells Low-cost interventions to unlock incremental reserves & resources Recoverable Potential1 HWO-Phase 1 – 2026 Campaign1 ▪ 3 workovers (integrity + gas lift failures) 10–25 mmbo ▪ ~3,500 bopd expected uplift in Yr 1 ▪ US$5-10m cost per workover ▪ F

  19. Slide 19: Palanca Field– Restoring Shut-In Production Potential

    Palanca Field– Restoring Shut-In Production Potential Gross Production (kbopd) Upside/future work programmes 15.0 Growth from 2026/27 campaigns Underlying production 10.0 5.0 0.0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Gross Recoverable Volumes (mmbo)(1) Underlying

  20. Slide 20: Block 3/24 – Near-Term Development Opportunity

    Block 3/24 – Near-Term Development Opportunity Three Proven Discoveries, Low-Cost Operated Development, FID Q4 2026 Block 3/24 Potential1 ▪ Portfolio diversity: 10 oil & gas discoveries, includes 3 previously produced fields ▪ All wells tested, with flow rates up to 6,000 bopd ▪ Estimated >190 mmbbl

  21. Slide 21: Offshore Redevelopment Programme

    Offshore Redevelopment Programme Phased execution to deliver material production growth Infrastructure led redevelopment programme Combined programme targeting 13kbopd in 2028 Targeting material growth in production and reserves Programme Multi-year drilling, HWO and exploration programme ▪ 2 wells

  22. Slide 22: Block 3/05 Area - Production Growth Drives Lower Unit Costs

    Block 3/05 Area - Production Growth Drives Lower Unit Costs Higher production reduces opex per barrel and increases cash generation OPEX SYNERGIES FLOW TO CASH GENERATION Opex vs Production at $75/bbl oil price 50 Production (kbopd) Opex range ($/bbl) Current Future (2025/26) (2030) Pre- Capex Asset

  23. Slide 23: Near-Term Investment Drives Step-Change in Cash Generation

    Near-Term Investment Drives Step-Change in Cash Generation Production growth drives significant cash generation Funding Visibility Secured Cash Flow Inflection Development programme supported by asset Material step-up in cash generation from 2028 cash flow and committed liquidity Net WI Production P

  24. Slide 24: Kwanza Onshore - Regional Comparison

    Kwanza Onshore - Regional Comparison Gabon Basin 3.5 Bn boe Untapped Hydrocarbon Potential Creaming Curve Onshore West Africa Basins (oil, gas and condensate) Onshore Gabon Basin (~47k Sqkm) ▪ 3.5 Bn boe discovered (2P reserves) Lower ▪ 2.5 Bn boe produced Congo Basin >2 Bn boe ▪ ~600 exploration we

  25. Slide 25: High-Impact Exploration Pipeline - Kwanza Onshore

    High-Impact Exploration Pipeline - Kwanza Onshore Systematic prospect maturation underway across a proven underexplored hydrocarbon basin BASIN LEAD HIGH-GRADING & PROSPECT DRILLING CANDIDATE VALIDATION GENERATION PRIORITISATION DEFINITION SELECTION eFTG + Legacy 40+ Basin Prospect Screening Target

  26. Slide 26: Accelerated Path to Early Production–Quenguela Norte

    Accelerated Path to Early Production–Quenguela Norte Large discovered resource supported by existing route-to-market infrastructure RESOURCE SUBSURFACE REDEVELOPMENT EXECUTION PRODUCTION VALIDATION MODELLING PLANNING PREPERATION READINESS Discovered Resource Concept Concept Permitting, Logistics, Op

  27. Slide 27: Kwanza Onshore – Value Driven Strategic Opportunity

    Kwanza Onshore – Value Driven Strategic Opportunity Building a Strategic Acerage Position Early Production Opportunity ▪ Previously produced oil fields offering considerable untapped potential ▪ Licenses benefit from favourable fiscal terms ▪ Potential for low-cost re-development of existing fields

  28. Slide 28: Activity Roadmap: Milestones & Catalysts

    Activity Roadmap: Milestones & Catalysts Block Project 2026 2027 2028 Block 3/05 Pacassa SW South Block 3/05 Impala-2 Block 3/05 HWO Phase I OFFSHORE Block 3/05 Palanca South Block 3/05 HWO: Future Phases Block 3/24 Block 3/24: GPQ Development Block 3/05A Gas Management KON15 eFTG/2D Seismic KON15 E

  29. Slide 29: Multiple Pathways to Long-Term Value Creation

    Multiple Pathways to Long-Term Value Creation Material Offshore and Onshore portfolio with potential for expansion PORTFOLIO OFFSHORE ONSHORE EXPANSION Production Early Revenue Angola Licence expansion 6K ➜ ~13k ➜ >20k bopd Quenguela Norte First Oil First mover advantage in Angola Targeting 2027 Low

  30. Slide 30: Afentra - Roadmap to Accelerated Value Creation

    Afentra - Roadmap to Accelerated Value Creation Clear pathway to production growth, cash flow expansion and value driven growth TODAY PHASE 2 DRIVERS VALUATION CREATION OUTCOMES ~ 6kbopd Offshore Growth net production Pac SW/Impala 2/GPQ Development/ 6k ~13k >20k bopd Further infill & satellite prog

  31. Slide 31: APPENDIX

    APPENDIX 31

  32. Slide 32: Five Years of Delivery, Positioned to Accelerate Growth

    Five Years of Delivery, Positioned to Accelerate Growth A unique strategic position built through disciplined execution Proven Relationships Execution & Trusted Team Reputation Shareholder Value Focus Strategic Disciplined Execution Angola Angola Position Relationships & Reputation Embedded Scalable

  33. Slide 33: Strengthened Board and Team

    Strengthened Board and Team Deep experience and expertise across Africa Thierry Tanoh Paul McDade Anastasia Deulina Ian Cloke Gavin Wilson Andrew Osborne Chairman Chief Executive Officer Chief Financial Officer Chief Operating Officer Non-Executive Director Non-Executive Director Joined 2023 Joined

  34. Slide 34: 2026/27 Hedging Portfolio

    2026/27 Hedging Portfolio Hedge structures, volumes and strikes prices by expected sales period Total sales volume Total hedged volume Collar volume Put volume Cargo period Collar ($/bbl) Put floor ($/bbl) (bbls) (bbls / %) (bbls / %) (bbls / %) Q1-26 518 k 80 k (15%) 80 k (15%) — $60 – $87 — Actual

  35. Slide 35: Afentra Increases Exposure to Blocks 3/05 and 3/05A

    Afentra Increases Exposure to Blocks 3/05 and 3/05A Building Scale and Alignment in Core Angola Assets Acquisition Highlights Post completion INA deal Sonangol deal Azule deal Etu deal interests ▪ Increases Afentra interest to: Block 3/05 ‒ 33.33% in Block 3/05 Sonangol (op.) 50% 36% 36% 39.34% ‒ 24

  36. Slide 36: Value Driven Deal Making

    Value Driven Deal Making Transaction Timeline Future contingent (Sep-21) (Apr-22) (Oct-22) Aggregate (Effective Date) considerations (YE 2025) Upfront $12.0m $56.5m $48.5m $117.0m Consideration ▪ INA Transaction – Block 3/05A up to $2.5m Adjustments1 $16.8m - ($4.3m) $12.5m subject to future Punja d

  37. Slide 37: Delivering an Industry Transition in Angola

    Delivering an Industry Transition in Angola UK 1993 30 Years 2023 ▪ Majority of production today managed by Independents 1.9 Mmbopd Production North Sea Industry Transition ▪ Improved Recovery ~25 Bn Reserves & Resources (boe) > 150 Transactions ▪ Life Extension of Assets > 70% Production from IOC’s

  38. Slide 38: Partnerships for Success

    Partnerships for Success Partnership Model ▪ Strategic alignment on asset outlook and sustainability agenda ▪ Aligning with operators with proven capabilities ▪ Materiality of interest to ensure relevance and influence ▪ Influence through leveraging of technical expertise ▪ Partner credibility and a

  39. Slide 39: History of the Asset

    History of the Asset Impala Palanca Cefo Palanca NE 3/05 First Oil: 1992 First Oil: 1985 Disc. date: 1988 Disc. date: 1988 ▪ Initial development phase 1983 – 1997 by ELF/Total STOIIP: 60 mmbbls STOIIP: 587 mmbbls Test rate: 1,150bcpd + 32 mmscfd Test rate: 6,000 bopd ▪ Sonangol P&P operator since 20

  40. Slide 40: Production Sharing Contract (PSC) Mechanics

    Production Sharing Contract (PSC) Mechanics Schematic Representation Illustrative Scenario Assuming Full Cost Recovery Key Fiscal Terms Block 3.05 Block 3.05A Block 3.05A (Caco Gazela) (Punja) Gross Revenue Cost Oil Limit 75% 50% 80% (100%) Profit Oil Sharing State Profit Oil Share 60% 30% 30% Contr

  41. Slide 41: Angola Onshore: Risk Service Contracts in Context

    Angola Onshore: Risk Service Contracts in Context Definition & Key Characteristics: ▪ RSCs – similar to PSCs - offer a clear commercial Risk Service Contract Production Sharing Contract framework. (RSC) Mechanics (PSC) Mechanics ▪ In an RSC the contractor is compensated on a fee- based structure thr

  42. Slide 42: Block 3/24 Risk Sharing Contract (RSC)

    Block 3/24 Risk Sharing Contract (RSC) Schematic Representation Fiscal Terms – Standard Terms Marginal Field Incentives ▪ Royalty or Petroleum Production Tax (“PPT”): 20% ▪ Royalty or Petroleum Production Tax (“PPT”): 10% ▪ Petroleum Income Tax (“PIT”): 65.75% ▪ Petroleum Income Tax (“PIT”): 25% ▪ P

  43. Slide 43: Why Angola?

    Why Angola? Abundant Resources Government Support Angola is Africa's second-largest oil The Angolan government is actively producer, with vast untapped reserves. seeking to attract foreign direct High quality mid-life assets primed for investment, offering incentives such as optimisation following p

  44. Slide 44: Angola’s Positive Transition

    Angola’s Positive Transition 2017 GDP: ▪ Mr Lourenço becomes president in elections replacing José Eduardo dos Santos, who $113.2bn (World ranking 66, World Bank 2024) ruled Angola for nearly four decades after independence in 1975 and through a long civil war that ended in 2002. Population: 36.75mn

  45. Slide 45: Afentra’s Founding Principles

    Afentra’s Founding Principles The Global Energy Transition will take time. Hydrocarbons are part of the transition and will continue to remain important in the overall energy mix. It is vitally important that we responsibly manage what has already been found. The socio-economic impact of the energy

  46. Slide 46: Uniquely positioned to capitalise on the African Energy Transition

    Uniquely positioned to capitalise on the African Energy Transition 1. 2. 3. 4. 5. Significant hydrocarbon Gap in market for Proven team Committed to African Energy Transition resource base in Africa credible operators to with significant responsible stewardship provides compelling with material M&A