Regis Resources Limited · ASX:RRL

Regis Resources — Q4 FY2018 Earnings Presentation

25 slides from Regis Resources's earnings presentation, Jul 31, 2018

  1. Slide 1: Regis Resources June 2018 Quarterly Report & Exploration Update

    1 REGIS RESOURCES LTD JUNE 2018 QUARTERLY REPORT & EXPLORATION UPDATE

  2. Slide 2: Disclaimer & Competent Persons Statement

    DISCLAIMER & COMPETENT PERSONS 22 STATEMENT This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL") and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Regis’

  3. Slide 3: Review of FY2018 Q4 Operations

    REVIEW OF FY2018 Q4 OPERATIONS 33 DUKETON CONTINUES TO DELIVER STRONG CASHFLOW Q4 Q3 OPERATIONS FY18 FY18  Q4 gold production 92,008 ounces, up 8% on Q3 Ore mined (Mbcm) 0.9 1.0  FY18 production 361,373 oz (top end of guidance)  Throughput, grade & recovery all in line or up on Q3 Waste mined (Mb

  4. Slide 4: Duketon

    3.5mt 3.0mt 140 3.0mt ert ~ 1.20 2.5mt r 1.00 2.0mt 2.0mt 0.80 15mt 15mt 4 0.60 1.0mt 1.0mt 0.40 o.Smt Set | 0.20 4 A 4 4 3 » S Po es eu eo gy oe el re “ e ¥ FF KF SF F rr FF FF TF KF KF SF ll Tonnes mined Strip ratio (w:0) EE Dry tonnes milled Head grade (g/t) 97.0% 100koz 1,200 1,000 95.0% | ” 75k

  5. Slide 5: FY2018 Q4 Operating Results

    FY2018 Q4 OPERATING RESULTS 55 Duketon Northern Duketon Southern Operations Operations Total Q4 Q3 Q4 Q3 Q4 Q3 Ore mined (Mbcm ) 0.2 0.4 0.7 0.6 0.9 1.0 Waste mined (Mbcm) 1.3 1.3 4.7 3.5 6.1 4.8 Stripping ratio (w:o) 7.4 3.1 6.9 5.6 7.0 4.6 Ore mined (Mtonnes) 0.3 0.8 1.8 1.6 2.1 2.4 Ore milled (Mt

  6. Slide 6: FY2018 Q4 Operating Results

    FY2018 Q4 OPERATING RESULTS 66 Duketon Northern Duketon Southern Operations Operations Total Q4 Q3 Q4 Q3 Q4 Q3 Ore mined (Mbcm ) 0.2 0.4 0.7 0.6 0.9 1.0 Waste mined (Mbcm) 1.3 1.3 4.7 3.5 6.1 4.8 Stripping ratio (w:o) 7.4 3.1 6.9 5.6 7.0 4.6 Ore mined (Mtonnes) 0.3 0.8 1.8 1.6 2.1 2.4 Ore milled (Mt

  7. Slide 7: FY2018 Q4 Operating Results

    FY2018 Q4 OPERATING RESULTS 77 Duketon Northern Duketon Southern Operations Operations Total Q4 Q3 Q4 Q3 Q4 Q3 Ore mined (Mbcm ) 0.2 0.4 0.7 0.6 0.9 1.0 Waste mined (Mbcm) 1.3 1.3 4.7 3.5 6.1 4.8 Stripping ratio (w:o) 7.4 3.1 6.9 5.6 7.0 4.6 Ore mined (Mtonnes) 0.3 0.8 1.8 1.6 2.1 2.4 Ore milled (Mt

  8. Slide 8: Cashflow Waterfall

    88 CASHFLOW WATERFALL Record quarterly cash-flow from operations of $85.3m (Q3: $71.0m)  7koz higher gold production at higher delivered gold price of $1,731/oz in Q4 (Q3: $1,688/oz) Effective cash build of $42.4m (Q3: $37.5m) after land purchases for McPhillamys End of quarter cash and bullion pos

  9. Slide 9: Operations Outlook

    99 OPERATIONS OUTLOOK FY2019 GUIDANCE  Gold production 340,000 – 370,000 ounces  Cash costs $880 – $950 per ounce  AISC $985 – $1,055 per ounce  Growth Capex: $40m  Majority of growth capital related to pre production mining of Tooheys Well and other satellite operations  FY19 guidance consist

  10. Slide 10: Exploration Update

    10 EXPLORATION UPDATE 10 DUKETON - SIGNIFICANT RESULTS IN Q4 Drilled 63,577m (Q3: 61,085m) on 18 gold projects Drilled a remarkable 235,678m in FY18  Rosemont & Garden Well Underground  RMT 71 RC & DD holes for 22,907m - strong results  GW 15 RC holes for 2,999m - strong results  Moolart Well 

  11. Slide 11: Rosemont Maiden Underground Resource

    ROSEMONT MAIDEN 11 11 UNDERGROUND RESOURCE INFERRED RESOURCES AT 2.0G/T CUT-OFF GRADE Gold Gold  Grades encouraging for the U/G mining proposition Tonnes Project Grade Metal  Completion of mining study and Board development (Mt) (g/t) (koz) decision expected shortly Rosemont Main 0.4 7.19 102  Ai

  12. Slide 12: Rosemont Underground Project

    ROSEMONT UNDERGROUND 12 12 PROJECT

  13. Slide 13: Rosemont Underground Potential for Resource Extension

    ROSEMONT UNDERGROUND 13 13 POTENTIAL FOR RESOURCE EXTENSION CONCEPTUAL LONG SECTION EXPLORATION FROM “WITHIN THE DRIVE”  Significant opportunity to conduct exploration and resource drilling from a potential underground development between the two zones in the current MRE:  Easier to hit targets th

  14. Slide 14: Rosemont Underground Potential for Resource Extension

    ROSEMONT UNDERGROUND 14 14 POTENTIAL FOR RESOURCE EXTENSION  Resource covers less than 1.3km of 4km strike and max depth of 150m below open pit designs  Infill and extensional drilling will continue parallel with and past development decision  In other target areas drilling would be best done fro

  15. Slide 15: Rosemont Underground Q4 Drilling – Confirming the Potential

    ROSEMONT UNDERGROUND 15 15 Q4 DRILLING – CONFIRMING THE POTENTIAL DRILL RESULTS IN Q4  Gold hosted in a steeply east dipping 345° trending quartz-dolerite unit  Gold mineralised quartz-dolerite unit is up to 80m wide.  Q4 drilling 71 DD & RC holes for 22,907m  Q4 Results (all outside reserves):

  16. Slide 16: Rosemont Underground Q4 Drilling – Confirming the Potential

    ROSEMONT UNDERGROUND 16 16 Q4 DRILLING – CONFIRMING THE POTENTIAL DRILL RESULTS IN Q4  Gold hosted in a steeply east dipping 345° trending quartz-dolerite unit  Gold mineralised quartz-dolerite unit is up to 80m wide.  Q4 drilling 71 DD & RC holes for 22,907m  Q4 Results (all outside reserves):

  17. Slide 17: Garden Well Underground Project

    GARDEN WELL 17 17 UNDERGROUND PROJECT MULTIPLE HIGH GRADE SHOOTS BELOW GARDEN WELL PIT  At least 4 high grade zones below southern end of GW pit  Including a new high grade shoot 300m south of the current pit design, 200m below surface and open down plunge

  18. Slide 18: Garden Well Underground Project

    GARDEN WELL 18 18 UNDERGROUND PROJECT SIGNIFICANT UNDERGROUND TARGET  Very significant underground target below southern end of GW open pit  Zone of continuous mineralisation 4-10m true widths & 300m N-S strike  100 – 300m below surface, dipping east and open to south  Regis earlier drill result

  19. Slide 19: Garden Well Underground Project: Significant Q4 Results

    GARDEN WELL 19 19 UNDERGROUND PROJECT SIGNIFICANT Q4 RESULTS  Programme continued in Q4 with 15 holes completed for 2,999 metres.  Significant results during the quarter include:  11m @ 6.06 g/t Au from 340m  8m @ 5.52 g/t Au from 342m  9m @ 3.42 g/t Au from 358m  3m @ 7.82 g/t Au from 220m 

  20. Slide 20: McPhillamys (NSW)

    20 McPHILLAMYS (NSW) 20 ORGANIC GROWTH PROJECT  Located in Central-West NSW  Well established gold mining district  Cadia, Cowal, Northparkes +45Moz*  Gold resource 2.31Moz  Gold reserve 2.03 Moz  One of Australia’s larger undeveloped open pit opportunities  PFS completed showing high quality

  21. Slide 21: McPhillamys EIS and DFS Update

    21 McPHILLAMYS 21 EIS AND DFS UPDATE  EIS – work continuing with most areas nearing completion subject to SEARs requirements  PEA formally submitted to DPE:  Triggers DPE to provide Regis with SEARs  SEARs allow EIS to be appropriately focussed to enable regulatory assessment  Completion of EIS

  22. Slide 22: McPhillamys: Discovery Ridge

    22 McPHILLAMYS 22 DISCOVERY RIDGE EXPECTED TO DELIVER SIGNIFICANT VALUE TO MGP  100% owned Discovery Ridge deposit located 32km away from McPhillamys by major highway  MRE of 13.84Mt @ 1.1g/t for 501koz*  Remaining results returned from Q3 RC drilling: • 35m @ 2.54g/t Au from 119m • 50.65m @ 2.8g

  23. Slide 23: Recap of Presentation

    RECAP OF PRESENTATION 23 23  Q4 gold production 92,008 ounces at AISC of A$982/oz  Another very strong operational quarter at the Duketon project  FY18 production 361,373 oz at AISC of $901/oz  Production at upper end of FY18 guidance & AISC below bottom of guidance  Record cash-flow from opera

  24. Slide 24: JORC Compliant Ore Reserve Estimates March 2018

    APPENDIX 1 JORC COMPLIANT 24 24 ORE RESERVE ESTIMATES 31 MARCH 2018 Group Ore Reserves as at 31 March 2018 Gold Proved Probable Total Ore Reserve Competent Cut-Off Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Project Type Person3 (g/t)2 (Mt) (g/t) (koz) (Mt)

  25. Slide 25: JORC Compliant Mineral Resources March 2018

    APPENDIX 2 25 25 JORC COMPLIANT MINERAL RESOURCES 31 MARCH 2018 Group Mineral Resources as at 31 March 2018 Gold Measured Indicated Inferred Total Resource Competent Cut-Off Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Project Ty

Regis Resources — Q4 FY2018 Earnings Presentation on 6ix