  1. Slide 1: High Grade Historical Gold Mine and Exploration Projects

    HIGH GRADE HISTORICAL GOLD MINE AND EXPLORATION PROJECTS ACQUISITION PRESENTATION - DECEMBER 2020

  2. Slide 2: Disclaimer

    DISCLAIMER The information presented to you by Viking Mines Limited ACN 126 200 280 in this presentation and any related documents (together, Materials) has been prepared for information purposes by Red Dirt Mining Pty Ltd (Company). The Materials do not contain all of the information required in a

  3. Slide 3: First Hit & Emerald Projects

    FIRST HIT & EMERALD PROJECTS • High Grade Exploration and Development Projects located 45km West of Menzies in the Eastern Gold Fields, Western Australian, along the Zuleika shear zone • First Hit project includes First Hit Mine and numerous advanced exploration targets • Multiple drill ready prospe

  4. Slide 4: First Hit Mine Historical Mining Operation

    FIRST HIT MINE HISTORICAL MINING OPERATION • Mined by Barra Resources and Barminco between 2001 and 2002, producing 30,830 oz via a decline extending to a depth of 180m below the box cut entrance1 • 100% owned, Granted mining lease valid until 2032 • Mineralisation Vein-hosted with thickness up to 1

  5. Slide 5: First Hit Mine Exploration Targets

    FIRST FIRST HIT HIT MINE MINE EXPLORATION TARGETS Section Looking West Intercepts below the existing resource: • 4.9m @ 64.8 g/t Au from 62.1m (FHU045) • 3.7m @ 22.2 g/t Au from 64.3m (FHU058) • 4.5m @ 10.00 g/t Au from 55.8m (FHU055) FIRST HIT MINE Near Surface Targets • 3m @ 9.3 g/t Au from 273.0m

  6. Slide 6: First Hit & Emerald Projects Eastern Goldfields Location

    FIRST HIT & EMERALD PROJECTS EASTERN GOLDFIELDS LOCATION Red Dirt Mining Ora Banda - Riverina 6

  7. Slide 7: First Hit Project Exploration Ready

    FIRST HIT PROJECT EXPLORATION READY • Primary focus is on expansion of existing First Hit mine and testing the numerous exploration targets to provide a pathway to resource estimation; • Outside of the existing mine area, numerous clearly defined exploration targets are defined by historical data se

  8. Slide 8: First Hit Mine Infrastructure

    FIRST HIT MINE INFRASTRUCTURE 8

  9. Slide 9: First Hit Mine Existing Infrastructure Onsite

    First Hit underground portal FIRST HIT MINE EXISTING INFRASTRUCTURE ONSITE Fuel storage facility - fuel tank and bowser removed Workshop area and mine office cement pads 9 Boxcut to the decline at First Hit - access blocked and portal fenced Vent rise – covered with steel plate

  10. Slide 10: First Hit Project Advancement Timeline

    FIRST HIT PROJECT PROJECT ADVANCEMENT TIMELINE EXPLORATION PROGRAM 2020 2021 FIRST HIT PROJECT Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Compilation of data – drilling, channel sampling, rock chips and soil samples Reconnaissance field investigations to confirm exploration approach Pla

  11. Slide 11: Contact

    CONTACT Dean Jagger Company Secretary 02 8072 1447 Charles Thomas Corporate Enquiries 0402 058 770 11