Viking Mines Limited · ASX:VKA

Viking Mines — Nevada Mining Day Conference - Sydney (November 2026)

12 slides from Viking Mines's conference presentation, Nov 19, 2026

  1. Slide 1: America Needs Tungsten. Linka Already Produced It.

    America Needs Tungsten. al use only Linka Already Produced It. Nevada Mining Day Conference - Sydney Three historic mines. 48 holes drilled, assays flowing: up to 18m at 0.47% WO₃ below historic workings. Linka Tungsten Project, Nevada, USA | 19 November 2026 ASX:VKA | OTCID:VKALF ASX:VKA | OTCID:VK

  2. Slide 2: Disclaimer & Competent Person's Statements

    IMPORTA NT INFORM AT I O N Disclaimer & Competent Person's Statements Disclaimer This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by This Presentation is not a prospectus, product disclosure statement or other offer docume

  3. Slide 3: Tungsten in the US, Right Now

    TH E TH RE E -QUESTIO N ANCHOR Tungsten in the US, Right Now WHY TUNGSTEN? WHY NOW? 0 tungsten mines operating in the USA today ~8x rise in APT price since start of 2025 al use only ⌟ Critical for munitions, aerospace ⌟ APT ~US$2,650/mtu, near and cutting tools. record highs.i ⌟ China controls ~85%

  4. Slide 4: Historic Linka Mine on the Ground

    Stockpileiv 14m at 0.56% WO₃ Surface Sampleiii LKMET0001 A065181 (LKRC0002)v 0.6% WO3 Linka (Main) Pit & 0.8%WO3 Shaft Visible scheelite: 150ft level 3m from 56.4m SW EXTENSION TARGET ~500m from Linka ~800M UNDER COVER (Main) Pit (LKRC0044)vi Hillside Shaft al use only Inclined ~80ft No levels mined

  5. Slide 5: Drilling Results to Date: Target Areas, Holes Drilled, 21 Pending Assays

    D R ILL I NG R E S ULTS TO D ATE 3 Target Areas, 48 Holes Drilled, 21 Pending Assays 48 RC holes for ~3,491m complete; remaining assays due through December.i TH IC K INTE R CE PTS WH AT IT C ONF IR M S ⌟ LKRC0005: 18m at 0.47% WO₃i ⌟ High-grade crown pillar from surface ⌟ LKRC0002: 14m at 0.56% WO₃

  6. Slide 6: Visual Intercepts Linka Main: Scheelite in 25 of 31 Holes

    VISUAL INTERCEPTS LINKA MAIN Logging Complete: Scheelite in 25 of 31 Holes. Assays expected through December for 13 holes with logged scheelite. al use only BEST VISUAL ZONES ⌟ LKRC0022: 14.5m from 16.8m (0.1–1.5%)i ⌟ Incl. very strong 3.0m from 23.6m ⌟ LKRC0024: 18.3m from 12.2mi ⌟ LKRC0030: 15.2m

  7. Slide 7: Visual Intercepts SW Extension

    VISUAL INTERCEPTS SW EXTENSION Scheelite Logged 500m SW of Linka Main. First visible scheelite outside Linka Main, on the same host contact. SW E XTE NSION ⌟ Targeting ~800m strike of limestone/monzonite contact under cover ⌟ Interpretation confirmed; contact hit in 6 of 10 SW Extension holesi al us

  8. Slide 8: Metallurgy & Ore Sorting

    ME TALLU RGY & ORE SORTING Two Levers: Conventional Metallurgy & Ore Sorting. Gravity and flotation: 56.9% WO₃ at 76.0% recovery. TOMRA XRT sorting upgraded feed up to 4.1x. GRAVITY + FLOTATION GRAVITY ALONE al use only 56.9% WO3 69.3% WO3 at 76.0% recovery from a 1.28% WO₃ head grade, Conquest, fro

  9. Slide 9: Concept Study, Bulk Sample, Toll Treatment

    PROCESSING TWO ROUTES, BOTH OPEN Concept Study, Bulk Sample, Toll Treatment An owner-operated modular plant and third-party toll treatment are being evaluated in parallel. CONCE PT STUDY ⌟ 300ktpa (~43tph) design case; 100 and 200ktpa al use only options ⌟ ~12 months fabrication + ~3 months site ass

  10. Slide 10: Fast-to-Market Strategy: Five Workstreams, One Restart Case

    F AST-TO-M A RKET STRATEGY Five Workstreams. One Restart Case. Evaluating the restart of a past-producing tungsten mine, not relying on a greenfield discovery. METALLURGY & RESOURCE EVALUATION PERMITTING PROCESSING Drilling Two Routes Late 2027 Target al use only ✓ 48 RC holes for ~3,491m completeii

  11. Slide 11: Corporate: Lean and Focused on Delivery

    C O R P O R A T E Lean and Focused on Delivery VKA A$0.009 2.58B A$23.2M A$4.06Mi A$19.1M ASX Share Price Shares on Issue Market Cap Cash Enterprise Value Close 16 November 2026 Pro forma 30 Sep 26 al use only Board and Management 0.025 250 MAIN FOCUS Nevada USA NEVADA TUNGSTEN 6 Projects hosting hi

  12. Slide 12: Why invest now.

    Why invest now. A brownfields restart plan. 48 holes drilled. Assays flowing. al use only ⌟ A past producer, not a discovery story ⌟ Thick scheelite intercepts above and below the old workings ⌟ More assays due through December ⌟ Metallurgical success and concept flowsheet in hand C O N T A C T ⌟ Tu

Viking Mines — Nevada Mining Day Conference - Sydney (November 2026) on 6ix