Slide 1: South America Region – Chucapaca Project
South America Region – Chucapaca Project Investor Visit – Lima, Peru Day 1 | 14 November 2011
Slide 2: Forward Looking Statement
Forward Looking Statement Certain statements in this document constitute “forward looking statements” within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of 1934. Such forward looking statements involve known and unknown risks, uncerta
Slide 3: Safety
Safety Safety is our number one value and comes before all else If we cannot mine safely, we will not mine 26 months without LTIs More than 2.5 million man hours worked without LTI 3
Slide 4: Project Team
Project Team Experienced project team Recently appointed Vice President – Concept and Studies Matt is a geologist with broad experience from greenfield exploration, mineral resource management through to mining Matt Dusci Exporation Manager He has been General Manager for Minera Gold Fields Pe
Slide 5: Joint Venture
Joint Venture Both joint venture partners have an excellent track record of developing projects in Peru Gold Fields, with 51% interest in the joint venture, operates the project Buenaventura, a major player in Peru’s mining industry for more than 40 years, owns the remaining 49% of the project 5
Slide 6: Geology & Mineral Resource
ss as eZ i r -- Ss 2 SSeS ee oa \ Rar Spo a = 2 Ve : on = at ™s£ Z - a “" Fy Ww” ey Geology & Mineral Resource CEM] Ficvos
Slide 7: Chucapaca Project – Location
Chucapaca Project – Location Titicaca Cerro Corona Lake 19 AREQUIPA 6 16 3 Chucapaca JV (CDH) Chucapaca PUNO Project TITIRE MINING CONCESSIONS Gold Fields Canteras del Hallazgo SYMBOLOGY Town !. Capital of Department MOQUEGUA Main Road Affirmed way Dirt Road BOLIVIA Pacific Ocean GRAPHIC SCALE TACNA
Slide 8: Physiography (DTM)
Physiography (DTM) Titicaca Cerro Corona Lake 19 6 16 3 Chucapaca JV (CDH) Chucapaca Project TITIRE M MINING CONCESSIONS S Gold Fields Canteras del Hallazgo SYMBOLOGY Town !. Capital of Department Main Road Affirmed way Dirt Road ELEVATION (masl) BOLIVIA 5500 5000 Pacific 4500 4000 Ocean 3500 GRAPHI
Slide 9: Mineral Deposits
Mineral Deposits LEGEND Quaternary Lakes Alluvial deposits Glacial - fluvio-glacial deposits Cenozoic Titicaca Late Miocene - Recent volcanic arc (andesite) Lake Paleogene andesite intrusion Miocene rhyodacite rhyolite intrusion Miocene lacustrine sediments and tuffs Continental sedimentary rocks an
Slide 10: District Geology
District Geology Canahuire Chucapaca Domes Complex 10
Slide 11: Canahuire Deposit
Canahuire Deposit View Looking West Diatreme breccia Hualhuani Fm. Complex Gramadal Fm. Gramadal Fm. Chucapaca dome Labra Fm. complex Looking to West 11
Slide 12: Timeline to Discovery
Timeline to Discovery © cx ieLos Sep 2008 May 2010 Sep 2011 Oct 2011
Slide 13: Drill Metres
Canahuire Resource Definition Drilling GF Phase 2 (July 2010 – Oct 2011) Total Meters –72,089m 24,000 GF Phase 1 (June 2009 – June 20,000 2010) Total Meters – 15,235m Drill Metres 16,000 BVN (July 2008 to May 2009) 12,000 Total Meters – 7,056m 8,000 4,000 - BVN Phase 1 Total Drill Metres (including
Slide 14: Major Intercepts
Major Intercepts CCP10_088 C CCP10_103 CCP09_060 131 131. 131.9 m @ 3.29g/t 163.50 m @ 3.71g/t CCP09_052 48.0m @ 18.71g/t Au Au 38.9m @ 10.1g/t Au Au DRILLING Buenaventura Gold Fields : 2009 009 - 2010 CCP11_280 Gold Fields : 2010 010 -2011 76.0m @ 7.71g/t Au CCP11_295 CCP1 1_29 95 72.7m @ 7.2 20g/t
Slide 15: Canahuire Deposit
Canahuire Deposit Cross Section 300W Silver (Breccia -BXP Gold (Replacement in limestone – CAL) Gold and Copper (Breccia –BXPS) Au (g/t) - Left Cu (ppm) - Right ≥5 ≥ 3,000 2-5 1-2 2,000 - 3,000 1,000 - 2,000 Gold (Replacement in 0.5 - 1 0.3 – 0.5 400 – 1,000 < 400 limestone and 0.1 – 0.3 < 0.1 struc
Slide 16: Canahuire Deposit
Canahuire Deposit Cross Section 300W CCP09_024 46 m @ 1.13g/t Au, 0.08% Cu, 8.71g/t Ag CCP09_29A CCP09_024 59.63 m @ 1.82g/t Au, 35.6 m @ 2.06g/t Au, 0.06% Cu, 7.44g/t Ag 0.04% Cu, 1.84g/t Ag CCP09_052 CCP10_085 38.9m @ 10.10g/t Au, 56.50 m @ 1.76g/t Au, 2.35g/t Ag & 0.03%Cu Au (g/t) - Left Cu (ppm)
Slide 17: Mineral Resource September 2011
Mineral Resource September 2011 35% increase in Mineral Resource to 7.6Moz AuEq from 5.6Moz AuEq Grade Metal Tonnes Category Au Ag Cu AuEq Au Ag Cu AuEq (Mt) (g/t) (g/t) Cu (%) (g/t) (Moz) (Moz) (Mlb) (Moz) Measured - - - - - - - - - Indicated 92.6 1.5 11.6 0.09 1.8 4.3 34.6 178.6 5.5 Inferred 40.2
Slide 18: Mineral Resource
Mineral Resource May 2010 Mineral Resource and Open Pit Shell (5.6Moz AuEq) Looking northeast, coloured by gold equivalent grades, blocks greater than 1.0 g/t AuEq E W 5.6 Moz AuEq Drilling completed to May 2010 18
Slide 19: Mineral Resource
Mineral Resource September 2011 Mineral Resource Model and Open Pit Shell (7.6Moz AuEq) Looking northeast, coloured by gold equivalent grades, blocks greater than 1.0 g/t AuEq CCP10-137 E W CCP11_274 25.8m @ 2.00g/t Au, 0.08% Cu 62.2m @ 5.23g/t Au, 0.16% Cu & 6.07g/t Ag from 409.4m & 22.68g/t Ag fro
Slide 20: Mineral Resource
Mineral Resource Mineral Resource (Indicated & Inferred) – OP Constrained 180 2.0g/t COG 4.0 1.0 COG 35.7Mt @ 3.7g/t AuEq for 81.6Mt @ 2.44g/t AuEq 4.3Moz AuEq 160 for 6.6Moz AuEq 3.5 140 3.0 120 2.5 100 Tonnes Grade 2.0 (Mt) (g/t AuEq) 80 1.5 60 Tonnes -Sep11 1.0 40 Tonnes - May 10 Grade - Sept 11
Slide 21: Mineral Resource – Sensitivity to Metal Price
Mineral Resource Sensitivity to Metal Price 150.0 25% Increase in Metal Prices 2.50 Tonnes • 9% increase in tonnes •2% increase in metal 145.0 Grade (AuEQ - g/t) (~7.8Moz AuEq) Grade (Au - g/t) 2.25 140.0 Average Grade Above Cut-off (Au) 135.0 Tonnes above Cut-off (Mt) 2.00 130.0 125.0 1.75 120.0 1.
Slide 22: Mineral Resource – Sensitivity to Costs
Mineral Resource Sensitivity to Costs 150.0 25% Decrease in Costs 2.50 • 11% increase in tonnes Tonnes 145.0 •4% increase in metal Grade (AuEQ - g/t) (~7.9Moz AuEq) 2.25 Grade (Au - g/t) 140.0 Average Grade Above Cut-off (Au) 135.0 Tonnes above Cut-off (Mt) 2.00 130.0 125.0 1.75 120.0 1.50 115.0 110
Slide 23: Exploration Potential
Exploration Potential Untested Exploration Potential within the Chucapaca AOI 23
Slide 24: Exploration Potential
Exploration Potential Titan Geophysical Survey – Deep Search Ground IP Canahuire C° Chucapaca Agani CCP11_414 24
Slide 25: Summary: Geology and Mineral Resource
Summary: Geology and Mineral Resource Canahuire – world class “quality” discovery in Southern Peru Rapidly advanced project from discovery 7.6Moz AuEq Mineral Resource (70% Indicated) in 3yrs from discovery Strong geological understanding of mineralisation controls Robust and quality Mineral
Slide 26: Project Summary
U =, See /) se = I ie Z = “ma * \ . aa at Ve ise = Project Summary CER Fievos
Slide 27: Mining Parameters
Mining Parameters Would be the 4th largest gold mine in South America if in operation today Mineable resources Ore production: 30,000 tpd Strip ratio: 5.8 : 1 Life of mine: ~10 years Gold production: ~400 – 600koz Au-Eq per year Mining equipment: 240T trucks, hydraulic excavators 27
Slide 28: Pit Design
Pit Design Currently designed with dual ramps N Highest bench: 4,974 m Lowest bench: 4,366 m Total pit height: 616 m 1.3 km Area: 149 Ha 1.6 km 28
Slide 29: Process and Metallurgy
Process and Metallurgy Type of process Gravity, Flotation & CIL Process Plant design criteria: Plant throughput: 30,000tpd Plant availability: 92% Design factor: 15% SG of ore: 2.91 29
Slide 30: Process Flow
Process Flow © 1ELDS Au, Ag
Slide 31: Main Components Process Plant
Main Components Process Plant Primary Crusher Milling Plant CIL Plant Acid wash and elution 31
Slide 32: Primary Crusher
Primary Crusher 32
Slide 33: Milling Circuit
Milling Circuit 33
Slide 34: CIL
L C Fievos
Slide 35: Acid Wash and Elution
Acid Wash and Elution 35
Slide 36: General Layout
General Layout (SHORT VIDEO, BASED ON GOOGLE EARTH, LINKED) 36
Slide 37: Project Parameters
Project Parameters Scoping Study Feasibility Study June 2010 Q2 2012 Tonnes (Mt) Grade AuEq Metal AuEq Tonnes (Mt) Grade AuEq Metal AuEq Inferred 83.7 2.1 5.6 40.2 1.7 2.2 Resources Indicated - - - 92.6 1.8 5.5 Total 83.7 2.1 5.6 132.7 1.8 7.6 Throughput 20,000 tpd 30,000 tpd Production 300-400koz/y
Slide 38: Indicative Timeline - Milestones
Indicative Timeline - Milestones 38
Slide 39: Local Social Context
Local Social Context Five year agreements signed with communities Strong community support for the project Land acquisition negotiations ongoing Intensive training and local employment Program 39
Slide 40: Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA) Golder Associates developing EIA Social and environmental baseline studies completed Project description to be completed in January 2012 First round of public consultation successfully completed Next stages scheduled March 2012 40
Slide 41: Environmental Impact Assessment
Environmental Impact Assessment 41
Slide 42: Water Supply
Water Supply Mine total requirements estimated at 180l/s 10 million m3 reservoir capacity would suffice 30 million m3 water reservoir to be constructed Surplus will be made available to communities Technical studies completed The EIA baseline studies scheduled for completion during Q4 20
Slide 43: Water Supply
Fievcos Water Supply SS FALE SN pRabeSausss veyeye Sates
Slide 44: Conclusion
Conclusion 9 Experienced team 9 Strong track record of developing projects in Peru 9 Quality Resource 9 Exploration upside 9 Studies being developed without surprises 9 Strong community support 44
Slide 45: Questions?
Questions? CE Fievos