Slide 1: BlackPearl Resources Inc. April 2012
BlackPear! Resources Inc. April 2012

Slide 2: Cautionary Statements
Cautionary Statements FORWARD-LOOKING STATEMENTS: This presentation contains certain forward-looking statements and forward-looking information (collectively referred to as "forward-looking statements") within the meaning of applicable Canadian securities laws. All statements other than statements o

Slide 3: Corporate Snapshot
Corporate Snapshot Market Capitalization • Current Market cap of $1.2 billion • Shares O/S – Basic 285 million – Fully Diluted 311 million • Management ownership 7% (11% fully diluted) Reserves & Resources • 2P Reserves – 36 mmboe, $637 million (10% Btax) • Best Estimate Resources – 752 mmboe, $3.6

Slide 4: Company Strengths
Company Strengths • Oil production from all three of our core areas Established Heavy Oil / • Using existing technology to exploit, will use new technologies to enhance Oil Sands Resource Base recovery • Operating in established reservoirs enhances performance predictability • Technical team has wor

Slide 5: Core Areas
Core Areas Core Area Profile Core 2P Contingent WI Operator Technology Areas Reserves (1) Resource (2) (mmbbls) (mmbbls) Onion 14 67 85% PXX Conventional Lake wells SAGD Mooney 16 37 100% PXX Horizontal wells Polymer flood Blackrod 2 648 100% PXX SAGD Our three core areas have common characteristics

Slide 6: Onion Lake – Conventional Development
Onion Lake – Conventional Development • Oil Current 2P 2C Quality Production Reserves (1) Resources (2) 11◦ API ≈7,000 bopd 14 mmbbls 4 mmbbls • Onion Lake’s current production represents 70% of BlackPearl’s total production • Over 200 future drilling locations assigned by Sproule in the 2P and 2C c

Slide 7: Onion Lake – SAGD Development
Onion Lake – SAGD Development • Oil Current 2P 2C Quality Production Reserves (1) Resources (2) 11◦ API - - 63 mmbbls • Net pay on a portion of the Onion Lake lands is 10 m – 25 m, making it suitable for thermal development • Submitted a 12,000 bbl/d SAGD commercial development application in 2011;

Slide 8: Mooney – ASP Flood
Mooney – ASP Flood (3) • Oil Current 2P 2C Quality Production Reserves (1) Resources (2) 16◦ API ≈1,900 bopd* 16 mmbbls 37 mmbbls * approx. 400 bopd in the flood area • EOR techniques key to enhancing value of this property; recovery rates are expected to increase from 4% to 25% • Phase 1 ASP flood

Slide 9: Mooney – ASP Flood
Mooney – ASP Flood Pilot BlackPearl land Phase 1 Active ASP Flood Phase 2 Future ASP Flood Future Phase ASP Flood Injection well Production well Future well Bluesky oil pool Current Activities • Construction of heavy oil battery – operational mid-year • Drill 15 – 20 horizontal wells on Phase 2 land

Slide 10: Mooney – Analog
Mooney – Analog • Expected response time of ASP flood is 18 – 24 months • Production response should see wells return to, or above, their IP rates • Production should be flat for 24 – 36 months, followed by low decline rates 10

Slide 11: Blackrod – SAGD Oil Sands Project
Blackrod – SAGD Oil Sands Project • Oil Current 2P 2C Quality Production Reserves (1) Resources (2) 9◦API >300 bopd 2 mmbbls 648 mmbbls • Located in the Athabasca Oil Sands region • Lower Grand Rapids formation at a depth of approximately 300 metres; 10-26 metres of net pay • Blackrod to be develope

Slide 12: Blackrod – Pilot Progress
Blackrod – Pilot Progress • Producing over 300 bopd after 9 months of steam injection; instantaneous SOR of approximately 3 • Performance is exceeding model expectations • Target production of 500+ bbls/day in the next six to twelve months • Pilot to be expanded in 2012 with an additional well pair

Slide 13: Blackrod – Commercial Development
Blackrod – Commercial Development • 80,000 bbl/day commercial development 2012 2013 2014 2015 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 application to be filed in Q2 2012 Environmental Data Gathering Facilities Engineering • Project to be built in phases, with the first Regulatory Review phase

Slide 14: 2012 Expected Technical Milestones
2012 Expected Technical Milestones Onion Lake • Continue primary development – our largest source of cash flow • Regulatory approval for commercial SAGD project • Thermal reserves being booked on the project (30 – 50 mmbbls) Mooney • Production response from Phase 1 of the ASP flood; moving barrels

Slide 15: Potential Production Profile
Potential Production Profile Production (bbls/d) (1) • Full development of existing properties 100,000 could see production 90,000 80,000 reach over 80,000 70,000 bbls/d 60,000 • Potential to reach 50,000 30,000 bbls/d by 2016 40,000 30,000 20,000 10,000 - 2012 2013 2014 2015 2016 2017 2018 2019 202

Slide 16: 2012 Guidance
2012 Guidance 2012 Capex Program ($mm) Production Blackrod; Non-Core; Onion Lk; $27.2 $17.9 $36.1 Year average (boe/d) 10,000 Year-end exit (boe/d) 11,000 – 12,000 Financial Mooney; Capital expenditures ($mm) 125 – 135 $50.8 Cash flow from operations ($mm) 85 – 90 Per Share 0.31 2012 Production Prof

Slide 17: Funding Requirements
Funding Requirements 1. The ongoing development of our 400 conventional reserves at Onion Lake and 350 Mooney will be funded from cash flow. We 300 are developing a financing strategy to add Funding 20,000 bbls/d of thermal production by 250 Funding gap gap 2016. 200 2. No additional funding require

Slide 18: PXX Shares – Net Asset Value
PXX Shares – Net Asset Value 1) Estimated Net Asset Value Per FD Share $20.00 2P Reserves @ 10% Btax (1) $2.09 $15.00 Contingent Resource (2) @ 10% Btax $11.82 8% $10.00 10% Other (land, working capital, etc.) $0.26 12% Current $14.17 $5.00 share price ($4.25) $0.00 Net Asset Value ($/share) 2) Mark

Slide 19: Converting Resource Into Reserves
Converting Resource Into Reserves Anticipated Initial Resource Steps Required for Initial Recognition of Reserves Recognition in (mmbbls) (1) Reserves 2012 (mmbbls) (2) Blackrod 648 • Commercial project application filed 150 – 175 in Q2 2012 Onion Lake 67 • Commercial project approval 30 – 50 Mooney

Slide 20: What Could Go Wrong
What Could Go Wrong Uncontrollable • Oil Prices: when WTI <$60, we do not get a return; when WTI <$35, we do not have cash flow • Government and Regulatory: our only defense is maintaining a low cost structure • Oil Sands Infrastructure: we have no significant advantage Controllable • Inflation: we

Slide 21: Reasons to Invest
Reasons to Invest In Summary, BlackPearl provides: 80,000 • Disciplined, experienced heavy oil bbls/d 15,000 management team bbls/d 8,000 • Large high quality, high impact oil 53 mmbbls bbls/d properties 81 mmbbls • Well defined growth plans 650 mmbbls 21

Slide 22: Appendix
* ) BlackPearl Resources Inc. Appendix 22

Slide 23: Large Resource Base
Large Resource Base •Focused Development •3 Core Properties •Well Defined Resource •Relatively narrow range between high and low estimates •No significant technical contingencies •Ability to reclassify from resource to reserves Contingent Resource (MMbbls) (2) Net Present Values of Future Net Revenu

Slide 24: Contingent Resource Definitions
Contingent Resource Definitions • Contingent Resources are defined in the COGE Handbook as those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but are not currently considere

Slide 25: Sproule Resource Assessment – Oil Price Assumptions
Sproule Resource Assessment – Oil Price Assumptions The price forecasts and assumptions that formed the basis for the revenue projections in the Sproule assessment was based on Sproule’s pricing models as of December 31, 2011. A summary of selected items from these pricing models are set forth below

Slide 26: Blackrod Relative Geographical Size
Blackrod Relative Geographical Size BlackPearl: Blackrod Connacher: Great Divide CNRL: Primrose Cenovus: Foster Creek 26

Slide 27: Grand Rapids SAGD Project Comparison
Grand Rapids SAGD Project Comparison 27

Slide 28: The Blackrock Story
The Blackrock Story 25 20,000 1000 $25 20 16,000 800 $20 Share Price ($/share) Production (boe/d) Reserves (mbbls) CF Multiple 15 12,000 600 $15 10 8,000 400 $10 5 4,000 200 $5 0 0 0 $0 2001 2002 2003 2004 2005 2006 Production (boe/d) Reserves (mbbls) CF Multiple Share Price ($/share) (Prov+Prob+Pos
Source: Internet Archive copy of blackpearlresources.ca
More decks from BlackPearl Resources Inc
Investor Presentation (April 2018)24 slides · April 2018
Investor Presentation (September 2017)22 slides · September 2017
Shareholder Meeting (May 2017)25 slides · May 4, 2017
Corporate Update (March 2016)22 slides · March 2016
Investor Presentation (September 2015)23 slides · September 2015
Investor Presentation (February 2015)26 slides · February 2015