Castile Resources Ltd · ASX:CST
Castile Resources — Investor Presentation (April 2022)
26 slides from Castile Resources's investor presentation, Apr 21, 2022
Slide 1: Copper and Cobalt Covered in Gold
Copper and Cobalt Covered in Gold Pure Metals for the Electrification Revolution Investor Presentation April 2022
Slide 2: Compliance & General Disclaimer
Compliance & General Disclaimer COMPETENT PERSONS STATEMENTS The information in this report that relates to Exploration Results and Mineral Resources and Exploration Data is based on, and fairly and accurately represents, information and supporting documentation compiled by Mr. Jake Russell B.Sc. (H
Slide 3: Corporate Snapshot
Corporate Snapshot SHAREHOLDERS RESEARCH COVERAGE CAPITAL STRUCTURE Australia 7.0% UK 12.0% 199.7 A$6.67 33.9% North America MILLION MILLION Western 0.2% Zone Europe (ex UK) SHARES ON ISSUE CASH (AT 31-DEC-21) 15.0% Asia 10.9% Board and CAPITAL STRUCTURE Management 1YR SHARE PRICE CHART A$34.0 0.35
Slide 4: Investment Summary – Gold and Battery Metals
Investment Summary – Gold and Battery Metals Rover 1 is a large polymetallic orebody offering diversity of revenue streams in Gold, Copper, Cobalt and a Magnetite Industrial Mineral Castile will be able to directly supply battery producers and end users in Australia with the critical minerals for el
Slide 5: The Rover Mineral Field – A Multi-Deposit Strategy
The Rover Mineral Field – A Multi-Deposit Strategy 5 ASX:CST 8 MARCH 2022 “Large Increases in Gold, Copper and Cobalt At Rover 1”
Slide 6: Significant High-Grade System
Significant High-Grade System Gold Intercepts Copper Intercepts 21m @ 6.86% Cu 10m @ 47.97g/t Au from 469m in WGR1D011 from 471m in R1ARD41-1 27m @ 4.75% Cu 7m @ 125.93 g/t Au from 429m in WGR1D024-1 from 542m in WGR1D034 42m @ 4.10%Cu 12m @ 58.40 g/t Au from 360m in R1ARD30 from 555m in WGR1D002-5
Slide 7: Rover 1 – Resource Definition Drilling Complete
Rover 1 – Resource Definition Drilling Complete Castile Drilling Program Highlights 2021 Drilling Program Hole 20CRD001 30.4m @ 35.6 g/t Au with 1.46% Cu inc 13.2m @ 76.27g/t Au with 1.16% Cu Hole 21CRD001A 31.7m @ 8.6g/t Au with 0.8% Cu inc 11.5m @ 17.2 g/t Au with 1.1% Cu Hole 21CRD005 42.2 m at 3
Slide 8: Large Increases in Indicated Resources for the Pre-Feasibility Study
Large Increases in Indicated Resources for the Pre-Feasibility Study Engineers designing a 500,000tp/a Processing Plant for the PFS Classification Rover 1 Mineral Resource Estimate Gold (Oz) Copper (T) Cobalt (T) Magnetite(T) Indicated 242,600 63,400 2,900 933,000 Inferred 20,900 14,000 900 163,000
Slide 9: Rover 1 – Large Increases in Indicated Resources
Rover 1 – Large Increases in Indicated Resources of Key Metals Gold, Copper and Cobalt1 40% 65% 61% New Indicated INCREASE INCREASE INCREASE Resource 242,000 63,400 2,900 933,000 OUNCES TONNES TONNES TONNES 9 1The Company refers to the exploration results for comparison in this presentation as sourc
Slide 10: The Right Mineral Products at the Right Time
The Right Mineral Products at the Right Time Gold Dore Pure Copper Metal Pure Cobalt Metal Gold Dore (Bullion) – Direct Sale to Perth Mint Copper Plate – Direct Sale to End Users Cobalt Metal – Direct Sale to Battery Producers Gold Copper Cobalt 10 Source: 5-year Gold, Copper and Cobalt pricing grap
Slide 11: Pure Battery Metals for the Electrification Revolution
Pure Battery Metals for the Electrification Revolution Castile will produce pure Copper and Cobalt metal required for EV’s, charging networks and battery producers Cobalt is listed as a critical mineral by the Australian Federal Government Source: copper.org Source: visualcapitalist.com 11
Slide 12: High Grade Industrial Mineral From the Host Rock at Rover 1
High Grade Industrial Mineral From the Host Rock at Rover 1 Indicated Magnetite Resource 933,000t Inferred Magnetite Resource 163,000t Total 1,096,000t Approximately 24% of the host rock ore mined will be magnetite. Castile can recover 67.7% of that material and produce a high quality P9553mm magnet
Slide 13: Fully Engineered Mining Plan For the Pre-Feasibility Study Complete
Fully Engineered Mining Plan For the Pre-Feasibility Study Complete Dynamic Charging Solution for EV Fleet 13
Slide 14: Pure Metals to be Produced for Direct Sale to End Users
Pure Metals to be Produced for Direct Sale to End Users Proposed Rover 1 Processing Flowsheet Magnetic HIGH TOTAL Grinding Gravity Bulk Sulphide Separator Float RECOVERIES OF GOLD, PURE COPPER AND PURE COBALT Crushed ore METALS Fine Grind Fine 500,000t PROCESSING PLANT Grind Oxidation CAPABILITY PRO
Slide 15: Potential for a Multi-Deposit Mining Precinct
Potential for a Multi-Deposit Mining Precinct
Slide 16: Potential for a Multi-Deposit Mining Region
Potential for a Multi-Deposit Mining Region 16
Slide 17: Rover 4 – Expanding the Footprint of the Rover 1 Strategy
Rover 4 – Expanding the Footprint of the Rover 1 Strategy Potential To Add A Resource at Rover 4 to the Rover 1 Development Schematic of Rover 1 Engineering Design with Rover 4 Location Facing West Plan View of Rover 1 Proposed Engineering Design with Rover 4 Location 17 ASX:CST 2 February 2022 “Cop
Slide 18: Rover 4 – Further Drilling and Analysis to Estimate A Resource
Rover 4 – Further Drilling and Analysis to Estimate A Resource 18 ASX:CST 2 February 2022 “Copper At Rover 4 Adds to Plans at Rover 1”
Slide 19: Explorer 108 – The Next Development Target
Explorer 108 – The Next Development Target Explorer 108 Extensional Drill Hole NR108D049-1 drilled by Castile in 2021 returned sections of high grade High Grade Zinc/Lead zinc and lead with trace copper from a massive Deposit already 145m mineralised interval defined as Castile’s next development Hi
Slide 20: Explorer 142 – The Rover 1 Lookalike
Explorer 142 – The Rover 1 Lookalike 20 The Explorer 142 Resource is comprised of the following Inferred Resource of 176kt @ 5.21% Cu and 0.21g/t Au.
Slide 21: Warumpi Project – Potential for Significant Base Metals Mineralisation
Warumpi Project – Potential for Significant Base Metals Mineralisation Highly prospective grass-roots exploration project located approximately 300 km west of Alice Springs in the West Arunta region of the Northern Territory. The age of the Warumpi Province (1690–1610 Ma) is a particularly significa
Slide 22: Board & Management – Strong Project Development Expertise
Board & Management – Strong Project Development Expertise Peter Cook Mark Hepburn John Braham Jake Russell Michael Poepjes Mark Savage Non-Executive Chairman Managing Director Non-Executive Director Non-Executive Director Mining Engineer Geology Manager Mr Cook is a geologist BSc Mr Hepburn has a de
Slide 23: Investment Summary
Investment Summary NEAR TERM CATALYSTS Starting with Rover 1 there is potential for a multi- APRIL deposit mining jurisdiction situated in the highly EXTENSION AND 2022 REGIONAL prolific Tennant Creek region DRILLING PROGRAM Diversity of revenue streams and metal products to DRILLING May create a na
Slide 24: Strong NT Government Support and Community Engagement
Strong NT Government Support and Community Engagement Castile is committed to maintaining strong Territory and local government support Supporting local indigenous population via employment and community enrichment programs Castile has donated Sporting Equipment to all schools within the entire Bark
Slide 25: Contact
Level 7, 189 St Georges Tce Mark Hepburn Perth WA Managing Director info@castile.com.au
Slide 26: Pressure Oxidation Processing Comparables
Pressure Oxidation Processing Comparables The Çöpler Gold Mine, Turkey Owned by SSR Mining Nasdaq : SSRM Pressure Oxidation Gold Recovery : 91% Processing Costs of Sulphide Ore : US$36/t 2021 Gold Production 329,276 ounces at AISC $USD 713 The Copler Mine (80% SSRM owned) is part of the Çöpler Distr