  1. Slide 1: Australia's Next Standalone Gold Producer in the Heart of WA Goldfields

    For personal use only Australia's Next Standalone Gold Producer in the Heart of WA Goldfields Investor Presentation April 2026

  2. Slide 2: For personal use only

    For personal use only

  3. Slide 3: Important disclaimers

    Important disclaimers Nature of Document This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders, Not an offer related bodies, corporate, partners, affiliates, employees, representatives or advisers, make any The information contained in the Pres

  4. Slide 4: Important disclaimers

    Important disclaimers Forward Looking and Cautionary Statement As noted above, some statements in this Presentation regarding estimates or future events are forward looking statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward

  5. Slide 5: Investment proposition

    Investment proposition Projects An attractively priced West Australian gold Regional Landholding developer with near-term growth +1,150km² Carnarvon Mineral Resource Estimate1 1.9Moz 34.3Mt @ 1.7g/t Au For personal use only Studies support development of a gold operation 20.2Moz Ag 104kt Zn producin

  6. Slide 6: Positive Black Swan Study Results and Equity Raising

    Positive Black Swan Study Results and Equity Raising Fully funded to refurbish Black Swan Processing Hub and commence gold production For personal use only Positive Black Swan study results – a low capital intensity pathway to +100kozpa • Pre-production capital – A$160.5M & ~A$1,500/oz capital inten

  7. Slide 7: Maritana Minerals – at a glance

    Maritana Minerals – at a glance An attractively priced West Australian gold developer with near-term growth potential Share Trading & Price Capital structure Units Current For personal use only Volume Price $2.00 20 Share price A$/sh 0.895(1) 18 Million Ordinary shares M 371.8(1) 16 $1.50 14 Options

  8. Slide 8: Maritana Minerals – Board and Management

    Maritana Minerals – Board and Management Key experience in operations and value delivery For personal use only Ashok Parekh Grant Haywood Rob Waugh Warren Hallam Isabel Macchia Non-Executive Chair Managing Director Non-Executive Director Non-Executive Director Company Secretary Brendan Shalders Chri

  9. Slide 9: Project portfolio

    Project portfolio Strategically constructed gold portfolio centered around major geological structures • Large 1,167km2 land package in an For personal use only attractive geological setting centred around Kalgoorlie / Coolgardie • 1.9Moz Group Mineral Resource1 (34.3Mt @ 1.7g/t Au) with ~50% contai

  10. Slide 10: Our Strategy

    Our Strategy An attractively priced West Australian gold developer with near-term growth For personal use only Now Next 12 months 2027 onwards Toll treatment complete Black Swan refurbishment and gold P Production Ore stockpile established Operational de-risking underway processing conversion Mining

  11. Slide 11: Production Ready

    For personal use only Production Ready A 1.9Moz Mineral Resource1 with processing infrastructure and growth 1. Refer ASX Announcement “Gold Mineral Resources Update” dated 13 February 2026

  12. Slide 12: Black Swan Processing Hub

    Black Swan Processing Hub1 PROCESSING Facilitates hub and spoke operating model • ~50km northeast of Kalgoorlie For personal use only • Comminution circuit suitable for gold processing after refurbishment and addition of a carbon in leach (CIL) circuit • Study fully utilises existing 2.2Mtpa process

  13. Slide 13: Black Swan Processing Hub

    Black Swan Processing Hub Existing flotation circuit and planned changes to facilitate gold production REFURBISHMENT FUTURE For personal use only SULPHIDE CIRCUIT MOTORS - VSD REFURBISHMENT OPTION GOLD CONVERSION LONG LEAD ITEMS ORDERED Au 13

  14. Slide 14: Production ramp-up

    Production ramp-up PRODUCTION Cash flow and future baseload open pit feed • Boorara stockpile 460kt (14.2koz) – a de- risked startup For personal use only • Baseload open pit feed with supplementary high grade underground sources • Early mine plan underpinned by high confidence Mineral Resources and

  15. Slide 15: Hub and Spoke Model producing 546koz in years

    Hub and Spoke Model producing 546koz in 5 years Multiple ore sources feeding into the Black Swan Processing Hub1 For personal use only BOORARA S/P & OPEN PIT BURBANKS OPEN PIT 64km 110km Years 1 – 4 106.6koz Years 2 – 5 128.8koz 48 - 80km 42 - 110km CANNON AND PENNYS U/G OTHER OPEN PIT AND U/G BLACK

  16. Slide 16: Benefits of the Black Swan refurbishment

    Benefits of the Black Swan refurbishment Faster, cheaper & lower risk For personal use only Refurbishment1 New Build2 ~$100M >$200M Cost 12 months 18 – 24 months Timeline Major approvals in place New permitting required Approvals Reduced environmental footprint Sustainability Higher future impact 1.

  17. Slide 17: Study Outcomes - Robust economic outcomes

    Study Outcomes - Robust economic outcomes Strong cash generation and financial metrics 546koz $131M maximum C1 Cost AISC For personal use only gold production LOM capital drawdown A$2,852/oz1 A$3,353/oz1 BASE PROJECT NPV8% 631.3 M Gold Price (+/- 20%) Grade (+/- 20%) Site Opex (+/- 20%) Recovery % (

  18. Slide 18: Key Milestones and Timing

    Key Milestones and Timing Pathway to gold production from Black Swan Processing Hub CY 2026 CY 2027 Area Work Streams and Deliverables Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 For personal use only Lake Johnston and Phillips Find Cash Corporate Equity Raise - A$175M + SPP Burbanks MRE Update Development & Growth Res

  19. Slide 19: Project Upside

    For personal use only Project Upside A 1.9Moz Mineral Resource1 with processing infrastructure and growth 1. Refer ASX Announcement “Gold Mineral Resources Update” dated 13 February 2026

  20. Slide 20: Burbanks high-grade underground mine

    Burbanks high-grade underground mine GROWTH High-grade ore source not included in the current Black Swan studies & LOM • Located on a granted Mining Lease For personal use only 9km south of Coolgardie, WA • Historic underground mining produced 324koz @ 22.7g/t Au • Large 465.5koz open pit and high-

  21. Slide 21: Black Swan exploration potential

    Black Swan exploration potential GROWTH Untested gold anomalies emerging adjacent to the process plant infrastructure • Previous exploration largely targeting nickel For personal use only sulphide mineralisation – only 5% of drill assays have tested for gold • Target areas adjacent to the Mt Monger

  22. Slide 22: Platform for regional consolidation

    Platform for regional consolidation GROWTH Several deposits of gold deposits in region are without a clear processing solution • Non-producer access to third party gold For personal use only processing in the Goldfields is becoming increasingly difficult • Conversion of a 2.2Mtpa processing facility

  23. Slide 23: An Emerging Standalone Gold Producer

    An Emerging Standalone Gold Producer For personal use only Clear and deliverable Combination of 1.9Moz of business plan to become Mineral Resource1 and a new standalone processing infrastructure WA gold miner Ramp up of production Studies demonstrate a aligned with strong gold robust initial five ye

  24. Slide 24: Contact Us

    For personal use only Contact Us Grant Haywood Managing Director and CEO +61 (08) 9386 9534 info@maritanaminerals.com.au maritanaminerals.com.au PO Box 1064 West Perth WA 6872

  25. Slide 25: Mineral Resource Estimate – Gold projects

    Mineral Resource1 Estimate Gold projects Project Measured Indicated Inferred Total kt Au (g/t) koz kt Au (g/t) . koz kt Au (g/t) koz kt Au (g/t) koz For personal use only Baden Powell 596 1.20 23 596 1.20 23 Boorara 753 1.21 29 6,485 1.28 266 2,549 1.26 103 9,787 1.27 398 Burbanks OP 1,430 2.02 93 3

  26. Slide 26: Ore Reserve Estimate – Gold projects

    Ore Reserve1 Estimate Gold projects For personal use only MARITANA MINERALS GOLD ORE RESERVE SUMMARY Project Cutoff Proven Probable Total Au ppm kt Au g/t Ounces kt Au g/t Ounces kt Au g/t Ounces Boorara 0.5 450 1.1 15,915 1680 1.21 65,357 2130 1.19 81,272 Cannon UG 1 135 4.1 17,700 135 4.1 17,700 P

  27. Slide 27: Mineral Resource Estimate – Nimbus silver-zinc project

    Mineral Resource1 Estimate Nimbus silver-zinc project Nimbus All Lodes (bottom cuts 12 g/t Ag, 0.5% Zn, 0.3g/t Au) For personal use only Category Mt Ag (g/t) Au (g/t) Zn (%) Ag (Moz) Au (kt) Zn (kt) Measured Resource 3.62 102 0.09 1.2 11.9 10 45 Indicated Resource 3.18 48 0.21 1.0 4.9 21 30 Inferred

  28. Slide 28: Mineral Resource & Ore Reserve disclosure

    Mineral Resource & Ore Reserve disclosure Confirmations Maritana Gold Mineral Resources The information in this report that relates to Maritana’s Mineral Resources estimates is extracted from and was originally reported in Maritana’s ASX announcements: For personal use only Project Year Confirmation

  29. Slide 29: Mineral Resource & Ore Reserve disclosure

    Mineral Resource & Ore Reserve disclosure Confirmations Non-gold Mineral Resources Competent Person Statement (Reserves) For personal use only The information is this Presentation that relates to Maritana's exploration results and Mineral Resources estimates was originally reported in Maritana's ASX