Element 25 Limited · ASX:E25

Element 25 — Investor Presentation (September 2021)

21 slides from Element 25's investor presentation, September 2021

  1. Slide 1: Investor Update – Commissioning for Growth

    Element 25 Limited Investor Update – Commissioning for Growth Building a world-class Zero Carbon Manganese™ business September 2021 - Investor Update

  2. Slide 2: Introduction

    Introduction Disclaimer Overview This presentation contains only a brief overview of Element 25 Limited and its Developing the world class Butcherbird Manganese Project in Western associated entities (“Element 25") and their respective activities and operations. The Australia to produce high quality

  3. Slide 3: Not all manganese is created equal

    Not all manganese is created equal E25 Manganese Serving the Old… And the New… • Manganese (Mn) is the fourth most used metal • The electrification of the global vehicle fleet on earth in terms of tonnage. requires vast amounts of cathode materials. • Used in steel, specialty alloys and aluminium pr

  4. Slide 4: Great infrastructure endowment, fully permitted

    Great infrastructure endowment, fully permitted Extensive Exploration Tenure E52/2350 M52/1074 Granted Mining Lease Measured & Indicated Resources are the basis Simple Logistics for the 42-year Base Case -4-

  5. Slide 5: Very simple geology equals low-cost, low environmental impact manganese units

    Very simple geology equals low-cost, low environmental impact manganese units Classification Tonnes (Mt) Mn (%) Contained Mn (Mt) RESOURCE GROWTH POTENTIAL Resource 263 10.0 20.8 • Enough resource base for multi- Reserve 50.6 10.3 5.22 decade long expansion pathway. • Can produce concentrate, batter

  6. Slide 6: Stage 1: Operational, Ramp Up Underway

    Stage 1: Operational, Ramp Up Underway • 20-year Mining Lease granted • All Stakeholder Agreements finalised Maiden • Processing water confirmed and permitted product • Fully funded with no debt shipment • Operation is fully permitted June 2021 • Stage 1 is operational • Stage 2 fully funded to prov

  7. Slide 7: Stage 1: Project Delivery Complete – Ramp Up Underway

    Stage 1: Project Delivery Complete – Ramp Up Underway Process Water Storage Tails Storage ROM Stocks Main Access Road Ore Stockpiles Processing Plant -7-

  8. Slide 8: Stage expansion turbocharging cashflows to fund HPM

    Stage 2 expansion turbocharging cashflows to fund HPM • Incremental capital required. • • Financing discussions advanced. Flowsheet process proven. Mn25 Mn25 Mn25 • Rapid deployment. 1,023,000 t/a $1.138 billion 359% • Fund High Purity Manganese Annual Production over NPV5 pre-tax IRR pre-tax 40-yea

  9. Slide 9: Stage 1: Project Delivery – E25 Concentrate in Port Hedland

    Stage 1: Project Delivery – E25 Concentrate in Port Hedland E25 Manganese Ore -9-

  10. Slide 10: New Energy Vehicle (NEV) Demand Growing MUCH Faster

    New Energy Vehicle (NEV) Demand Growing MUCH Faster Li-ion battery market development for electric vehicles 58% by 2040 percentage of new vehicles that will be EV or hybrid 54 million EV passenger sales by 2040 from 2033 decline emissions from road transport 17.6M by 2040 barrels of oil displaced by

  11. Slide 11: If not manganese, then what?

    If not manganese, then what? Global mined cobalt output (Kt) • Manganese (Mn) is the fourth most 58% by 2040 utilised metal globally. percentage of new vehicles that will be EV or hybrid 54 million • It is the cheapest, most abundant of EV passenger sales the NMC cathode materials (Ni,Mn,C). by 2040

  12. Slide 12: If not manganese, then what?

    If not manganese, then what? High manganese • VW moving to a high manganese cathode cathodes planned for most vehicles for most of its vehicles. • High manganese means better energy density and lower cost. • Requires large volumes of high purity manganese sulphate. • Element 25 is targeting this mar

  13. Slide 13: If not manganese, then what?

    If not manganese, then what? • A number of different high High manganese manganese chemistries being cathodes are preferred for the next generation of commercialised. batteries. • High manganese means better energy density and lower cost over NMC. • Positive for HPMSM demand. • Element 25 is targeti

  14. Slide 14: Element 25 Well Down the Path to HPMSM

    Element 25 Well Down the Path to HPMSM High manganese cathodes are preferred for the next generation of batteries. Mn Reference: Company ASX Release 25 August 2021 - 14 -

  15. Slide 15: Our Journey– Element 25 has a well advanced flowsheet and business strategy

    Our Journey– Element 25 has a well advanced flowsheet and business strategy… 2012 2017 2019 2020 Resource Defined First Leach Tests EMM Produced PFS Delivery 263 Mt @ 10% Mn Showed rapid selective >99.9% pure metal Early cashflow opportunity extraction 2021 2021 2022 2024/25 Operational MnSO4 Focus

  16. Slide 16: Our Goal– Zero Carbon High Purity Manganese for New Energy Vehicles

    Our Goal– Zero Carbon High Purity Manganese for New Energy Vehicles… • In Production Stage 1 First production of manganese • First Shipment concentrate to sell to steel alloy June 2021 manufacturers Stage 2 Expansion of the concentrate production to produce manganese feedstock to convert to HPMSM Pr

  17. Slide 17: Zero Carbon Manganese™ – ESG Considerations Integral to Our Thinking

    Zero Carbon Manganese™ – ESG Considerations Integral to Our Thinking Sustainable extraction Sustainable Extraction Renewable energy Low-carbon processing Fuel cell haulage Carbon offsets Zero Carbon Manganese™ Renewable Energy Other potential pathways that Element 25 is investigating: Powered Proces

  18. Slide 18: Our Journey…

    Our Journey… Stage 1 Stage 2 Stage 3 Stage 4 $583 million NPV $1.14 billion NPV High Purity Mn Decarbonise Commissioning and ramp- PFS study complete, PFS study anticipated Global benchmark for up underway startup 2022 for completion 2021 Zero Carbon Manganese™ 9 month plan 1.5 year plan 5 year plan

  19. Slide 19: Thank you

    Thank you For more information, please contact Element 25 Limited: +61 8 6315 1400 admin@e25.com.au www.element25.com.au

  20. Slide 20: Reserves and Resources

    Reserves and Resources Maiden Ore Reserve1 Category Tonnes (Mt) Mn (%) Contained Mn (Mt) • 89% conversion of measured Proved 14.4 11.5 1.65 and indicated resources to Probable 36.2 9.8 3.56 reserve. Total 50.6 10.3 5.22 • Maiden Reserve only exploits Global Mineral Resource2 approximately 20% of glo

  21. Slide 21: Competent Person’s Statement

    Competent Person’s Statement The information in this presentation that relates to Exploration Results is based on information compiled by Mr Justin Brown who is a full-time employee of the Company and is a member of the Australasian Institute of Mining and Metallurgy. Justin Brown has sufficient exp

Element 25 — Investor Presentation (September 2021) on 6ix