Revolver Resources Holdings Ltd · ASX:RRR

Revolver Resources — Investor Presentation (September 2021)

24 slides from Revolver Resources's investor presentation, Sep 22, 2021

  1. Slide 1: Revolver Resources Company Presentation

    REVOLVER RESOURCES COMPANY PRESENTATION Pat Williams Managing Director September 2021

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer Forward-looking statements Revolver Resources Pty Ltd (ACN 622 996 294) (Revolver or the Company) is the issuer of this presentation. The issue of this presentation is intended only for the person or entity to which it has been transmitted. This presentation may conta

  3. Slide 3: Company profile: resourcing the world's electric revolution

    Company profile Revolver Resources is on target with our high grade, low-cost, world class copper plays. Our projects, are located in premier polymetallic We’re resourcing producing jurisdictions, Mt Isa Minerals Province and the Hodgkinson Province in Northern the world’s Queensland. electric revol

  4. Slide 4: Investment highlights

    Investment highlights Two 100% owned, potential world class copper projects in Queensland’s leading mineral provinces, one with the highest 63,758t mined direct shipped ore grade copper deposit mined in Australia, at an average grade of 22.7% Cu. with remaining VMS orebody, and one with Mt Isa style

  5. Slide 5: Major investments in exploration of two advanced copper projects

    Major investments in exploration of two advanced world class copper projects over the past five years: Dianne Copper Mine One of the highest-grade copper mines in the world - 63,758 tonnes of direct shipped ore with an average grade of 22.7 % copper (1979-83). Existing orebody, no previous drillhole

  6. Slide 6: Highly Experienced Board and Management

    Highly Experienced Board and Management Pat Williams Paul McKenna Brian McDonald Managing Director Executive Chairman Non-Executive Director Pat Williams has worked in the global resources business Paul has over 30 years in technical, commercial and Brian is a professional engineer, and a highly exp

  7. Slide 7: Dianne Project

    DIANNE PROJECT UNLOCKING VALUE FROM ONE OF AUSTRALIA’S HIGHEST GRADE, LOWEST COST COPPER ASSETS

  8. Slide 8: The Dianne Copper Mine produced 63,758t of direct shipped ore

    The Dianne Copper Mine produced 63,758t of direct shipped ore at average grade of 22.7% Cu from open cut and underground operations between 1979 and 1983. • Granted active mining leases. • Recent drilling program undertaken in 2020 confirms orebody definition. Commercial in confidence • Exploration

  9. Slide 9: Copper grades in excess of 4% recorded in 2020 drilling

    Copper grades in excess of 4% were recorded in 2020 drilling. Four 120m RC holes were drilled in January 2020. Each of the holes successfully intersected the modelled orebody, mostly in the Green Hill mineralisation zone. This brief confirmatory drilling program has provided reliable calibration of

  10. Slide 10: Location

    Location The Dianne Project is located in the prolific polymetallic Palmer River region of the Hodgkinson Province, 260km from Cairns. The compact and high grade nature of the known mineralisation Mount Malloy (Cu) at Dianne presents Commercial in confidence the proven potential for one of the world

  11. Slide 11: Region surrounding Dianne Mine yet to see modern exploration

    The region surrounding the Dianne Mine is yet to be subjected to modern exploration techniques providing significant potential future opportunities for Revolver. The area surrounding the Dianne Mine is covered by EPM 25941, that Revolver has a 100% interest in, holds significant potential for discov

  12. Slide 12: Cross sections: historical, recent and planned drill holes

    Cross sections A-AA looking grid north local grid Historical drilling, recent and planned drill holes Cross section B – BB looking grid north local grid Independent Geologist’s Report, Competent Person considers that significant potential exists on the project Commercial in confidence tenements for

  13. Slide 13: 3D model of proposed drillhole traces

    3D model of proposed drillhole traces of the existing Dianne copper deposit. Proposed drillhole traces Commercial in confidence Massive sulphide Zone Green Hill Zone Eastern Zone 13

  14. Slide 14: Multiple pathways to significant near term growth

    Multiple pathways exist to generate significant near term growth: • Establish JORC resource for existing orebody • Large upside potential of existing orebody, as no previous drillholes below 165m depth from ground level. • Explore for repeats and extensions of existing orebody on ML’s and EPM • A de

  15. Slide 15: Project Osprey

    PROJECT OSPREY TARGETING MOUNT ISA STYLE COPPER DEPOSITS IN A WORLD CLASS MINERALS PROVINCE

  16. Slide 16: North West Minerals Province

    Project Osprey is located within the North West Minerals Province 220km north of Mount Isa. World-class mines in the region include Mt Isa Copper Mine, George Fisher/Hilton Copper Mine, Century Zinc Mine as well as the Mount Gordon deposits – Mammoth, Commercial in confidence Esperanza and Esperanza

  17. Slide 17: Targeting Mt Isa style copper mineralisation

    Revolver is targeting Mt Isa style copper mineralisation within a number of already identified zones. • The re-interpretation of the regional geology achieved by using gravity, magnetic, and drilling data has shown the geological targets occupy the (faulted) contacts of the basaltic basement with se

  18. Slide 18: Previous owners

    Previous owners 1970s 1983 - 1993 2000 - 2004 2015 - present Newmont/CRA Western Mining Corp BHP Commercial in confidence 1997 - 2000 2010 - 2015 1980 - 83 Shell Anglo American XDM Resources 18

  19. Slide 19: Significant in-ground exploration expenditure since 2016

    Significant direct in-ground exploration expenditure by Revolver since 2016. Geophysics Geophysics Diamond drilling Geophysics June 2019 2017 August 2019 2016 (gravity/magnetics) (gravity/magnetics) 3,000m (electromagnetic survey) Commercial in confidence January 2020 July 2019 2017 2018 Diamond dri

  20. Slide 20: IP survey and fixed loop EM survey results

    Induced A notable conductor was polarisation (IP) survey detected in the vicinity Fixed Loop EM Survey of existing IP Line 5. Commercial in confidence Significant IP anomaly detected and preliminary model outlining location/ scale on IP Line 5. 20 Line 5

  21. Slide 21: Regional Enabling Infrastructure

    Regional Enabling Infrastructure • The Mt Isa copper smelter owned by Glencore Australia has a processing capacity of 300,000tpa. The Mt Isa operations process approximately 6.5Mtpa of ore. The project is Australia's second largest copper producer. • The Townsville Copper Refinery (CRL) refines up t

  22. Slide 22: Risk factors

    Risk factors This section identifies the areas that the directors regard as the major risks associated with an investment in the Company is exposed to the fluctuations and volatility of the rate of exchange between the United States dollar and Company. Investors should be aware that an investment in

  23. Slide 23: Risk factors

    Risk factors RELIANCE ON KEY PERSONNEL CLIMATE CHANGE RISKS The Company is reliant on a number of key personnel and consultants, including members of its board of directors. Climate change is a risk the Company has considered, particularly related to its operations in the mining industry. The The lo

  24. Slide 24: Contact us

    Contact us Pat Williams Managing Director Revolver Resource Holdings Limited E: hello@revolverresources.com.au Revolver Resource Holdings Limited Level 23, 240 Queen Street, Commercial in confidence Brisbane QLD 4000, Australia www.revolverresources.com.au 24

Revolver Resources — Investor Presentation (September 2021) on 6ix