Revolver Resources Holdings Ltd · ASX:RRR
Revolver Resources — Investor Presentation (September 2021)
24 slides from Revolver Resources's investor presentation, Sep 22, 2021
Slide 1: Revolver Resources Company Presentation
REVOLVER RESOURCES COMPANY PRESENTATION Pat Williams Managing Director September 2021
Slide 2: Important Notice and Disclaimer
Important Notice and Disclaimer Forward-looking statements Revolver Resources Pty Ltd (ACN 622 996 294) (Revolver or the Company) is the issuer of this presentation. The issue of this presentation is intended only for the person or entity to which it has been transmitted. This presentation may conta
Slide 3: Company profile: resourcing the world's electric revolution
Company profile Revolver Resources is on target with our high grade, low-cost, world class copper plays. Our projects, are located in premier polymetallic We’re resourcing producing jurisdictions, Mt Isa Minerals Province and the Hodgkinson Province in Northern the world’s Queensland. electric revol
Slide 4: Investment highlights
Investment highlights Two 100% owned, potential world class copper projects in Queensland’s leading mineral provinces, one with the highest 63,758t mined direct shipped ore grade copper deposit mined in Australia, at an average grade of 22.7% Cu. with remaining VMS orebody, and one with Mt Isa style
Slide 5: Major investments in exploration of two advanced copper projects
Major investments in exploration of two advanced world class copper projects over the past five years: Dianne Copper Mine One of the highest-grade copper mines in the world - 63,758 tonnes of direct shipped ore with an average grade of 22.7 % copper (1979-83). Existing orebody, no previous drillhole
Slide 6: Highly Experienced Board and Management
Highly Experienced Board and Management Pat Williams Paul McKenna Brian McDonald Managing Director Executive Chairman Non-Executive Director Pat Williams has worked in the global resources business Paul has over 30 years in technical, commercial and Brian is a professional engineer, and a highly exp
Slide 7: Dianne Project
DIANNE PROJECT UNLOCKING VALUE FROM ONE OF AUSTRALIA’S HIGHEST GRADE, LOWEST COST COPPER ASSETS
Slide 8: The Dianne Copper Mine produced 63,758t of direct shipped ore
The Dianne Copper Mine produced 63,758t of direct shipped ore at average grade of 22.7% Cu from open cut and underground operations between 1979 and 1983. • Granted active mining leases. • Recent drilling program undertaken in 2020 confirms orebody definition. Commercial in confidence • Exploration
Slide 9: Copper grades in excess of 4% recorded in 2020 drilling
Copper grades in excess of 4% were recorded in 2020 drilling. Four 120m RC holes were drilled in January 2020. Each of the holes successfully intersected the modelled orebody, mostly in the Green Hill mineralisation zone. This brief confirmatory drilling program has provided reliable calibration of
Slide 10: Location
Location The Dianne Project is located in the prolific polymetallic Palmer River region of the Hodgkinson Province, 260km from Cairns. The compact and high grade nature of the known mineralisation Mount Malloy (Cu) at Dianne presents Commercial in confidence the proven potential for one of the world
Slide 11: Region surrounding Dianne Mine yet to see modern exploration
The region surrounding the Dianne Mine is yet to be subjected to modern exploration techniques providing significant potential future opportunities for Revolver. The area surrounding the Dianne Mine is covered by EPM 25941, that Revolver has a 100% interest in, holds significant potential for discov
Slide 12: Cross sections: historical, recent and planned drill holes
Cross sections A-AA looking grid north local grid Historical drilling, recent and planned drill holes Cross section B – BB looking grid north local grid Independent Geologist’s Report, Competent Person considers that significant potential exists on the project Commercial in confidence tenements for
Slide 13: 3D model of proposed drillhole traces
3D model of proposed drillhole traces of the existing Dianne copper deposit. Proposed drillhole traces Commercial in confidence Massive sulphide Zone Green Hill Zone Eastern Zone 13
Slide 14: Multiple pathways to significant near term growth
Multiple pathways exist to generate significant near term growth: • Establish JORC resource for existing orebody • Large upside potential of existing orebody, as no previous drillholes below 165m depth from ground level. • Explore for repeats and extensions of existing orebody on ML’s and EPM • A de
Slide 15: Project Osprey
PROJECT OSPREY TARGETING MOUNT ISA STYLE COPPER DEPOSITS IN A WORLD CLASS MINERALS PROVINCE
Slide 16: North West Minerals Province
Project Osprey is located within the North West Minerals Province 220km north of Mount Isa. World-class mines in the region include Mt Isa Copper Mine, George Fisher/Hilton Copper Mine, Century Zinc Mine as well as the Mount Gordon deposits – Mammoth, Commercial in confidence Esperanza and Esperanza
Slide 17: Targeting Mt Isa style copper mineralisation
Revolver is targeting Mt Isa style copper mineralisation within a number of already identified zones. • The re-interpretation of the regional geology achieved by using gravity, magnetic, and drilling data has shown the geological targets occupy the (faulted) contacts of the basaltic basement with se
Slide 18: Previous owners
Previous owners 1970s 1983 - 1993 2000 - 2004 2015 - present Newmont/CRA Western Mining Corp BHP Commercial in confidence 1997 - 2000 2010 - 2015 1980 - 83 Shell Anglo American XDM Resources 18
Slide 19: Significant in-ground exploration expenditure since 2016
Significant direct in-ground exploration expenditure by Revolver since 2016. Geophysics Geophysics Diamond drilling Geophysics June 2019 2017 August 2019 2016 (gravity/magnetics) (gravity/magnetics) 3,000m (electromagnetic survey) Commercial in confidence January 2020 July 2019 2017 2018 Diamond dri
Slide 20: IP survey and fixed loop EM survey results
Induced A notable conductor was polarisation (IP) survey detected in the vicinity Fixed Loop EM Survey of existing IP Line 5. Commercial in confidence Significant IP anomaly detected and preliminary model outlining location/ scale on IP Line 5. 20 Line 5
Slide 21: Regional Enabling Infrastructure
Regional Enabling Infrastructure • The Mt Isa copper smelter owned by Glencore Australia has a processing capacity of 300,000tpa. The Mt Isa operations process approximately 6.5Mtpa of ore. The project is Australia's second largest copper producer. • The Townsville Copper Refinery (CRL) refines up t
Slide 22: Risk factors
Risk factors This section identifies the areas that the directors regard as the major risks associated with an investment in the Company is exposed to the fluctuations and volatility of the rate of exchange between the United States dollar and Company. Investors should be aware that an investment in
Slide 23: Risk factors
Risk factors RELIANCE ON KEY PERSONNEL CLIMATE CHANGE RISKS The Company is reliant on a number of key personnel and consultants, including members of its board of directors. Climate change is a risk the Company has considered, particularly related to its operations in the mining industry. The The lo
Slide 24: Contact us
Contact us Pat Williams Managing Director Revolver Resource Holdings Limited E: hello@revolverresources.com.au Revolver Resource Holdings Limited Level 23, 240 Queen Street, Commercial in confidence Brisbane QLD 4000, Australia www.revolverresources.com.au 24
Revolver Resources — Investor Presentation (September 2021) on 6ix