  1. Slide 1: April 2003

    4 April 2003 -

  2. Slide 2: Presentation outline

    Presentation outline * Introduction * Aircraft maintenance « MRO Industry « Air New Zealand’s Engineering Operations « Airframes « Engines « Components « Tech Services « Safe Air ° TAE Financial Performance Strategic direction fe. ow AIR. NEW ZEALAND 2 2

  3. Slide 3: Transparency of operations

    Transparency of operations Operating Stats Engineering Detailed fuel | Engineering SA ’ splitby domestic performance hedging Services fo and international disclosed disclosure Investor day | Lo AIR. NEW ZEALAND

  4. Slide 4: Portfolio of inter-related businesses

    Portfolio of inter-related businesses for focus & value maximisation AIR. NEW ZEALAND

  5. Slide 5: Portfolio of businesses (cont.)

    Portfolio of businesses (cont.) Value Creating lilustrative Only Defend and Grow A ©) Terminal Services Express Class ..w Estimated WACC . ir NZ Engineering Freedom Air Services (ANZES) [ei at 0 - 6 Asset Intensity Oo International é -Nalue Destroying Vv Improve Performance or Reduce Exposure Capita

  6. Slide 6: ANZES contributes 17% to Group EBIT

    ANZES contributes 17% to Group EBIT - Dec 02 Illustrative Only Terminal Services L2. & AIR. NEW ZEALAND

  7. Slide 7: Air New Zealand and ANZES

    Air New Zealand and ANZES Businesses in transition with separate but complementary strategies Past Present Future > Brand Manager \, Suite of airlines \ semen — - t hn ET Service I nn [ers i en a VBA Plus \ VBA Strategies always linked by Brand Value, Safety and Operational Integrity

  8. Slide 8: Separate strategies require evolution of relationship

    Separate strategies require evolution of relationship Air NZ Ltd as an owner of ANZES Air NZ Airlines as a customer of * Governance ANZES » Resources . Customer focus * Brand * Quality * Clean interface » Functional Support L2. & AIR. NEW ZEALAND

  9. Slide 9: Aircraft Maintenance

    Aircraft Maintenance

  10. Slide 10: Aircraft maintenance principles

    Aircraft maintenance principles « Aircraft are maintained on an Approved Maintenance Schedule which includes: * regular servicing * inspection * repair/restoration sufficient to maintain safe flight & inherent reliability « Modern aircraft are not generally “overhauled” but their condition is assess

  11. Slide 11: Aircraft maintenance principles (cont.)

    Aircraft maintenance principles(cont.) « Components are generally maintained based on their condition, then swapped for serviceable ones when faulty and repaired in the workshops. * The Engine is the largest and most expensive component and has a maintenance schedule of its own involving: * monitori

  12. Slide 12: Aircraft Maintenance System

    Aircraft Maintenance System * Operating conditions and schedules differ substantially between long-haul and short-haul fleets. * Hours, cycles, calendar time all in equation « Sophisticated planning systems are required to track maintenance requirements « 2500 components on a 747 - all individually

  13. Slide 13: Illustrative maintenance schedule

    Illustrative maintenance schedule 14MARO3 Air New Zealand Engineering Services Illustrative Only OctO3 - Apro4 AKL AIC Maintenance Plan - 12 Month a rar Act ID oc toBEr NOvEMEEL le oecemseR I anuany FewAUARY ee a is ey F : ri i i IF Ps ee i me a ES E is [es i E ERGO ta RIOD 0 RIOD & PERIOD G7 ka PER

  14. Slide 14: Letter Checks

    Letter Checks « “A” check: routine servicing & rectification while still in service « “B” Check: more detailed servicing & rectification while still in service « “C” Check: inspection that includes: * testing of major aircraft systems * restoration of cabin interiors e structural inspections * all l

  15. Slide 15: MRO Industry

    MRO Industry Tone a ie Pa

  16. Slide 16: Moving from captive to competitive environment

    Moving from captive to competitive environment Airline Industry 1870-early 1980’s Acceleration Capacity grows. >200 new entrants Late 1980’s Hyper- competition Excess capacity 1990’s Consolidation Distressed carriers taken over or 2000’s September 11 Excess capacity becomes severe New positions beco

  17. Slide 17: MRO industry players

    MRO industry players Supplier/Customer Relationship ae! i { { Airline OEMs | Engineering i | Divisions. { ! t } ' ep i Price setters : Proprietary knowledge Life-cycle management Price setters Total support Airline backing a Pricing Squeeze r / Airline a , Pricing Squeeze ra Spin-off | | a | “ | “ i

  18. Slide 18: MRO's operate in an attractive industry

    MRO’s operate in an attractive industry 60+ 50 40 30 UD billion 20 10 0 2001 2007 2012 @ Airframe Maintenance g Engines Oo Components o Line Maintenance

  19. Slide 19: MRO providers by revenue

    ebro guy et SB) COUR USQUIELH] EPMIEE) paeuors SESES Woytg ny urdep ey Bl sfensy yy Sal oa oogvH Soc af coupareunes SSE] SUSY EPIRA, SE ONL ays SEY cor ts0l8y E14 SES Fuuafios- Song epee ity (rubs pay Sey SEED) ‘WYOLIDOOK) seomag eulteug SSE] f2u - only includes players for suesuBuy)S Sf sys soruueU

  20. Slide 20: MRO Key Product Lines

    MRO Key Product Lines AIRFRAMES Features « Airline dominance » Labour intensive (80*% of repair value) « Turn-times & burn-rates « Workflow / scale « Specific skills, not easily commoditised. Size » US$14-16B Independent 1% ENGINES Features « Supplier (OEM) power « Parts intensive (70°% of repair va

  21. Slide 21: MRO Key Product Lines (cont.)

    MRO Key Product Lines (cont.) Features « Many parts | Independont i 5Y% « Expensive test equipment + Increasing reliability « Centres of excellence COMPONENTS Size » US$8-9B Features » Low capital > IP heavy » High margin labour TECH SERVICES ‘Ilectual property Independent 1%

  22. Slide 22: Global Trends in MRO industry

    Global Trends in MRO industry é Increase in demand for 3rd party MRO work ® Expansion into new markets @ Centres of Excellence Strength and Speed |. @ Consolidation ° L2. & AIR. NEW ZEALAND

  23. Slide 23: Engineering Operations

    Engineering Operations Ly a eg eee : iG / es ' | 7 LD LU ae Ly ue : : i, ee Ie Le ee Lo es i Os Qo

  24. Slide 24: Engineering operations in NZ & Australia

    Engineering operations in NZ & Australia NZES CHC Base © Sate Air L2. & AIR. NEW ZEALAND

  25. Slide 25: Engineering capability

    Engineering capability Airframes OAMNZY} Engines Components Tech Services RR DART. B747 " CF6-B0A/C2 * Avionics Operator services B?767 * RB211-524D4/G3 |, Composites Design | Auckland B737 © LM2500 * EI in ti Production SAP B727 " LMs000 . Mechanical Support (Repair Manufacturing "PA O4, so chemes)

  26. Slide 26: Manpower

    Manpower ANZES AKL © ANZES CHC Safe TAE Link i iP 100 100 400 700 1200 Le. Lc 2.9 million productive man hours AIR NEW ZEALAND

  27. Slide 27: Fully integrated IT system - SAP

    Fully integrated IT system - SAP » SAP Functionality - On-Line Help - Human resource mgt - Business Process y - AOP’s L2. & AIR. NEW ZEALAND

  28. Slide 28: Global customer base

    Global customer base sx ® Aircraft ® Marine & Industrial a Northwest ichwen Airlines acuse University Paso Huston ‘O@Air Tran gpormatecch Power Solutions Brown & Root ” Tractebel San Gabriel Tescrog, Aloha Berakas Power Brunei om PNG Electricity 30% ie Commissio! 1 ite Air Pacific 25% Fansalla Energ

  29. Slide 29: Slide 29

  30. Slide 30: Commercial airframes capability

    Commercial airframes capability Air NZ Operating Fleet 747-400 B767-200,-300 767-300 767-200 3 B727,B737 -200,-300, NGs_| 737-300 19 ATR72 9 SAAB340 16 BAE 146 Beech 1900 16 ATR72 & 46 ; £2. Link engineering: Beech 1900, Metroliners, SAAB340 Lc AIR. NEW ZEALAND

  31. Slide 31: Core capability in Boeing offers significant opportunities

    Core capability in Boeing offers significant opportunities 1200 1103 1000 800 600 400 200 # Asia/Pacific

  32. Slide 32: ANZES will acquire Airbus capability

    ANZES will acquire Airbus capability * Air NZ has purchased 15 A320’s with a further option over 20 Airbus aircraft » Airbus fleet is expected to continue to grown in the Asia Pacific region 900 800 700 600 500 400 815 fod Oo _ Oo Oo 2 a q S = oS oD CF oF ive) oD oF < < < < < < © Asia/Pacific © Worl

  33. Slide 33: Core military airframe capability

    Core military airframe capability « C-130 - Hercules « P-3 - Orion « UH1H - lroquois « A4 - Skyhawk * Macchi 339 « Seasprite

  34. Slide 34: Range of services provided

    Range of services provided ue All letter checks 747/767 Strut Ageing aircraft work Structural repairs Modifications Reconfigurations, Manufacturing Aircraft repaints IFE installation interior refurbishment Avionics installed L2. & AIR. NEW ZEALAND

  35. Slide 35: Airframes is a labour business

    Airframes is a labour business Illustrative Only Materials Cost of Manuf.: OEM’s Margin: Maint Margin : Labour Cost: 80% Maint Margin: 20% Labour Labour Cost: Maint Margin: Assets as at 31 Dec 02: WIP Debtors Facilities & Plant Materials Labour Cost: 80% Maint Margin: 20% 40% 40% 20% AIR. NEW ZEALAN

  36. Slide 36: Primary market is Asia Pacific

    Primary market is Asia Pacific Primary Market Secondary Market

  37. Slide 37: Internal - External work split

    Internal - External work split Auckland Christchurch Internal (FY02 manhrs) 70% 45% External (FY02 manhrs) 30% 55% Recent Customers: « Qantas * Air Canda « AWAS * China Northern « Air Canada * China Yunnan « Virgin Atlantic * RNZAF « Cathay Pacific « Virgin Blue « DHL Express * AWAS ¢ LOT-Polish * A

  38. Slide 38: Proposed capacity growth

    Proposed capacity growth Productive Hrs (m) Qo ao f Current Capacity Proposed Capacity Limitations to Growth: Availability of skilled labour and facility constraints (long term) £2. & AIR. NEW ZEALAND

  39. Slide 39: yy LD

    ea oe ee ee oe. yy LD ie LD a Bia i Si He ee oe is Pie? Coe Pe ee Le Latins us : oe ee oe ye Hein

  40. Slide 40: Engine industry life cycle

    Engine industry life cycle OEMs OEMs AIR. NEW ZEALAND

  41. Slide 41: OEMs dominate the design, production and after market

    OEMs dominate the design, production and after market GEES MTU @ = Rolls Royce @ Pratt & Whitney OEM’s MRO Market share: GEES - 30% Rolls Royce- 15% £2. Pratt & Whitney - 15% o AIR. NEW ZEALAND

  42. Slide 42: ANZES engines capability

    ANZES engines capability Aircraft Engine Division Marine & Industrial Engine Division » GE LM2500 » GE LM5000 : GE CF6-80A2 (B767-200) : GE CF6-80C2 (B767-300, B747-400) * GE F404 (F18 Hornet) * RR RB211-524/G3 (B747-400) Christchurch Engine Centre (P&W 51%) * P&W JT8D * RR Dart » IAE V2500 (A319, A

  43. Slide 43: Engines is a 30% Labour & 70% materials business

    Engines is a 30% Labour & 70% materials business Illustrative Only Labour Cost: 80% : . Labour Cost: 80% Maint Margin: 20% Maint Margin: 20% Labour Materials Repairs Labour Cost: 80% Cost of Manuf.: 40% Repair agency's charge 90% Maint Margin: 20% OEM's Margin: 40% Maint Margin 10% Maint Margin : 20

  44. Slide 44: Wide secondary market as engines can be freighted all over the world

    Wide secondary market as engines can be freighted all over the world Engines’ : Primary Market Engines’ Secondary Market

  45. Slide 45: Internal - External work split

    Internal - External work split Auckland CEC JV Internal (FY02 manhrs) 50% External (FY02 manhrs) 50% 400% Recent Customers: « Elpaso * Emery « RAAF * FEDEX « Royal Australian * Independent Air Freighters « Navy * Kittyhawk Air Cargo * Air Pacific « Midwest Express * AWAS * Pacific Air Express * Garu

  46. Slide 46: Niche market - Marine & Industrial turbines

    Niche market - Marine & Industrial turbines 2 100% third party work Current capability: « LM2500 (All base models & power turbines) * LM5000 (All models) « LM6000 Field Service and support « Comprehensive Component repair capability 2 2 Long term relationships (Elpaso) 2 New product options: * LM600

  47. Slide 47: Christchurch Engine Centre

    Christchurch Engine Centre * Partnership between Pratt & Whitney (51%) and Air New Zealand Ltd (49%) « The JV was launched in April 2001 when Air NZ sold 51% for US$18m « CEC has 300 staff % Pratt & Whitney € ‘AUnitad Weohnotoglas Company AIR NEW ZEALAND i : ic Christchurch Engine Centre Se AIR. NEW

  48. Slide 48: Christchurch Engine Centre (cont.)

    Christchurch Engine Centre (cont.) * Capability: ° P&W JT8D-Std ¢ JT8D-200 turbofan engines «RR DART turboprop engines ° IAE V2500 turbofans from mid 2004 * Production - 100 JT8D engines per year, plus 65 Darts per year (95 in 2002) * [AE V2500 line supported by Air N2Z’s selection of V2500 engines

  49. Slide 49: Components

    Components

  50. Slide 50: Components offers a range of products

    Components offers a range of products « Avionics Repairs « Composite Repairs * Mechanical repairs L2. & AIR. NEW ZEALAND

  51. Slide 51: Components is a 40% labour & 60% materials business

    Components is a 40% labour & 60% materials business Illustrative Only Disassemble, Reps? Labour Cost: 80% Labour Cost: 80% Maint Margin: 20% Maint Margin: 20% Labour Materials Labour Cost: 80% Cost of Manuf.: 40% Maint Margin: 20% OEM’s Margin: 40% Maint Margin: 20% Assets as at 31 Dec 02: $32m WIP

  52. Slide 52: Strategic alliances with OEM's have extended market reach

    Strategic alliances with OEM’s have extended market reach Strategic Alliance with Rockwell Collins Strategic Alliance with ACSS

  53. Slide 53: Internal - External work split

    Internal - External work split Auckland Christchurch Internal (FY02 manhrs) 80% 55% External (FY02 manhrs) 20% 45% Recent Customers: « ACSS * RAAF » Qantas * RNZAF « Cathay « AWAS « RNZAF *« SAAB * Rockwell ¢ Airwork L2. & AIR. NEW ZEALAND

  54. Slide 54: Le a S : o _ yy i ae Lo ay ae DD _

    Le a S : o _ yy i ae Lo ay ae DD _ ve

  55. Slide 55: Tech Services capability

    Tech Services capability * Design services * Operator service * Design for manufacturing « Production services

  56. Slide 56: Tech services is a labour & IP business

    Tech services is a labour & IP business Iltustrative Only requirement Labour Intellectual Property . Create Intellectual Property 55% Labour Cost: 60% s . Maint Margin: 40% Maint Margin 45% Resell to subsequent Customers at market rates Assets as at 31 Dec 02: $4.2m WIP $3m Debtors $1im £2. Faciliti

  57. Slide 57: Technical has world-wide reach

    Technical has world-wide reach Technical ” , RAAF, RNZAF, GECAS

  58. Slide 58: ANZES Technical has significant growth potential

    ANZES Technical has significant growth potential * 30% of man hours on external contracts ° Existing infrastructure, IP and systems (SAP) * Low marginal cost for incremental customers » Low capital requirements as intellectual property business L2. & AIR. NEW ZEALAND

  59. Slide 59: Safe Air

    . : Ir Safe A

  60. Slide 60: Safe Air profile

    Safe Air profile ° Located at Blenheim’s Woodburne airfield ° 3 hangers * engine overhaul facility * test cell * propeller overhaul facility (largest in southern hemisphere) * Safe Air owns and operates AirProp services propeller overhaul maintenance facility at Moorabbin Airport (Victoria Australia

  61. Slide 61: A one stop shop for medium sized military & civil aircraft

    A one stop shop for medium sized mary & civil aircraft « C130 —® P&W J52- |» Safe Air has + Safe Air Hercules — P8BIC | extensive provide design - HS748 _* RR Viper _ capability for and + BAE 146 680-43 the design | consultancy - A4Skyhawk = * RR Allison | manufacture —_—_ services > Kaman SH26 | T5

  62. Slide 62: 90+% man-hours on external work

    90+% man-hours on external work Large customers have included: e RNZAF RAAF Kaman Aerospace (US) Advanced training system Philippines Air Force BAE Systems Tenix Defence Dowty Aerospace propellers Trans Asia Airways Armada de Chile Awpost L2. & AIR. NEW ZEALAND

  63. Slide 63: fi Bic

    fi Bic ie We a a ce y in

  64. Slide 64: Australian engineering operations

    Australian engineering operations * Two sites - Amberley (QLD) and Richmond (NSW) * 100+ staff in Australia - significant growth opportunities « Capabilities « airframe, engine & component MRO « aircraft and support equipment design * aircraft corrosion control and painting L2. & AIR. NEW ZEALAND

  65. Slide 65: Australian Defence Force (ADF) focus

    Australian Defence Force (ADF) focus ¢ Three long term ADF maintenance contract - 8 years + * Support for: «F111 ° F/A-18 * C-130 «P3 * B707 * Chinook * Blackhawk * Seahawk 12 a AIR. NEW ZEALAND * Sea King

  66. Slide 66: Illustrative Example

    Illustrative Example i ae hein , ie ea toy a LD : ae a : e Ls

  67. Slide 67: ZK-NBC: a major project

    ZK-NBC: a major project cl ie AIR. NEW ZEALAND

  68. Slide 68: Assessment of ZK-NBC

    Assessment of ZK-NBC « Production team sent out to secure aircraft * Tech Services team sent to BNE to assess damage and prepare evaluation of repair * Report sent to Boeing ® Boeing approved evaluation report ° Repairs commenced L2. & AIR. NEW ZEALAND

  69. Slide 69: Multiple stakeholders in any incident

    Multiple stakeholders in any incident OEM Manufacturer Task Manufacturer Maintenance id Cards i Maintenance Planning Manual Data Manufacturer Regulatory Review Board Service Letters Requirements & Recommendations Operators Regulatory t Authority Repetitive Requirements Operator generated RMT’s # ¢ H

  70. Slide 70: Project involved a number of different areas

    Project involved a number of different areas Scope of work * Leading edge repair « Slat replacement « Wing repairs « L/H pylon replacement * L/H and R/H engine replacement Time * 3 months * 4000 man-hours « 60 tradespeople and support Le. LC AIR. NEW ZEALAND

  71. Slide 71: The Result

    The Result L2. & AIR. NEW ZEALAND

  72. Slide 72: Performance

    Performance a ; a

  73. Slide 73: Stability in earnings

    Stability in earnings 30000 5 25000 +4 20000 + 15000 + EBIT ($000) 10000 + 5000 + 6 mths to Dec 01 6 mths to Jun 02 6 mths to Dec 02 fo & AIR. NEW ZEALAND

  74. Slide 74: FY02 performance in a portfolio context

    FYO2 performance in a portfolio context liltustrative only Value Creating . Ove and Grow rech Services Orne 35% 30% 25% @ any, | Sa Airframes AKL 45% {—Aictomes cHe _ : Estimated WACC Return on Assets 40% Engines AKL components AKL ngines 5% 0% [Components CHC 5% ~10% “15% =, Value Destroying 20% Im

  75. Slide 75: Performance forecast shows improvement

    Performance forecast shows l mM p roveme nt liltustrative only +» Value Creating t % Defend and Grow Fach Services 35% | Our. ° . 30% Sate Air © 25% r) Airframes Aki 10% | Compgnents Akl : . Airframes CHC . 15% — Estimated WACC Return on Assets Components CHC nO 10% ma Engines Akl 5% ow 5% 10% “15%

  76. Slide 76: $500m in assets (excl. CEC)

    $500m in assets (excl. CEC) —__ Assets by product line Assets by type Materials Components $32m Tag | |_Tech Services £2. $4m $4m ‘S AIR. NEW ZEALAND

  77. Slide 77: Strategic Direction

    Strategic Direction

  78. Slide 78: ANZES' businesses are at different stages in a value maturity cycle

    ANZES’ businesses are at different stages in a value maturity cycle Illustrative only Value Value Marine & industrial ) Airframes Technical Services Time Time Challenge for management is to bring new life to the value cycle, or harvest the value

  79. Slide 79: Retaining operational integrity is core to growth

    Retaining operational integrity is core to growth * Reputation and value growth depend on excellence and integrity Recent Air New Zealand incidents have questioned performance * normalised for flight hours, the rate is not abnormal e * however - questions are rightly raised is this a leading indicat

  80. Slide 80: ANZES will grow value by deploying competencies into attractive markets

    ANZES will grow value by deploying competencies into attractive markets « Current competencies are derived from past strategies and have served ANZES and Air New Zealand well « Future value growth will derive from: * maximising value from current markets and customers ¢ leveraging competencies into

  81. Slide 81: Growth is considered on three horizons

  82. Slide 82: Horizon 1: Do more with what we've got

  83. Slide 83: Horizon 1 is not opportunity constrained

  84. Slide 84: Horizon 2: Extend the platform

  85. Slide 85: H3: Find the future

  86. Slide 86: Slide 86