Ireland — Investor Presentation (October 2008)
16 slides from Ireland's investor presentation, Oct 6, 2008

Slide 1: Build Ireland (IRLD) into a significant mid-tier mining company
Build Ireland (IRLD) into a significant mid-tier mining company IRLD has two precious metal projects with significant potential Columbus Project - Acquired 100% Gold / Silver / Calcium Carbonate Red Mountain Project – Option to buy 100% Gold / Tungsten / Silver Develop culture of managing expectatio

Slide 2: Columbus Project Mill-site Facility
Columbus Project Mill-site Facility Columbus Project Gold, Silver and Calcium Carbonate Project At surface of a dry lake bed Mine Site Production permit has been granted Short Production Horizon Location

Slide 3: The Columbus Project
The Columbus Project is located ~ halfway between Las Vegas and Reno, ~52 miles west of Tonopah, Nevada, USA. The Project is specifically located over the Columbus Salt Marsh in Esmeralda County, Nevada. Regional History

Slide 4: Columbus Project is in a mineralized area
Columbus Project is in a mineralized area : Candelaria Mine (Silver) * Original Claims in 1860’s 151 M oz of Silver identified 68 M oz of Silver mined ~ 5 miles from Columbus Project Clayton Valley (Lithium ) Lithium salts in Aquifer Production since 1950’s Aquifer type similar to Columbus * - data

Slide 5: The Columbus Project consists of
The Columbus Project consists of : • ~ 19,300 acres of mineral claims on federal land administered by the BLM, with an option for an additional ~23,000 acres. • 380 acres permitted for production of Calcium Carbonate (CaCO 3 ) and precious mineral extraction (the Permitted Area) - 270 acre mine site

Slide 6: Gold (Au) Anomaly Identified
Gold (Au) Anomaly Identified Over 60 surface samples and 5 large bulk samples taken over an ~ 27,000-acre area at depths of 3’ to 20’ analyzed by Arrakis Inc. Results of sediment analysis identified an ~5,000- acre area with samples of Au values of > 0.075 oz/t in the NW section of the basin (the Go

Slide 7: Drill Program Details
Drill ProgramDetails 18 holes drilled to a maximum depth of 100 ft* in 380-acre Production Permitted Area 2 ft composite samples taken every 10 ft Gold Results 154 Sample Av. = 0.074 opt Au 18 Drill Hole Av. = 0.070 opt Au * Holes were drilled to 100 ft or shallower due to bed rock or drilling condi

Slide 8: Aeromagnetic Survey
Aeromagnetic Survey High resolution aeromagnetic survey completed October 2007 Mag Highs = Volcanics surrounding basin Mag Lows = Young Sediments in basin and older sediments around basin A large NW-SE fault structure enters basin from the NW and could be main aquifer feed to basin Basin could be co

Slide 9: The Columbus Project represents a solid exploration and production opportunity
The Columbus Project represents a solid exploration and production opportunity: Full permit for the extraction of Gold and Silver and the production of Calcium Carbonate “Big Box Store” of mining operations: high volume and low cost Near term production horizon Red Mountain Projec t Overview

Slide 10: Red Mountain, Ca
Red Mountain, Ca Red Mountain Longer Term Exploration Project Gold, Tungsten and Silver Over 25 years of sampling and testing Option to acquire 100% by Dec 31, 2011 Location

Slide 11: The Red Mountain Project is located at the base of Red Mountain
The Red Mountain Project is located at the base of Red Mountain, 27 miles south of Ridgecrest, in San Bernardino County, California. History

Slide 12: Satellite Image
Satellite Image The Red Mountain Project is in a well known mineralized area. Proven Production in Region* Gold (Au)** : ~+1.9M oz Silver (Ag) : ~+16M oz Tungsten (W) : ~+20M lbs of WO 3 * Based on Published Reports ** Site of Glamis Gold project at Randsburg Similar Projects in California

Slide 13: Mesquite Project
Mesquite Project near Glamis , Imperial County, CA Similar metallurgy to Red Mountain Common Cyanide Heap Leach Process Recently raised ~$100M to re-start production On Schedule for full production in Jan ‘08 of 160,000 – 170,000 oz Au /yr Technical Team Retained an independent engineering firm to w

Slide 14: The Red Mountain Project consists of
The Red Mountain Project consists of : ~ 7,500 acres of mineralclaimsand mill sites on federal land administered by the BLM. Geology

Slide 15: Miocene mineralization
Miocene mineralization : General area of interest ( orange ) Major mines : ( yellow ) gold, tungsten, silver ‘Project Area’ : ( yellow ) Erosion zone from the major mines east to original lake site The erosion zone is ~ 2 miles wide and 8 miles long Technical Program Summary of Previous Work: +25 ye

Slide 16: Exploration Budget
Exploration Budget January To December 31 st 2008 Testing Program Property Payments $ 60,000 Permitting $ 350,000 Drilling Program $ 720,000 Operations $ 366,000 $ 1,496,000 Contingency (10%) $ 149,600 Estimated Costs $ 1,645,600 Summary The Red Mountain Project represents a solid exploration and pr
Source: SEC EDGAR · 8-K filed Oct 6, 2008
More decks from Ireland Inc
Corporate Update (November 2012)18 slides · Nov 29, 2012
LD Micro Conference (December 2011)10 slides · Dec 8, 2011
Rodman & Renshaw Conference September 201121 slides · Sep 9, 2011
Sidoti Micro Cap Conference June 201021 slides · Jun 30, 2010
Chicago Resource Expo April 201021 slides · Apr 21, 2010
Investor Presentation (April 2010)21 slides · Apr 15, 2010