Botala Energy Ltd. · ASX:BTE

Botala Energy — Investor Presentation (August 2025)

15 slides from Botala Energy's investor presentation, Aug 6, 2025

  1. Slide 1: A Diversified Energy Company: Gas Development Pathway

    For personal use only A Diversified Energy Company Gas Development Pathway 6 August 2025 | Investor Presentation | Kris Martinick, CEO ASX & BSE: BTE

  2. Slide 2: Disclaimer

    Disclaimer This document contains a summary of information about Botala Energy Ltd (ACN 626 751 620) (Botala Energy or Company) and its activities that is Statements contained in this document, including but not limited to those regarding the possible or assumed future costs, performance, dividends,

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot • 100% owner and operator Serowe CBM Project Board & Management Capital Structure (Sharpay Enterprises (Pty) Ltd) (as at 30 June 2025) For personal use only • ASX and BSE Listed with Perth and Gaborone offices Kris Martinick • Operational team in Gaborone and Serowe CEO Current Sh

  4. Slide 4: Gas Development Pathway Information Pack

    Gas Development Pathway Information Pack This pack is to provide clarity: For personal use only Regarding Serowe CBM Project status Proven gas to surface and composition, however, key data-point is sustained ‘commercial’ flowrates Urgent market demand has led to early off-takes while proving up flow

  5. Slide 5: Botala; Right Place, Right Time

    Botala; Right Place, Right Time Development Pathway – Clear pathway for development plan for the Serowe CBM Project • Botala retains 100% of the project For personal use only Exploration & Appraisal – Continued focus on flow-testing 2C contingent resource at 454bcf with significant exploration upsid

  6. Slide 6: High-level Comparison with a Mineral Project

    High-level Comparison with a Mineral Project Proving Up a 1Mineral Resource Proving Up Gas For personal use only Discovery Discovery Maiden Inferred Appraisal Resource Indicated Preliminary mine planning and Contingent Mineral economic viability assessments Resource Resource Current Project Status S

  7. Slide 7: Remaining Appraisal Work - Flow-Testing (Current)

    Remaining Appraisal Work - Flow-Testing (Current) Current Status & Existing Data • 2 Open holes online Pitse Pilot • Gas flows to surface and build pressure 1 3 For personal use only • Short-term flow-testing • Gas desorption • Gas composition • 3 wells drilled ready for completion – Equipment alrea

  8. Slide 8: Serowe CBM Project – Development Pathway

    Serowe CBM Project – Development Pathway Phase Description Near-term Key Milestones 0 Pitse Pilot Phase Current • Flow-test data For personal use only Continued flow-testing and appraisal data – Wells to flow for 90 days gathering – Expanded flow-test with stimulated well 1 Pitse Pilot Proof of conc

  9. Slide 9: Development Phases

    Development Phases Phase 3 - Expansion Key Workstreams to Development 03 ~600 tpd (12 PJ/annum) 1. Bankable Feasibility Study For personal use only Funding – Conclusion of Expansion Case 2. Flow-rates due diligence and ▪ Serowe-3.5B commercial negotiations ▪ Additional 3 wells Phase 1 - Pilot Pitse

  10. Slide 10: Phase – Well flow-rate data gathering (Current)

    Phase 0 – Well flow-rate data gathering (Current) •Ultra-low drilling & Serowe 3.3 stimulation costs Serowe 3.5A For personal use only Serowe 3.2 Serowe 3.4A •Serowe-3.5B stimulated well Serowe 3.5B •Remaining purchase is sand and chemicals Serowe 3.1 •4 communicating CAMP Open Holes •Sufficient wel

  11. Slide 11: Pitse Pilot Wells – Staged Expansion (Proof of Concept)

    Pitse Pilot Wells – Staged Expansion (Proof of Concept) Data Gathering from Pitse Wells • Current 5-well cluster with the addition of For personal use only Serowe-3.5B is anticipated to provide sufficient data to convert to reserve and finalise the BFS Serowe-3.1 • Additional 3 wells estimated to pr

  12. Slide 12: Phase - Pitse Pilot Expansion: Micro LNG

    Phase 1 - Pitse Pilot Expansion: Micro LNG Botala Operations & Scope Partner Companies • Drilling and complete remaining Pitse wells • Fund procurement of Galileo LNG Plant For personal use only • Operate field • Truck LNG • Operate LNG plant • Provide off-take and operate at off-loading end Pitse C

  13. Slide 13: Phase - Pitse Commercial

    Phase 2 - Pitse Commercial • Planned 3.5PJ/Annum LNG plant • 1Estimated at 108 production For personal use only wells • Botala (& Equity Partners in asset level) to fund development of the field gathering network and LNG plant • Trucking partner for distribution of LNG • SCAW Metals Group procuremen

  14. Slide 14: Disclaimer

    Disclaimer Prospective Resources Cautionary Statement For prospective resources, the estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered For personal use only accumulations. These estimates have both a risk

  15. Slide 15: Thank you / Contact Us

    Ke A Leboga For personal use only T h an k y ou Contact Us Wolf Martinick P +61 417 942 466 E wolf.martinick@botalaenergy.com.au Kris Martinick P +61 421 322 737 E kris.martinick@botalaenergy.com.au botalaenergy.com ASX & BSE: BTE