Botala Energy Ltd. · ASX:BTE
Botala Energy — Noosa NightCaps (July 2026)
11 slides from Botala Energy's conference presentation, Jul 22, 2026
Slide 1: Serowe CBM Project: the final steps to first gas
Serowe CBM Project: the final steps to first gas For personal use only ASX & BSE: BTE Noosa NightCaps Kris Martinick botalaenergy.com.au 21 July 2026 Chief Executive Officer
Slide 2: Disclaimer
Disclaimer. Answering This document contains a summary of information about Botala Energy Ltd (ACN 626 751 620) (Botala Energy or Company) and its activities that is current Statements contained in this document, including but not limited to those regarding the possible or assumed future costs, perf
Slide 3: Serowe CBM project to meet Southern Africa's looming gas deficit
Botala’s Serowe coal bed methane project has the potential to meet Southern Africa’s looming gas deficit. Answering Southern Africa’s increasing call for gas. For personal use only 4,200km2 of licences 3
Slide 4: Significant gas resources from less than 5% of exploration acreage
Botala has significant gas Notice 1 Independently Certified, Sproule, Gross estimated resource resources drawn from less than 2 In respect of the contingent resources (2C and 3C), the following cautionary statement applies: the estimated quantities of petroleum that may potentially be recovered by t
Slide 5: The commercial pathway: steps to 3.5 PJ/year
The commercial pathway: 4 steps to 3.5 PJ/year. Answering Southern Africa’s increasing call for gas. Current Phase Phase 02 Phase 03 Phase 04 5 wells 9 wells Up to 36 wells 108 wells For personal use only Pitse Pilot Mini-LNG unit x 1 Mini-LNG unit x 4 Chart LNG unit 1Projections based on material p
Slide 6: Phase Pitse Pilot: multi-well proof-of-concept
Phase 01 Pitse Pilot: A multi-well “proof-of-concept” to bridge Answering Southern Africa’s increasing call the gap between resource and production. for gas. For personal use only Well 3.5B acts as a central production well, surrounded by monitoring wells to track precise pressure changes. Current f
Slide 7: Operational catalyst: Central production well 3.5B ready for production testing
Operational catalyst: Central production well 3.5B now ready for production testing. Answering Southern Africa’s increasing call for gas. For personal use only Uniform coal Quality coal Permeable coal 13m total coal intersected including 11m Bright, well-cleated coal intersected. Wellbore washout in
Slide 8: Next steps for Well 3.5B: The path to commercial flow
Next steps for Well 3.5B: The path to commercial flow Answering Southern Africa’s increasing call for gas. For personal use only 01 02 03 04 Dewatering First gas Gas production Commercial increases flow Notice 1 Based on current Well production target1: internal economic 70 GJ/day development benchm
Slide 9: Multiple catalysts ahead to deliver value re-rating
CONCLUSION Multiple catalysts ahead to deliver value re-rating. Answering Southern Africa’s Q1 27 increasing call for gas. For personal use only Q4 26 Full Scale BFS completion Sep Full scale BFS Advancement Phase 2 mini-LNG Investment Decision Well 3.5B Further production Reserve / resource Aug sus
Slide 10: Thank you
Botala Energy Ltd Level 1, 1292 Hay Street, ABN 41 626 751 620 West Perth 6005 ASX & BSE: BTE Ke A Leboga For personal use only Thank you Kris Martinick Chief Executive Officer eNews kris.martinick@botalaenergy.com.au Join the conversation Follow us Subscribe to our e-news: +61 421 322 737 https://x
Slide 11: Cautionary Statement: Prospective Resources Reporting Notes
Cautionary Statement Answering Southern Africa’s increasing call for gas. Prospective Resources Reporting Notes Prospective Resources Cautionary Statement For personal use only 1. The prospective resources information in this document is effective as of the date of the Prospectus (Listing For prospe