  1. Slide 1: Serowe CBM Project: the final steps to first gas

    Serowe CBM Project: the final steps to first gas For personal use only ASX & BSE: BTE Noosa NightCaps Kris Martinick botalaenergy.com.au 21 July 2026 Chief Executive Officer

  2. Slide 2: Disclaimer

    Disclaimer. Answering This document contains a summary of information about Botala Energy Ltd (ACN 626 751 620) (Botala Energy or Company) and its activities that is current Statements contained in this document, including but not limited to those regarding the possible or assumed future costs, perf

  3. Slide 3: Serowe CBM project to meet Southern Africa's looming gas deficit

    Botala’s Serowe coal bed methane project has the potential to meet Southern Africa’s looming gas deficit. Answering Southern Africa’s increasing call for gas. For personal use only 4,200km2 of licences 3

  4. Slide 4: Significant gas resources from less than 5% of exploration acreage

    Botala has significant gas Notice 1 Independently Certified, Sproule, Gross estimated resource resources drawn from less than 2 In respect of the contingent resources (2C and 3C), the following cautionary statement applies: the estimated quantities of petroleum that may potentially be recovered by t

  5. Slide 5: The commercial pathway: steps to 3.5 PJ/year

    The commercial pathway: 4 steps to 3.5 PJ/year. Answering Southern Africa’s increasing call for gas. Current Phase Phase 02 Phase 03 Phase 04 5 wells 9 wells Up to 36 wells 108 wells For personal use only Pitse Pilot Mini-LNG unit x 1 Mini-LNG unit x 4 Chart LNG unit 1Projections based on material p

  6. Slide 6: Phase Pitse Pilot: multi-well proof-of-concept

    Phase 01 Pitse Pilot: A multi-well “proof-of-concept” to bridge Answering Southern Africa’s increasing call the gap between resource and production. for gas. For personal use only Well 3.5B acts as a central production well, surrounded by monitoring wells to track precise pressure changes. Current f

  7. Slide 7: Operational catalyst: Central production well 3.5B ready for production testing

    Operational catalyst: Central production well 3.5B now ready for production testing. Answering Southern Africa’s increasing call for gas. For personal use only Uniform coal Quality coal Permeable coal 13m total coal intersected including 11m Bright, well-cleated coal intersected. Wellbore washout in

  8. Slide 8: Next steps for Well 3.5B: The path to commercial flow

    Next steps for Well 3.5B: The path to commercial flow Answering Southern Africa’s increasing call for gas. For personal use only 01 02 03 04 Dewatering First gas Gas production Commercial increases flow Notice 1 Based on current Well production target1: internal economic 70 GJ/day development benchm

  9. Slide 9: Multiple catalysts ahead to deliver value re-rating

    CONCLUSION Multiple catalysts ahead to deliver value re-rating. Answering Southern Africa’s Q1 27 increasing call for gas. For personal use only Q4 26 Full Scale BFS completion Sep Full scale BFS Advancement Phase 2 mini-LNG Investment Decision Well 3.5B Further production Reserve / resource Aug sus

  10. Slide 10: Thank you

    Botala Energy Ltd Level 1, 1292 Hay Street, ABN 41 626 751 620 West Perth 6005 ASX & BSE: BTE Ke A Leboga For personal use only Thank you Kris Martinick Chief Executive Officer eNews kris.martinick@botalaenergy.com.au Join the conversation Follow us Subscribe to our e-news: +61 421 322 737 https://x

  11. Slide 11: Cautionary Statement: Prospective Resources Reporting Notes

    Cautionary Statement Answering Southern Africa’s increasing call for gas. Prospective Resources Reporting Notes Prospective Resources Cautionary Statement For personal use only 1. The prospective resources information in this document is effective as of the date of the Prospectus (Listing For prospe