Slide 1: Cu-Au-REE Exploration in Tasmania, Australia
TSX.V: CPER OTCQB: CPCPF FSE: NU0 coppercorpinc.com Cu-Au-REE Exploration in Tasmania, Australia CORPORATE PRESENTATION May 2025
Slide 2: Forward Looking Statement
Forward Looking Statement This presentation contains forward-looking statements. All statements, other than statements of historical fact that address activities, events or developments that CopperCorp Resources Inc. (the “Company”) believes, expects or anticipates will or may occur in the future ar
Slide 3: CopperCorp Resources Overview
CopperCorp Resources Large land package in Tier 1 mining district Overview 100% owned ~1,571 km2 strategic land package Skyline Project - 569km2 Along trend of Tier 1 Mount Lyell copper project (3 Mt contained Cu, 3 Moz contained gold) Advanced high-grade Cu-Au & REE targets at Razorback propert
Slide 4: West Tasmania: Investment Highlights
West Tasmania: Investment Highlights Overview 1878 km2 100% owned 100% owned licenses km2 strategicMarket ~1,571 two covering Cap of C$7.07M* land package with C$2.5M in working underexplored geological capital (as of May 2024) trends Experienced technical > 20 Mid to Advanced stage team which is in
Slide 5: Skyline Project
Skyline Project Exploring a Candelaria style and sized IOCG District 5 large 100% owned tenements, 569km2, covering 92km of combined strike length Located along trend of the Tier 1 Mount Lyell copper project (3 MT contained Cu, 3 Moz contained Au) Recently granted Razorback property offers imm
Slide 6: Razorback Property (1)
Our Flagship Razorback Property (1) Razorback Advanced high-grade Cu-Au and REE targets Granted to CopperCorp August 23, 2023 (171km²) Drilling commenced January 2024 23km of prospective strike extending directly south of the Tier 1 Mt Lyell copper mining camp (6/7 separate ore bodies) Cu-Au a
Slide 7: Razorback Property (2)
Razorback Property (2) 23km of prospective strike over under-explored Cu-Au-REE IOCG Razorback System immediately south of the Mt Lyell Copper Mine Three priority exploration prospects identified: Darwin Prospect: Historical drill results include: 30.0m @ 2.1% TREO, including 5m @ 3.3% TREO
Slide 8: Intersected Broad Cu-Au Mineralized System at Jukes
Recent Developments - Intersected Broad Cu-Au Mineralized System at Jukes (Dec. 19) Razorback Property • Drill hole JDD002W1 intersected a broad zone of copper- gold mineralization assaying 50.0m @ 0.66% Cu and 0.27g/t Au from 498.0m, including two zones of higher- grade mineralization, with best in
Slide 9: Expanded Razorback Property (December 16, 2024)
Recent Developments - Expanded Razorback Property (December 16, 2024) Razorback Property Granted new exploration licence application EL11/2024 (South Linda) located adjacent to the Razorback Property. •EL11/2024 adjoins the northeastern margin of the Razorback property and is located over the Linda
Slide 10: Visible Copper Mineralization Jukes Drilling
Recent Developments - Visible Copper Mineralization Jukes Drilling (Nov. 18) Razorback Property Jukes Prospect Geological logging indicates that JDD002W1 successfully intersected broad zones of strong K-feldspar-magnetite, chlorite-magnetite alteration and sulphide mineralization. Multiple zones o
Slide 11: JDD002W1 Drill Core
Recent Developments - JDD002W1 Drill Core Razorback Property Photograph showing chalcopyrite-pyrite-magnetite-quartz-carbonate veining in strongly k-feldspar altered rhyolite host rock, JDD002W1, 410.8m Photographs showing examples of copper sulphide mineralisation in JDD002W1: (A) chalcopyrite-pyri
Slide 12: JDD002W1 Drill Core (Pt.2)
Recent Developments - JDD002W1 Drill Core (Pt.2) Razorback Property Photograph showing moderate to strong chalcopyrite-pyrite-magnetite and quartz- Photograph showing moderate to very strong chalcopyrite-pyrite-magnetite veining and carbonate-chlorite veining in intensely k-feldspar and chlorite-mag
Slide 13: 1st Drill Hole at Jukes Completed
Recent Developments - 1st Drill Hole at Jukes Completed (October 15, 2024) Razorback Property Jukes Prospect The first diamond drill hole (JDD001) at the Jukes Prospect was completed to a depth of 214m and successfully intersected a broad zone of copper-gold mineralization assaying 132.0m @ 0.35%
Slide 14: Expanded Skyline Project (September 3, 2024)
Recent Developments - Expanded Skyline Project (September 3, 2024) Razorback Property Razorback property Combined 65km2 of new exploration license holdings (granted & under application) expands and consolidates the Skyline Project group of southern tenements into a contiguous package covering an
Slide 15: Jukes & Hydes Zones (Aug 26, 2024)
Recent Developments - Jukes & Hydes Zones (Aug 26, 2024) Razorback Property Jukes & Hydes Zones New 3D inversion modelling of magnetic and gravity data indicates highly prospective coincident magnetic pipes and gravity features at the Jukes and Hydes target zones characteristic of IOCG deposits
Slide 16: Recent Developments (May 13, 2024)
Recent Developments – (May 13, 2024) Razorback Property Jukes Prospect Assay results from sampling of historical adits - 31m @ 1.48% Cu, 0.83g/t Au and 5.21g/t Ag Within that 9m @ 2.92% Cu, 1.79g/t Au and 10.17g/t Ag Modelling of magnetic data suggests a magnetic pipe feature associated with
Slide 17: Razorback Property (3)
Razorback Property (3) Jukes Prospect Razorback Historical drill results (1970’s/1980’s) include: 13.4m @ 1.6% Cu and 1.6g/t Au (JP2) Drilling targeted at NE-SW Jukes fault Assay results from sampling of historical underground adits have confirmed high-grade copper-gold potential at the Juke
Slide 18: Razorback Property (4)
Razorback Property (4) Jukes Prospect Razorback Modelling of magnetic data suggests a magnetic pipe feature associated with the Jukes system extends up to 700m along strike and up to 1,400m below surface Mineralization and alteration style identified at Jukes, as well as the copper and gold teno
Slide 19: South Darwin Zone (Aug 19, 2024)
Recent Developments South Darwin Zone – (Aug 19, 2024) Razorback Property South Darwin Zone Assay results received for the 2-hole diamond drill program at the South Darwin prospect confirm strike extension of IOCG style Cu-Au and anomalous rare earth element (REE) values to at least 80m north of
Slide 20: Razorback Property (5)
Razorback Property (5) Razorback Darwin Prospect Significant exploration upside potential Northern mag/Th 7km-long IOCG alteration system extensions (only 10% drill tested) (untested) Magnetic anomalies represent SDD005: 30m @ 2.1% TREO immediate IOCG Cu-Au-Fe targets 13.4m @ 1.1% Cu, 1.6g/t A
Slide 21: Razorback Property (6)
Razorback Property (6) Razorback Darwin Prospect (South Darwin Zone) Priority Cu-Au & REE exploration & drill target Completed drilling of SDD007 at 553m on February 29, 2024 (to test SDD005 at depth) 50.0m @ 0.51% TREO from 89.0m, including 12.0m @ 0.9% TREO from 418.0m Historical holes onl
Slide 22: Razorback Property – REE Basket (7)
Razorback Property – REE Basket (7) Razorback SDD005 sampling indicates TREO basket comprises: ~25% of the total volume material is high-value Magnet Rare Earth Oxides (MREO) at a grade of 0.53% MREO From To Width TREO CeO2 La2O3 Nd2O3 Pr6O11 Sm2O3 Gd2O3 Dy2O3 Eu2O3 Er2O3 Tb4O7 Ho2O3 Tm2O3 Lu2O3
Slide 23: AMC Project
AMC Project Dominant Land Position over AMC an Emerging IOA-IOCG belt • Consolidated block of 100% owned tenements covering 1066km2 and combined strike length of 100km. • Advanced stage Alpine copper prospect – mineralization drilled over 600m strike and 400m depth (open). • 5,490m pre-resource dril
Slide 24: Alpine Copper Prospect
Alpine Copper Prospect Alpine Stellar Zone AP036 high-grade Cu mineralization (tray interval averaged 1.4% Cu) within: AMC - Alpine Vectoring towards thicker and higher- 23m @ 1.14% Cu from 393m (within wider zone: 92m @ 0.5% Cu from 334m) grade copper zones at depth: 1.4% Cu AP004: 28.2m @ 1.03%
Slide 25: Alpine Copper Prospect
Alpine Copper Prospect AMC - Alpine Alpine Stellar Zone Strategy to expand mineralized NE footprint Confirmed mineralization over 600m strike and to 400m depth below SW surface (OPEN) Drill permitting in process. Possible future drilling will test high-grade depth extensions Exploration along
Slide 26: Jasper Hills Prospect
Jasper Hills Prospect 16.5% Cu, 0.23g/t Au High-grade Cu-Au and base metals AMC - Jasper targets ▪ Assays up to 16.45% Cu and 10.1 g/t Au returned from sampling of historical copper prospects ▪ Assays up to 37.9% Zn+Pb, 612 g/t Ag and 1.05% Sn returned from sampling of historical silver prospects ▪
Slide 27: 2024-2025 Exploration Program
Legend 2024-2025 Exploration Program Under Review Planned 2024 2025 Exploration Q4 Q1 Q2 Q3 Q4 SKYLINE PROJECT Razorback drone geophysics Razorback review – Other target(s) evaluation Razorback drilling Jukes Hydes? Linda North/South Razorback exploration fieldwork AMC PROJECT Alpine geophysical wor
Slide 28: Corporate Summary
Corporate Summary Corporate Financings Common Shares 88,321,629 Warrants 18,475,504 ▪ October 2020 – Private Placement - C$0.8M ▪ 17.7M common shares at $0.045 per share Options 8,450,000 ▪ January 2021 – Private Placement - C$5.8M ▪ 16,450,961 common shares $0.35 per share Share Price ~$0.085 ▪ Jan
Slide 29: CopperCorp Summary
CopperCorp Summary Corporate C$2.5M in cash – September 2024 1,878km2 of prospective Cu-Au-REE ground 100%-owned in Tasmania Drill permits for drilling at Razorback Cu-Au Project @ Jukes Prospect granted Razorback Project close to mining infrastructure and 4 profitable mines which the state
Slide 30: Management & Directors
Management & Directors People Stephen Swatton Sean Westbrook Craig Roberts PRESIDENT, CEO & DIRECTOR DIRECTOR, VP EXPLORATION, FOUNDER ADVISOR Previously CEO of several TSXV junior 25+ years exploration experience. Former CEO of NewFound Gold companies including Fortress Minerals Former senior techn
Slide 31: ESG Strategy
ESG Strategy Sustainability underpins our culture and ESG practices Copper is a crucial resource for a cleaner, more sustainable world REE are crucial to EV batteries, robotics, turbines and other important uses ESG Strategy Tasmania embraces clean energy - 100% of electricity generated in the
Slide 32: West Tasmania One of the Best Jurisdictions in the World
West Tasmania One of the Best Jurisdictions in the World West Tasmania Geology Tier 1 mineral province Scale 5 World Class, Multi-Decade Mines Infrastructure Established Mining Region ESG 100% Renewable Energy State COPPERCORPINC.COM | TSX.V: CPER | OTCQB: CPCPF 32
Slide 33: Contact
CONTACT Corporate Office & General Inquiries CopperCorp Resources Inc. 800 Pender St. W, Suite 550 Vancouver, BC V6C 2V6 Canada Steve Swatton CEO, PRESIDENT & DIRECTOR stephen@coppercorpinc.com +1 (604) 970-8032 COPPERCORPINC.COM | TSX.V: CPER | OTCQB: CPCPF Created by:
Slide 34: Appendices
Appendices Appendices COPPERCORPINC.COM | TSX.V: CPER | OTCQB: CPCPF
Slide 35: IOCG Examples
IOCG Examples IOCG Gawler Craton, South Australia Olympic Dam: ~ 2.95 Bt @ 1.2% Cu, 0.5 g/t Au, 0.04% U SKYLINE Kiruna Cloncurry, Mt Isa, Queensland Great Bear Sue Dianne Aitik PROJECT Ernest Henry: NICO 226 Mt @ 1.1 %Cu, 0.51 g/t Au Mount Elliott-Swan: 570Mt @ 0.44% Cu, 0.26 g/t Au Bayan Obo Bafq A
Slide 36: Australia
Tennant Creek: Known copper Various Operators deposits/mines Gulf of Toral 0.35Timor Mt Sea Cu, 5 Moz Au Darwin Carpentaria Significant Telfer: (Since 1934) copper mines Newmont IOCG Peko 3Mt at 4.1% Cu REE Mine 0.65 Mt Cu, 19 Moz Au (Reserves & Resources) Mount Isa: Glencore DeGrussa: Sandfire Reso
Slide 37: Skyline Project
Skyline SKYLINE PROJECT COPPERCORPINC.COM | TSX.V: CPER | OTCQB: CPCPF 37
Slide 38: Skyline Project
Skyline Project Skyline Project, Tasmania, Australia Candelaria-Punta del Cobre District, Chile Late-Jurassic to Cretaceous subduction-related Skyline exhibits back arc, post-collision extension, late inversion Candelaria-like IOCG Submarine to continental rhyolitic to andesitic geology volcanics, c
Slide 39: Photo Gallery From Razorback Property
Photo Gallery From Razorback Property Photos ESG Strategy Sustainability Underpins our Culture & Practices Jukes Prospect Darwin Prospect Example of high-grade massive chalcocite-digenite Photograph of high-grade REE mineralized mineralization from outcrop grab sampling at Jukes intrusive rock taken
Slide 40: Skyline Project – Exploration Model
Skyline Project – Exploration Model Mt Read Volcanics Submarine exhalative and sub-seafloor replacement • VHMS Zn-Pb-Cu deposits • Rosebery, Hellyer deposits Epithermal transition Cu-Au, seawater/mixing input. • Magnetite at depth, Hematite+silica in upper levels. • Structurally controlled & stratab
Slide 41: Skyline Project
Skyline Project El16 / 2018 Skyline 97km2 of IOCG & porphyry Cu-Au prospective ground Potassic-magnetite-chlorite alteration associated with Cu- Au mineralization mapped over 25km of strike (magnetic highs) Dora Zone - Extensive breccia- hosted IOCG-style magnetite- sulphide mineralization outcrop
Slide 42: AMC Project
AMC AMC PROJECT COPPERCORPINC.COM | TSX.V: CPER | OTCQB: CPCPF 42
Slide 43: Alpine Stellar Zone High-Grade Depth Expansion Potential
Alpine Stellar Zone High-Grade Depth Expansion Potential Drill section A-A’ (looking northeast) AMC - Alpine Showing results from drill holes, including recent hole AP035 at the Stellar zone, Alpine prospect. Significant intervals are reported as downhole lengths. COPPERCORPINC.COM | TSX.V: CPER | O
Slide 44: Alpine Stellar Zone High-Grade Depth Expansion Potential
Alpine Stellar Zone High-Grade Depth Expansion Potential Drill section B-B’ (looking northeast) AMC - Alpine Showing results from drill holes, including recent holes AP033 and AP034 at the Stellar zone, Alpine prospect. Significant intervals are reported as downhole lengths. COPPERCORPINC.COM | TSX.
Slide 45: Alpine Stellar Zone NE High-Grade Depth Expansion Potential
High-Grade Depth Expansion Alpine Stellar Zone NE Potential Drill section C-C’ (looking northeast) AMC - Alpine Showing results from drill hole, including recent hole AP036 at the Stellar zone, Alpine prospect. Significant intervals are reported as downhole lengths. COPPERCORPINC.COM | TSX.V: CPER |
Slide 46: Photo Gallery
Photo Gallery Photos Sustainability Underpins our Culture & Practices Mt. Lyell Pit (Mt. Lyell 10km Skyline Project North of Jukes Prospect) Skyline Project South Darwin Zone Drilling Darwin Prospect COPPERCORPINC.COM | TSX.V: CPER | OTCQB: CPCPF 46
Slide 47: Risk of Over-Reliance on China for Copper and Other Battery Metals
Battery Metals Risk of Over-Reliance on China for Battery Metals Copper and Other Battery Metals 2020 EXTRACTION AND PROCESSING BY COUNTRY COPPERCORPINC.COM | TSX.V: CPER | OTCQB: CPCPF 47
Slide 48: Global Copper Production is Significantly Exposed to Water Stress
Water Stress Water Stress Global Copper Production is Significantly Exposed to Water Stress Significant Copper mines WATER STRESS LEVELS Low (<10%) Low-Medium (10-20%) Medium-High (20-40%) High (40-80%) Extremely high (>80%) No data Key copper production jurisdictions including Chile are experiencin