Minaurum Silver Inc. · TSXV:MGG

Minaurum Silver — Investor Presentation (April 2014)

21 slides from Minaurum Silver's investor presentation, April 2014

  1. Slide 1: Corporate Presentation

    Corporate Presentation Spring 2014 1

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Some of the statements contained in this presentation are forward-looking statements. Forward-looking statements are not historical facts and are subject to a number of risks and uncertainties beyond the Company's control, including, but not exclusively, statements regardi

  3. Slide 3: Strong Foundation for Growth

    Strong Foundation for Growth Proven Mine Finders • Discovered over 200 million ounces Silver & 8 million ounces Gold • Involved in two takeovers - $424M West Timmins Mining merger (Lake Shore Gold) $140M Underworld Resources (Kinross Gold Corp.) Strong Institutional Ownership • 50% owned by financia

  4. Slide 4: Proven Mine Finders

    Proven Mine Finders What? Who? Role at Minaurum Goldcorp Discovered by David M Jones Director, Senior Geologist, Property 8 million oz Los Filos Gold Deposit Vendor Kinross David M Jones, part of team Director, Senior Geologist, Property 2 million oz Buckhorn Gold Deposit credited with discovery Ven

  5. Slide 5: Accomplished Management Team

    Accomplished Management Team Darrell Rader, BBA, President, CEO & Director Board of Directors: Mining and exploration financer and operator. Served as Michael Williams, Chairman manager of Corporate Development for Energold Drilling and David M. Jones, M.S. IMPACT Silver Corp. (2003-2010) during whi

  6. Slide 6: Share Structure

    Share Structure Lowell Copper 10% Retail Institutions 20% 50% Management 20% Symbol MGG:TSX.V Shares Issued 82,100,496 Options 3,300,000 Warrants 28,753,400 Fully Diluted 114,153,896 52 Week: Hi/Low C$0.20/ C$0.03 Current Price: $0.10 Market Cap $8M Working Capital $0.9M 6

  7. Slide 7: Project Portfolio – Drill Ready Projects

    Project Portfolio – 4 Drill Ready Projects 7

  8. Slide 8: What is the Guerrero Gold Belt?

    What is the Guerrero Gold Belt? • The Guerrero Gold Belt (GGB) is becoming a world class district for gold mineral exploration with over 31 million ounces discovered in the last two decades within a 40 km trend. • Geological characteristics of an emerging mining district – BIG: Not one off deposits

  9. Slide 9: First Mover into GGB South

    First Mover into GGB South David M. Jones, Senior Geologist & Property Vendor for Minaurum Gold Inc. developed the exploration model that resulted in many of the Guerrero Gold Belt “GGB” discoveries. GGB now totals over 31 million ounces. Mining Companies Operating in the Guerrero Gold Belt Company

  10. Slide 10: Major Mines & Deposits in “GGB”

    Major Mines & Deposits in “GGB” MGG Project: Vuelcos del Destino Project covers Intrusive complexes similar to current GGB Deposits Belt has very good infrastructure with paved roads, electricity and nearby cities. 10

  11. Slide 11: Vuelcos del Destino – GGB Project

    Vuelcos del Destino – GGB Project • 20 kilometers from Goldcorp’s Los Filos Mine Project • Geology is identical to that of the Los Filos and Bermejal deposits • Extensive target areas identified by mapping, geochemical sampling, and airborne geophysics • Mapping and detailed sampling are currently u

  12. Slide 12: Vuelcos del Destino – GGB Project

    Vuelcos del Destino – GGB Project Los Filos mineralized intrusion sample displayed 12 next to Vuelcos intrusion outcrop

  13. Slide 13: Vuelcos del Destino – GGB Project

    Vuelcos del Destino – GGB Project Coincident stream sediment geochemistry and VTEM aeromagnetic anomalies are consistent with Guerrero Gold Belt style mineralization 1 km 13

  14. Slide 14: Mineral Discoveries

    Mineral Discoveries Project Aurena - Gold Adelita - Copper District 4,534 hectares 8,449 hectares Scale Gold Mineralized trend: 3.5km by 1km Skarn Drill Defined 2 drill defined Gold Zones Copper porphyry measuring 3km by 1km Target First Zone: 1.8 km long Gold zone at 2012 drill assays: 105.2 metres

  15. Slide 15: Aurena - Gold in Soils

    Aurena - Gold in Soils Phase One Current 7,000m drilling complete Exploration Phase Two Drilling Drill program pending Gold mineralization remains open to the west, northwest, north, and at depth. 2nd phase drilling program will focus on delineating the extent of mineralization Interval Hole From (m

  16. Slide 16: Adelita - Copper Porphyry/Skarn

    Adelita - Copper Porphyry/Skarn • Discovery holes (not true width): – 105.2 metres of 1.03% Copper including 41.9 m of 2.21% Copper; 0.93 g/t Gold and 77.5 g/t Silver – 201.4 metres of 0.52% Copper • Strong Copper-Gold-Silver mineralization from surface to 300m depth at Cerro Grande • Mezquital targ

  17. Slide 17: Project Pipeline

    Project Pipeline Santa Marta Copper-Gold New VMS District Discovery in underexplored southern Oaxaca • Under option to Lowell Copper (JDL:TSX.V) to acquire up to 70% interest with exploration expenditures of $6M over 3 years and completion of a prefeasibility study in 5 years to earn 70% • Lowell is

  18. Slide 18: Santa Marta – Copper Gold VMS District

    Santa Marta – Copper Gold VMS District • 700m strike length of exposed massive gossan with a small historical pit. Mine active in late 1960s, produced 50k-70k tons of oxide copper ore; mine sampling averaged 1.7% copper over 33 meters, with up to 2.0 g/t gold and 37 g/t silver • Geological setting s

  19. Slide 19: Santa Marta – Copper Gold VMS District

    Santa Marta – Copper Gold VMS District • Two drill targets: • Stringer Zone- exposed both laterally and vertically for several hundred metres along strike, mined historically • Massive Oxide-Silica zone – overlies stringer zone, traced for over 700m with average thickness between 75-100m • ~2,500m d

  20. Slide 20: Upcoming News Catalysts

    Upcoming News Catalysts • Vuelcos del Destino gold project – 7,500m drilling program announcement once drill permits are complete – Located 19km from Goldcorp’s Los Filos Mine • Adelita copper-gold project & Aurena gold project – Advance projects further via potential joint venture option agreements

  21. Slide 21: Contact Us

    Contact Us Investor Relations Manager Sunny Pannu Tel: 778 330 0994 Email: pannu@minaurum.com Website: www.minaurum.com Visit our YouTube Channel 21

Minaurum Silver — Investor Presentation (April 2014) on 6ix