Cadeler PLC · NYSE:CDLR

Cadeler — Investor Presentation (November 2020)

30 slides from Cadeler's investor presentation, Nov 27, 2020

  1. Slide 1: Company Presentation

    Slide 1: Company Presentation

    Company Presentation 27 November 2020

  2. Slide 2: Disclaimer (1/2)

    Slide 2: Disclaimer (1/2)

    Disclaimer (1/2) THIS PRESENTATION IS NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, IN OR INTO OR FROM THE UNITED STATES OF AMERICA, ITS TERRITORIES OR POSSESSIONS, AUSTRALIA, CANADA, JAPAN OR SOUTH AFRICA OR TO ANY RESIDENT THEREOF, OR ANY JURISDICTION W

  3. Slide 3: Disclaimer (2/2)

    Slide 3: Disclaimer (2/2)

    Disclaimer (2/2) An investment in the Company's shares should be considered as a high-risk investment. Several factors could cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievement that may be expressed or im

  4. Slide 4: Today's presenters

    Slide 4: Today's presenters

    Today’s presenters Mikkel Gleerup Mark Konrad Chief Executive Officer Chief Financial Officer ► Cadeler since 2017, CEO since 11/2017, previously ► Joined Cadeler as CFO having led the debt and COO equity raises for the Cadeler IPO ► 16+ years offshore wind experience ► Joined the Swire group in 201

  5. Slide 5: Agenda

    Slide 5: Agenda

    Agenda 1. Investment highlights 2. Appendix 5

  6. Slide 6: Cadeler investment highlights

    Slide 6: Cadeler investment highlights

    Cadeler investment highlights 1 Experienced company ► Cadeler is an experienced and leading offshore wind farm contractor with strategic focus on turbine and foundation installation with strategic focus on turbine and ► Ordered its first wind farm installation vessel in 2010 and can show to an exten

  7. Slide 7: Cadeler - a decade of industry experience

    Slide 7: Cadeler - a decade of industry experience

    1 Experienced company with strategic focus on turbine and foundation installation Cadeler - a decade of industry experience Company introduction Cadeler strategy and key strategic priorities ► Cadeler is a leading turbine and foundation installation contractor in the ► Cadeler’s strategy is to own a

  8. Slide 8: Diversified foundations

    Slide 8: Diversified foundations

    1 Experienced company with strategic focus on turbine and foundation installation Pure play WTIV contractor with strong market position Cadeler industry position vs. peers Cadeler track record and project backlog vs. peers3 # units Track record foundations Track record turbines Backlog foundations B

  9. Slide 9: Strategic focus on transportation and installation of turbines

    Slide 9: Strategic focus on transportation and installation of turbines

    1 Experienced company with strategic focus on turbine and foundation installation Strategic focus on transportation and installation of turbines 1 Turbine installation 2 Foundation installation 3 Other services ► Key strategic focus is on turbine and foundation installation utilizing top-tier vessel

  10. Slide 10: Strong contract backlog provides healthy earnings visibility

    Slide 10: Strong contract backlog provides healthy earnings visibility

    2 Superior backlog provides earnings visibility Strong contract backlog provides healthy earnings visibility Contract backlog value1,2 Contract backlog per year2 USDm USDm ► Cadeler’s announced contracts are with following counterparts: 129 12 83 ► Selective contract term considerations 73 ► Backlog

  11. Slide 11: Robust pipeline and excellent position to win new work from 2023

    Slide 11: Robust pipeline and excellent position to win new work from 2023

    2 Superior backlog provides earnings visibility Robust pipeline and excellent position to win new work from 2023 Pacific Orca Charterer 2021 2022 2023 2024 2025 O&M campaign SGRE Dock - scope 1 Hornsea Two DEME Offshore Dock - scope 2 Seagreen MHI Vestas Undisclosed Undisclosed Crane upgrade project

  12. Slide 12: Self-propelled jack-up wind farm installation vessels, existing fleet

    Slide 12: Self-propelled jack-up wind farm installation vessels, existing fleet

    100 125 150 175 0 25 50 75 Meter Seajacks Zaratan Innovation Brave Tern Sea Installer Sea Challenger Blue Tern Bold Tern MPI Adventure Seajacks Scylla Taillevent Apollo Aeolus Lifting height1,2 Vole au Vent Pacific Orca Pacific Osprey 200 400 600 0 800 1000 1200 1400 1600 1800 Tonne Apollo Sea Insta

  13. Slide 13: Upgrades to future-proof the fleet for 20+ MW turbines

    Slide 13: Upgrades to future-proof the fleet for 20+ MW turbines

    3 Highly capable fleet that is relevant to current and future demand Upgrades to future-proof the fleet for 20+ MW turbines ► Cadeler is planning to commit to crane replacement projects for both the Orca and the Osprey ► Detailed engineering ongoing. Projects are planned to be completed early 2024 a

  14. Slide 14: Planned new-build expected to obtain highly attractive economics

    Slide 14: Planned new-build expected to obtain highly attractive economics

    3 Highly capable fleet that is relevant to current and future demand Planned new-build expected to obtain highly attractive economics Current plan for Cadeler X-Class design vessel Potential new-build sensitivities capex/EBITDA2 • Bespoke version of the NG-20000X-G (x) design, incorporating Cadeler’

  15. Slide 15: Cadeler aiming to stay at the forefront of the industry

    Slide 15: Cadeler aiming to stay at the forefront of the industry

    3 Highly capable fleet that is relevant to current and future demand Cadeler aiming to stay at the forefront of the industry Orca/Osprey X-class NG-14000XL NG-16000X Voltaire Vessel / design upgraded1 (new-build)2 (new-build) (new-build) (new-build) 1 Existing O-Class vessels post crane upgrades Com

  16. Slide 16: Attractive green debt financing

    Slide 16: Attractive green debt financing

    4 Strong balance sheet enables execution of Cadeler’s growth strategy Attractive green debt financing Key terms credit facility Repayment profile EURm Borrower: Cadeler A/S Lenders: DNB Bank ASA and SpareBank 1 SR-Bank ASA Status: Senior Secured on 1st lien basis Amortization EUR 95m, in two tranche

  17. Slide 17: Robust balance sheet with prudent leverage profile

    Slide 17: Robust balance sheet with prudent leverage profile

    4 Strong balance sheet enables execution of Cadeler’s growth strategy Robust balance sheet with prudent leverage profile Pro forma balance sheet 20191 Vessel values and LTV3,4 USDm Total; 312 Total; 312 Cash, 1 Vessel values Debt Borrowings, 31% LTV Other 70 assets, 21 Other liabilities, 13 410 22%

  18. Slide 18: Offshore wind is now a highly cost competitive source of energy

    Slide 18: Offshore wind is now a highly cost competitive source of energy

    5 Rapidly growing market with strong outlook Offshore wind is now a highly cost competitive source of energy Turbine size in offshore wind farm projects Costs for new electricity generation (NWE) MW, projects by COD1 year LCOE EUR/MWh 14 Levelized Cost Of Electricity (LCOE) 169 12 167 Combines capit

  19. Slide 19: Most existing vessels lack the capabilities to install large turbines

    Slide 19: Most existing vessels lack the capabilities to install large turbines

    5 Rapidly growing market with strong outlook Most existing vessels lack the capabilities to install large turbines Selected competitive parameters for WTIVs: WTIVs by expected capacity to install turbines of given MW rating2,3,4 1. Lifting height capacity above sea level # vessels ► Announced turbin

  20. Slide 20: Tightening market balance with longer lead times and improving rates

    Slide 20: Tightening market balance with longer lead times and improving rates

    5 Rapidly growing market with strong outlook Tightening market balance with longer lead times and improving rates Possible supply and demand for WTIVs1,2 # vessels Indications 30 ► Tightening market Categorization 25 of demand by ► Longer contracting turbine rating: lead-times and improved pricing p

  21. Slide 21: Leading turbine and foundation installation contractor with solid backlog

    Slide 21: Leading turbine and foundation installation contractor with solid backlog

    Leading turbine and foundation installation contractor with solid backlog and attractive growth prospects Experienced Highly capable Strong balance company with Superior backlog fleet that is sheet enables Rapidly growing strategic focus provides relevant to execution of market with on turbine and e

  22. Slide 22: Agenda

    Slide 22: Agenda

    Agenda 1. Investment highlights 2. Appendix 22

  23. Slide 23: Experienced management team with solid industry background

    Slide 23: Experienced management team with solid industry background

    Experienced management team with solid industry background Mikkel Gleerup, CEO Jacob H Jensen, COO ► Cadeler since 2017, CEO since 11/2017, previously COO from ► Cadeler since 2019, COO since 6/2019 05/2017 ► Experience from Dong Energy and INEOS ► 16+ years offshore wind experience ► 20+ years of e

  24. Slide 24: Board of Directors

    Slide 24: Board of Directors

    Board of Directors Richard Sell Roy Shearer Connie Hedegaard Jesper Lok Ditlev Wedell-Wedellsborg Andreas Beroutsos Chairman of the Board Director Director Director Director Director To chair nomination committee To chair remuneration committee To chair audit committee BW Group representative ► Comm

  25. Slide 25: Key financials – as if Cadeler had owned the vessels historically

    Slide 25: Key financials – as if Cadeler had owned the vessels historically

    Key financials – as if Cadeler had owned the vessels historically1 Historical adj. EBITDA2,3,4 Cadeler 2019 pro forma P&L4 USDm USDm 1 2019 coloured by the Pacific Osprey awaiting installation of the 2019 new crane boom in 1H20 as well as the Pacific Orca being 70% employed on a lower yielding O&M c

  26. Slide 26: Financial statements – reflecting Cadeler prior to acquiring the vessels

    Slide 26: Financial statements – reflecting Cadeler prior to acquiring the vessels

    Financial statements – reflecting Cadeler prior to acquiring the vessels1,2 P&L (EURm) 2018 2019 1H20 Cash flow statement (EURm) 2018 2019 1H20 Balance sheet (EURm) 2018 2019 1H20 Vessel hire 61.2 32.7 7.8 Loss for the year -6.3 -23.8 -20.3 PPE 0.1 0.1 0.1 Other revenue 10.5 5.7 1.3 Rights-of-use as

  27. Slide 27: Fleet of two large high-capability wind farm installation vessels

    Slide 27: Fleet of two large high-capability wind farm installation vessels

    Fleet of two large high-capability wind farm installation vessels Vessel name Pacific Orca Pacific Osprey Pacific Orca Flag state Cyprus Cyprus DP2 self-propelled jack-up DP2 self-propelled jack-up Type of vessels vessel, 6 legs vessel, 6 legs Delivery year 2012 2013 Yard Samsung Heavy Industries Sa

  28. Slide 28: Demand and supply analysis

    Slide 28: Demand and supply analysis

    Demand and supply analysis Possible demand for high-end WTIVs1,2,3,4,5,6,7,8 WTIV fleet by expected capacity1,9 # vessels WTIVs and expected capacity to install turbines of given MW rating. Only firm upgrades 30 included in considering vessel capacity (X = capable, competitive) <10 MW Assumed tubine

  29. Slide 29: Key terms and abbreviations used

    Slide 29: Key terms and abbreviations used

    Key terms and abbreviations used Terms Definition Existing customer contracts that imply revenues going forward – indicated herein as “firm” contracts. Such contracts, and revenues derived therefrom, are based on various terms and conditions including cancellation events. In addition, such contracts

  30. Slide 30: Visiting address

    Slide 30: Visiting address

    Visiting address Cadeler A/S | Fairway House, Arne Jacobsens Allé 7 | DK–2300 Copenhagen S | Denmark Telephone +45 3246 3100