Tg Metals Ltd. · ASX:TG6
Tg Metals — Shareholder Meeting (November 2025)
17 slides from Tg Metals's shareholder meeting presentation, Nov 28, 2025
Slide 1: Gold and Lithium Projects – Annual General Meeting November 2025
GOLD AND LITHIUM PROJECTS For personal use only Western Australia Advanced Deposits with Scalable Growth Annual General Meeting – November 2025 ASX:TG6
Slide 2: Disclaimer
DISCLAIMER This presentation has been prepared by TG Metals Limited. The information contained in this presentation is not investment or FORWARD LOOKING STATEMENT financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been This pr
Slide 3: Van Uden Gold Project – Advanced with Exploration Upside
VAN UDEN GOLD PROJECT – ADVANCED WITH EXPLORATION UPSIDE Historical production with pathway to recommence mining Near term cash flow from existing stockpiles and surface resources For personal use only Resource Growth from drilling along strike and down dip. Drilling underway and will continue into
Slide 4: Corporate Overview
CORPORATE OVERVIEW Capital Structure Shareholder Composition Shares on Issue Cash & Receivables1 Market Cap2 120.5M 1 $5.4M $23.5M 2 at 3 November 2025 at $0.195 share price For personal use only Directors & Management 12 Month Share Price Performance Richard Bevan Non Exec Chairman Brett Smith Non
Slide 5: Project Overview
VAN UDEN PROJECT OVERVIEW Forrestania Greenstone Belt significant gold endowment and production Historic Production with two shallow open pits, For personal use only stockpiles and walk-up drill targets Growing Resource with 227,140oz* open along strike and down dip Situated within 100km rad
Slide 6: Project – Enormous Expanded Strike Upside
VAN UDEN PROJECT – ENORMOUS EXPANDED STRIKE UPSIDE New extensive soil sampling assays define gold in soil anomaly 6.5Km long1 Historical drilling on the anomalies not followed up For personal use only Magnitude of soil anomaly extensions mirror Conceptual Pit Outline defined resource at Van Ud
Slide 7: Project – Significant Gold Resource with Upside
VAN UDEN PROJECT – SIGNIFICANT GOLD RESOURCE WITH UPSIDE Unexplored Current Mineral Resource 6.35Mt @ 1.1 g/t Au for 227,140 oz1 (JORC 2012) Conceptual Pit Outline Resource depth only 148m, limited by drilling For personal use only Open along strike and down dip High grade zones well defined
Slide 8: Gold Project – Clear Opportunities to Grow
VAN UDEN GOLD PROJECT – CLEAR OPPORTUNITIES TO GROW Existing Tasman Pit Existing Dieman Pit For personal use only Conceptual Pit Outline CURRENT DRILLING TARGETING RESOURCE EXTENSIONS AT DEPTH 8
Slide 9: Gold Project – Drilling for Resource Expansion
VAN UDEN GOLD PROJECT – DRILLING FOR RESOURCE EXPANSION B’ B For personal use only C’ C SHALLOW DRILLING COMPLETE - CURRENT DRILLING TARGETING DOWN DIP 9
Slide 10: Tasman Open Pit – High Grade Below Pit Floor
TASMAN OPEN PIT – HIGH GRADE BELOW PIT FLOOR For personal use only Cross Section through Tasman Pit 10
Slide 11: Dieman Open Pit – Very Shallow Drilled, Significant Upside
DIEMAN OPEN PIT – VERY SHALLOW DRILLED, SIGNIFICANT UPSIDE For personal use only 1. Refer to TG6 ASX Announcement dated 5 June 2025 Cross Section through Dieman Pit 11
Slide 12: Gold City Prospect – Exploration Opportunity
GOLD CITY PROSPECT – EXPLORATION OPPORTUNITY – EVOLVING SATELLITE 20kms south of Van Uden Numerous historical gold workings at “Downtown” Multiple gold lodes defined by only 11 For personal use only RC Gold historic RC drill holes and 7 new RC Drillholes drillholes including: 14m @ 2.26g/t A
Slide 13: Gold City Prospect – Enormous Upside
GOLD CITY PROSPECT – ENORMOUS UPSIDE Untested gold in soil anomalies Expanded soil anomaly N-E of historical For personal use only workings New drilling defines apparent plunge to the N-E Multiple lodes Mineralisation controls to be intersected in most drill defined holes Potential repet
Slide 14: Lake Johnston Project – Significant Hard Rock Lithium Deposit
LAKE JOHNSTON PROJECT – SIGNIFICANT HARD ROCK LITHIUM DEPOSIT Burmeister Exploration Target Statement* Tonnes Range Tonnes Range Li2O Range Li2O Range Low High Low (%) High (%) 15.6 million 20.1 million 0.97 1.19 For personal use only At 0.4% Li2O cutoff The Exploration Target quantity and grade i
Slide 15: Next Steps – Resource Growth and Pathway to Production
NEXT STEPS – RESOURCE GROWTH AND PATHWAY TO PRODUCTION TASK Q4 CY2025 Q1 CY2026 Q2 CY2026 Q3 CY2026 Q4 CY2026 Stockpiles SMP Approved Done Drilling Tasman Pit Done Resource Drilling VU Continuing Depth and Strike Extensions For personal use only Gold City Drilling Done New Targets and Expansion Upda
Slide 16: Value Proposition – Strategic Addition and Synergies
VALUE PROPOSITION - STRATEGIC ADDITION AND SYNERGIES Dual Commodity Exposure For personal use only Near term cash flow FOR MORE INFORMATION David Selfe – CEO Email: dselfe@tgmetals.com.au Resource growth with ongoing Richard Bevan - Chairperson drilling Email: rbevan@tgmetals.com.au Well Funded 16
Slide 17: Appendices – Van Uden Mineral Resource Estimate
APPENDICES – VAN UDEN MINERAL RESOURCE ESTIMATE For personal use only OPEN DOWN DIP, AND Notes to Resource Table: The MRE is estimated with all available drilling data as at 30 May 2025 and reported at a 0.35g/t Au cutoff. ALONG MRE reported in ASX announcement 5 June 2025 The MRE is reported in acc