Western Copper And Gold Corporation · TSX:WRN

Western Copper And Gold — Conference Presentation (December 2020)

38 slides from Western Copper And Gold's conference presentation, December 2020

  1. Slide 1: December 2020

    DECEMBER 2020 TSX : WRN I NYSE AMERICAN : WRN

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS The information provided in this presentation is not intended to be a comprehensive review of all matters and developments concerning Western Copper and Gold Corporation and its subsidiaries (collectively, the “Company”). This document should be read in conjunction with al

  3. Slide 3: Clean and Tightly-Held Ownership Structure

    CLEAN AND TIGHTLY-HELD OWNERSHIP STRUCTURE TRADING Toronto Stock Exchange TSX: WRN NYSE American Stock Exchange NYSE American: WRN CASH POSITION* Cash & Short Term Investments C$ 31.7 million *includes proceeds from November 2020 financing September 30, 2020 (*pro-forma) Short/Long Term Debt $Nil SH

  4. Slide 4: WRN and the Casino Deposit

    WRN AND THE CASINO DEPOSIT ALASKA YUKON SIGNIFICANT COPPER-GOLD PROJECT CASINO ✓ One of the largest copper-gold projects in Canada PROJECT ✓ New increased resource Whitehorse ✓ Straightforward project – open pit, standard flowsheet Skagway LOCATED IN THE RIGHT PLACE ✓ Yukon, Canada – a new emerging

  5. Slide 5: Significant Copper-Gold Project

    SIGNIFICANT COPPER-GOLD PROJECT

  6. Slide 6: An Attractive Copper or Gold Mine

    AN ATTRACTIVE COPPER OR GOLD MINE Silver, 4% Moly, 18% Copper, 41% GOLD COPPER 14.5 M 7.6 B oz M+I Resources lbs M+I Resources + + Gold, 38% 6.6 M 3.3 B oz Inferred Resources lbs Inferred Resources CONTAINED METAL VALUE DISTRIBUTION IN THE M&I MILL RESOURCE Source: 2020 Resource. See “Notes” in Appe

  7. Slide 7: TSX/V Junior Controlled Copper Projects

    TSX/V JUNIOR CONTROLLED COPPER PROJECTS – ONLY 15 UKMP Pebble CASINO Kutcho KSM Morisson Northisle Harper Creek Northmet King King Cascabel Tampakan Canariaco Norte Cotabambas Mina Justa Project Constellation Productora MANY OF THESE PROJECTS: • are too small to have an impact on copper supply • are

  8. Slide 8: Top 10 Largest TSX/V Junior Controlled Gold Projects

    TOP 10 LARGEST TSX/V JUNIOR CONTROLLED GOLD PROJECTS Pebble CASINO KSM Donlin Livengood Rosia Montana New Prosperity Metates Tampakan Freida River Los Helados MANY OF THESE PROJECTS: • are not economic at current prices • are located in unfavorable jurisdictions Source: public records. • have enviro

  9. Slide 9: Significant Copper Deposit

    SIGNIFICANT COPPER DEPOSIT ■ Measured & Indicated Resources ■ Inferred Resources Notes: Peer group data as per latest company documents and public files. See “Notes” in Appendix for equivalent calculations. No discount for metallurgical recovery. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s P

  10. Slide 10: Significant Gold Deposit

    SIGNIFICANT GOLD DEPOSIT ■ Measured & Indicated Resources ■ Inferred Resources Notes: Peer group data as per latest company documents and public files. See “Notes” in Appendix for equivalent calculations. No discount for metallurgical recovery. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Pre

  11. Slide 11: Casino Deposit

    CASINO DEPOSIT Heap Leach Resource (M+I): Leached Cap 217 Million Tonnes @ 0.27 g/t AuEq Mill Resource (M+I): Supergene Sulphide & Hypogene 2.17 Billion Tonnes @ 0.36% CuEq Notes: East—west longitudinal section 6958400 N. Based on 2020 Resource. See “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : W

  12. Slide 12: Good Grade

    GOOD GRADE MINERAL RESOURCE COMPARES FAVORABLY WITH OPERATING MINES Casino Mill M+I ($16/t NSR) (1322 Mt) Casino Mill M+I ($5.70/t NSR) (2173 Mt) CASINO Operating Mine Average Copper Mountain - CMMC (466 Mt) Gibraltar - TKO (511 Mt) Highland Valley - TCK (329 Mt) Developing Mine Average PEERS Mt. Mi

  13. Slide 13: Standard Processing Circuit (Permitting Case)

    STANDARD PROCESSING CIRCUIT (Permitting Case)* MILLING • Throughput: average LOM 124,000 tonnes per day • Grinding Circuit: 40 ft SAG Mill (29 MW) + 2 x 28 ft Ball Mills (22 MW each) • Medium – soft ore: BWi – 14.1 kWh/t, 200 µm primary grind FLOTATION • Conventional copper/moly circuit • Recoveries

  14. Slide 14: An Emerging Mining District

    & western COPPER AND GOLD AN EMERGING MINING DISTRICT

  15. Slide 15: Yukon – A Storied and Modern Record of Mining

    YUKON – A STORIED AND MODERN RECORD OF MINING TIER 1 JURISDICTION ✓ Mining territory in Canada STRONG GOVERNMENT SUPPORT ✓ Funding for marketing and infrastructure STRAIGHTFORWARD PERMITTING ✓ Single assessment agency ✓ Several initiatives underway to streamline processes ACTIVE MINING DISTRICT ✓ 3

  16. Slide 16: Social License

    SOCIAL LICENSE COMMUNITY ENVIRONMENTAL ✓ Ongoing Engagement with Local ✓ Accepting Robert E Leckie Communities Award ✓ 14+ Years of Operating Responsibly in ✓ Outstanding Environmental the Yukon stewardship SUPPORTING FIRST NATIONS ✓ Biennial Moosehide ✓ Selkirk Spirit Dancers ✓ Significant and Cont

  17. Slide 17: Casino Access Road Funding Secured

    CASINO ACCESS ROAD FUNDING SECURED ▪ $130 million funding committed from Governments for the Casino Access Road ▪ Initial portion of road through EA process – expect construction next year ▪ Agreement with FN’s on key aspects of remaining road reached. Canadian Prime Minister Justin Trudeau and Yuko

  18. Slide 18: Key Asset in an Emerging New Gold District

    KEY ASSET IN AN EMERGING NEW GOLD DISTRICT ✓ Major gold miners in area – Newmont, Agnico-Eagle, Kinross, and others ✓ ~ 30 million ounces of gold in district* ✓ Significant exploration upside WHITE GOLD ✓ Government commitment to fund access to area ✓ 2 Projects in permitting ✓ Community and First N

  19. Slide 19: Continuing to Add Value

    western COPPER AND GOLD CONTINUING TO ADD VALUE

  20. Slide 20: Building a Better Project

    BUILDING A BETTER PROJECT CLEAR HISTORY OF DERISKING PROJECT AND ADDING VALUE • 2013 – Issued Feasibility Study • 2014 – Entered YESAB EA process • 2016 – Elevated to YESAB Panel • 2017 – Government Announces Road Funding • 2018 – Completed Tailings Options Study (BATT) • 2019 – Infill drilling comp

  21. Slide 21: 2020 Drill Campaign

    2020 DRILL CAMPAIGN New Northern Casino Pit Porphyry outline Casino “B” Ana High Grade Gold Zone TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 21

  22. Slide 22: High Grade Gold Zone

    HIGH GRADE GOLD ZONE 55.1 g/t Au over 2.97 m @ 147.98 m 53.5 g/t Au over 2.45 m @ 343.55 m 2020 73.6 g/t Au over 1.85 m @ 69.16 m Intercepts > 2 g/t gold Trend of very high gold values High Bismuth Zones Note: See News Release dated June 4, 2020 for details on drilling program. TSX : WRN I NYSE AMER

  23. Slide 23: New Northern Porphyry

    NEW NORTHERN PORPHYRY 2019 Northern step-out 0.38% CuEq* over • 9/10 holes with significant widths 107.83 m @ 40 m of mineralization • 7/10 holes ended in mineralization 2020 Note: See News Release dated June 4, 2020 for details on drilling program. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’

  24. Slide 24: Canadian Creek

    CANADIAN CREEK 2020 Note: See News Release dated June 4, 2020 for details on drilling program. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 24

  25. Slide 25: Ana and Casino B

    ANA AND CASINO B Newmont Coffee Project Note: See News Release dated June 4, 2020 for details on drilling program. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 25

  26. Slide 26: Deeper Porphyry Targets

    DEEPER PORPHYRY TARGETS Current deposit outline • Additional geophysical targets identified at depth Chargeability @ 67 ms MT @ 66 mS Source: Witherly, Ken, “New Riches from Old Data; a Re-evaluation of Legacy Data from the Casino Deposit, Yukon, AME Roundup, January 25, 2018 TSX : WRN I NYSE AMERIC

  27. Slide 27: Investment Highlights and Path Forward

    INVESTMENT HIGHLIGHTS AND PATH FORWARD CASINO PROJECT ALREADY TICKS MANY OF THE BOXES: ✓ Significant copper and significant gold project ✓ Yukon – an emerging mining district ✓ Exploration targets with significant potential upside STEADY PROGRESS: ✓ 2018: Tailings alternatives study completed ✓ 2019

  28. Slide 28: Analyst Coverage

    ANALYST COVERAGE CORMARK SECURITIES ROTH CAPITAL PARTNERS H.C. WAINWRIGHT & CO. Stefan Ioannou Matthew Farwell, CFA, Heiko F. Ihle, CFA Tel: (416) 943-4222 Tel: (949) 720-7189 Tel: (212) 356 - 0510 TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 28

  29. Slide 29: Appendix

    a a fo) oO a ZI < a rT) a a ° re) Cc he wo ~ n cd) 3 =~ APPENDIX

  30. Slide 30: Board of Directors

    BOARD OF DIRECTORS Dale Corman, 40 years experience as a senior corporate officer of publicly listed companies. Extensive expertise in mineral exploration B.Sc, P.Eng. & development, financing, property evaluation and acquisition. Formerly Chairman & CEO of Western Silver Executive Chairman Corporat

  31. Slide 31: Tailings Options Study

    TAILINGS OPTIONS STUDY Key permitting milestone achieved with the completion of Best Available Tailings Technology (BATT) Study. Importantly, First Nation, Territorial and Federal Governments were involved in the study examining every possible scenario for dealing with tailings and mine waste DESIGN

  32. Slide 32: Excellent Concentrate Quality

    EXCELLENT CONCENTRATE QUALITY COPPER CONCENTRATE MOLYBDENUM CONCENTRATE Element Avg Value Unit Element Avg Value Unit Copper 28 % Molybdenum 57.4 % Gold 25 g/t Copper 0.39 % Silver 120 g/t Rhenium 133.5 g/t Iron 0.8 % Molybdenum 0.05 % Sulphur 37.9 % Iron 26 % Arsenic 1659 g/t Sulphur 36 % Antimony

  33. Slide 33: Yukon Map

    YUKON MAP TSX : WRN I NYSE AMERICAN : WRN

  34. Slide 34: Yukon exploration activity map

    The exploration activity data represented on this map were compiled by Mineral Resources Branch. Please contact minina@aov.yk.ca for further information.

  35. Slide 35: 2020 Resource

    2020 RESOURCE Mill Resource ($5.70/t NSR cut-off) Tonnes Copper Gold Moly Silver CuEq Copper Gold Moly Silver Class M (%) (g/t) (%) (g/t) (%) (M lb) (M oz) (M lb) (M oz) Measured 145.3 0.31 0.40 0.025 2.1 0.74 986 1.9 80.6 9.8 Indicated 2,028.0 0.14 0.17 0.016 1.4 0.33 6,448 10.9 731.0 90.4 M+I 2,17

  36. Slide 36: 2020 Resource

    2020 RESOURCE Heap Leach Resource ($5.46/t NSR cut-off) Tonnes Copper Gold Silver AuEq Copper Gold Silver Class M (%) (g/t) (g/t) (g/t) (M lb) (M oz) (M oz) Measured 37.2 0.05 0.45 2.8 0.48 39.3 0.5 3.3 Indicated 180.2 0.03 0.21 1.7 0.23 127.2 1.2 10.0 M+I 217.4 0.03 0.25 1.9 0.27 166.5 1.8 13.3 Inf

  37. Slide 37: Notes

    NOTES “2020 Resource”: • Technical report entitled “Casino Project,Form 43-101F1 Technical Report Mineral Resource Statement, Yukon, Canada" dated July 3, 2020, a copy of which is available on the Company's website at www.westerncopperandgold.com. • Prepared by Daniel Roth, P.E., P. Eng., Mike Heste

  38. Slide 38: www.westerncopperandgold.com

    WWW.WESTERNCOPPERANDGOLD.COM INFO@WESTERNCOPPERANDGOLD.COM 604 684 9497

Western Copper and Gold — Conference Presentation (December 2020) on 6ix