African Rainbow Minerals Limited · JSE:ARI

African Rainbow Minerals — Non-Deal Roadshow (November 2008)

25 slides from African Rainbow Minerals's roadshow presentation, November 2008

  1. Slide 1: Investor Roadshow November 2008 – Corporate structure

    Investor Roadshow November 2008 Corporate structure 100% 100%*** 51% 65% 16% Exploration Gold TEAL Harmony Platinum Ferrous Coal (primary listing on TSX) (primary listing on JSE) PGMs Iron Ore 20% Xstrata Coal Zambia 50% Modikwa* 50% Beeshoek South Africa 100% Konkola North** 55% Two Rivers 50% Khum

  2. Slide 2: Disclaimer

    Disclaimer Certain statements in this report constitute forward looking statements that are neither reported financial results nor other historical information, include but are not limited to statements that are predictions of or indicate future earnings, savings, synergies, events, trends, plans or

  3. Slide 3: Growing diversified commodity business

    Growing diversified commodity business Attributable EBIT split between commodities (excluding corporate and exploration costs) F2007 F2008 Platinum Group Metals 37.0% Thermal Coal 0.7% Platinum Group Metals 24.4% Thermal Coal 0.3% Chrome 13.0% Chrome 4.2% Manganese 19.3% Manganese 49.2% Nickel 4.1%

  4. Slide 4: Continuous focus on reducing costs

    Continuous focus on reducing costs ARM target for operations on the respective global cost curves by 2012 (benchmarked at steady state) Nkomati Chrome Manganese Smelter 2012 Goedgevonden Coal Modikwa Platinum Chrome Smelter Khumani Iron Ore Nchwaning Manganese Commodity Nkomati Nickel 2008 unit cash

  5. Slide 5: High margin diversified mining company

    High margin diversified mining company ARM Commodity EBITDA margins ARM EBITDA margin was 57% for F2008 Manganese Nkomati Platinum Coal Iron ore Chrome 0% 10% 20% 30% 40% 50% 60% 70% 12 months to June 2008 9 Investing in our future Exploration Project Development Steady state Declining /Feasibility

  6. Slide 6: Operational volume summary

    Operational volume summary Delivering on growth plans Operation ARM’s % Volumes Volumes Life of mine 100% basis ownership Operation stage Units F2008 F2007 % change (years) ARM Platinum Production Production Modikwa Platinum Mine 41.5 Steady-state PGM oz 294 721 274 174 7 30 on UG2 Two Rivers Platin

  7. Slide 7: 2 x 2010 growth strategy – 100% basis

    2 x 2010 growth strategy – 100% basis Nkomati Nickel Chrome Ore Nkomati Thousand Tonnes Million Tonnes Assmang 2,000 20 1,800 1,600 16 1,400 12 1,200 1,000 8 800 600 4 400 200 0 0 2005a 2006a 2007a 2008a 2009e 2010e 2011e 2012e 2005a 2006a 2007a 2008a 2009e 2010e 2011e 2012e 13 2 x 2010 growth strat

  8. Slide 8: Sufficient capacity to fund growth platforms

    Attributable capital expenditure by division Rm ARM Coal Two Rivers 6000 Modikwa Nkomati TEAL 4 836 ARM Ferrous 5000 4 235 4000 3 760 3000 2 779 2000 1000 0 F2008a F2009e F2010e F2011e ƒ Strong EBITDA of R7.2 billion generated for the 12 months under review ƒ All projects fully funded 15 Sufficient

  9. Slide 9: Safety / Nkomati Nickel Project

    Safety ƒ Absolute focus on safety over the past four years – ARM has performed significantly better than the industry ƒ ARM’s performance over past financial year has however been mixed: progress was made in certain areas, but opportunities for improvement exist in others ƒ Modikwa achieved 3 millio

  10. Slide 10: Khumani Iron Ore Mine / Goedgevonden Coal Project

    Khumani Iron Ore Mine Khumani Iron Ore Mine is 50% owned by ARM and 50% by Assore 8.4 mtpa construction 10 mtpa construction to be complete completed 1Q 2009 Mine design allows for flexibility to produce Typical grade of products different percentages of product specification Lumpy 66%; Fines 65.0%

  11. Slide 11: Scorecard – ARM Platinum / ARM Ferrous

    Scorecard – ARM Platinum F2008 objectives F2008 performance F2009 objectives Modiwa Achieve steady-state production during F2008 Steady-state production level achieved on a Achieving full year of steady state production monthly basis in the latter part of F2008 at 330 000 PGM oz Complete a conceptua

  12. Slide 12: Scorecard – ARM Coal / TEAL

    Scorecard – ARM Coal F2008 objectives F2008 performance F2009 objectives Participating Coal Business (PCB) Maintain export sales volumes Export volumes flat Maintain export volumes Increase local sales volumes Local sales increased approximately 47% Maintain domestic sales but at per energy unit of

  13. Slide 13: Minerals resource/reserve summary

    Minerals resource/reserve summary Manganese (Measured and Indicated) (Proved and Probable) Mineral Resources Mineral Reserves Mt Mn% Fe% Mt Mn% Fe% Nchwaning No 1 Seam 137.7 44.7 8.83 115.3 44.7 8.83 No 2 Seam 185.2 42.5 15.4 - - - Gloria No 1 Seam 52.5 38.3 5.54 40.4 38.3 5.54 No 2 Seam 29.4 29.9 1

  14. Slide 14: ARM Ferrous – Manganese

    ARM Ferrous Manganese Manganese ore and alloys forms a significant part of ARM ARM Headline earnings Assmang Headline earnings Manganese division operating (Rand million, Attributable) (Rand million, 100%) Profit (Rand Million, 100%) % = ARM Ferrous as a percentage of ARM % = Manganese as a percenta

  15. Slide 15: World manganese ore producing countries

    World manganese ore producing countries Manganese Grade (%) 60 1 South Africa 4 Gabon 7 Australia 50 High grade (>44%) 40 3 India 9 Ghana 8 CVRD 5 China 30 2 Ukraine 20 6 Khazakstan 10 Medium to Low grade (<44%) 0 0 1 2 3 4 5 6 7 Production (2006) Bubble size denotes contained manganese reserve base

  16. Slide 16: Nchwaning and Cato Ridge global cost curve position

    Nchwaning estimated position on global cost curve Mn ore cash cost curve, FOB port basis, 2006 US$/dmtu 3.00 World average – $1.30/dmtu 2.50 2.00 1.50 1.00 Nchwaning 0.50 Assmang 0.00 0 2 4 6 8 10 12 Million tonnes Source: Hatch 31 Cato Ridge estimated position on global cost curve High Carbon Ferro

  17. Slide 17: Manganese ore producers and prices

    Manganese ore producers Mn Ore Production 2007 High Grade Mn Ore Production 2007 (gross tonnes) (gross tonnes) Ukraine 7% India 6% Gabon 9% South Africa 35% Brazil 5% Ghana 3%; ROW 3%; Kazakhstan 3%; Gabon 22% Mexico 1%; Georgia 1% Australia 13% Brazil 13% China 35% Australia 30% South Africa 14% So

  18. Slide 18: Manganese ore market summary

    Manganese ore market summary World Manganese Ore market balance (Contained Mn, Thousand tonnes) 1500 1000 500 0 -500 -1000 -1500 2003 2004 2005 2006 2007e 2008e 2009e 2010e 2011e 2012e Source: CRU Jan 2007 35 Limited potential for increased manganese ore supply Scope for change in manganese ore cont

  19. Slide 19: Outlook for manganese ore market

    Outlook for manganese ore market Increased consolidation in the market means more disciplined marketing ƒ Ukrainian, Georgian and Eastern European capacity now under Ukrainian ownership, particularly in Europe (Privat) ƒ Similar to Iron Ore producers Backward integration of steelmakers into manganes

  20. Slide 20: Outlook for manganese alloy market

    Outlook for manganese alloy market Increased raw material shortages ƒ Manganese ore – increased consolidation and control, amid a reducing resource ƒ Reductant - Coking Coal + 300% ƒ Labour – Specialised skills base ƒ Electricity Electricity shortages resulting in increased costs and volatile produc

  21. Slide 21: Platinum: supply versus demand analysis

    Platinum: supply versus demand analysis 2007a 2008e 2009e 2010e 2011e 2012e 2013e 2014e 2015e 2016e Platinum Price (US$ per oz) 1 331 1 675 1 550 1 625 1 650 1 575 1 500 1 450 1 520 1 566 Supply South Africa 5 035 5 000 5 250 5 500 5 775 6 064 6 367 6 685 7 020 7 371 Russia 910 920 918 946 974 1 006

  22. Slide 22: ARM Platinum operations location

    ARM Platinum operations location Northern Limb Eastern Limb Bushveld Complex Bushveld Complex Western Limb Bushveld Complex Polokwane Mokopane Stella Layered Intrusion Modikwa Burgersfort Two Rivers Lydenburg Sun City Nelspruit Machadodorp Pretoria Mafikeng Nkomati Johannesburg Kalplats Vryburg 100k

  23. Slide 23: ARM Platinum revenue contribution and operational summary

    ARM Platinum revenue contribution per commodity F2008 Platinum 34% Chrome 16% Palladium 6% Other 1% Rhodium 27% Copper 2% Nickel 14% 45 ARM Platinum operational summary Modikwa 12 months ended 30 June 100% Basis 2008 2007 % change Tonnes milled Mt 2.46 2.32 6 Cash cost R/tonne 538 476 ( 13) PGMs in

  24. Slide 24: ARM Platinum Sensitivity / PGM Market Outlook

    ARM Platinum Sensitivity Cash Operating Margin Exchange Rate (R / $) 8.50 9.50 10.50 Modikwa 16% 25% 32% Two Rivers 34% 40% 46% Nkomati 24% 33% 39% Commodity Prices Platinum $ / oz 1 050 Palladium $ / oz 200 Rhodium $ / oz 4 000 Nickel $/t 12 000 Chrome $/t 200 47 PGM Market Outlook Supply ƒ Banks a

  25. Slide 25: Questions

    ARM Platinum operating costs split F2008 Two River Modikwa Nkomati R340/tonne milled R538/tonne milled R339/tonne milled Consumables 48% Consumables 25% Consumables 32% Other 2% Other 16% Other 4% Power 3% Power 3% Power 4% Labour 47% Labour 56% Labour 60% Average contribution to the total cost Dies

African Rainbow Minerals — Non-Deal Roadshow (November 2008) on 6ix