Amarc Resources Ltd. · TSXV:AHR
Amarc Resources — Shareholder Meeting (September 2014)
38 slides from Amarc Resources's shareholder meeting presentation, Sep 19, 2014
Slide 1: Amarc Resources Ltd. Annual General Meeting
Amarc Resources Ltd. Focused on Making an Important Discovery IKE Copper‐Molybdenum‐Silver Project British Columbia Annual General Meeting September 19, 2014
Slide 2: Cautionary and Forward-Looking Statement Information
Cautionary and Forward‐Looking Statement Information This presentation includes certain statements that may be deemed ʺforward‐looking statementsʺ. All such statements, other than statements of historical facts that address exploration drilling, exploitation activities and other related events or de
Slide 3: Amarc – Corporate Strategy for 2014
Amarc – Corporate Strategy for 2014 Goal is to Make BC’s Next Major Mine Discovery Drill the IKE porphyry target to determine if it is a major bulk tonnage copper‐ molybdenum‐silver deposit If so, plan and initiate an effective and holistic corporate business plan to move IKE efficiently forward
Slide 4: Amarc – Capital Structure
Amarc – Capital Structure Listed TSXV: AHR OTCBB: AXREF Shares Issued 139 million Management Owns ~19% Working Capital $1.3 million An HDI Operated Company 4
Slide 5: HDI – A Leading Explorer, Developer & Operator in BC
HDI – A Leading Explorer, Developer & Operator in BC Hunter Dickinson Inc. has been successfully exploring, developing and operating mines in BC for over 25 years Legacy Projects Golden Bear Mine Mt. Milligan Mine Kemess Mine Amarc Resources Ltd. IKE Project Newton Project Constantia
Slide 6: IKE – Location and Infrastructure
IKE – Location and Infrastructure 50 Kilometres 6
Slide 7: Amarc Recognized that the IKE Property Hosts High Potential
IKE – An Important Size Deposit Target was Recognized in Late 2013 Amarc Recognized that the IKE Property Hosts High Potential to Discover an Important Cu‐Mo‐Ag Deposit within a Short Timeframe In late 2013 Amarc identified in the literature an impressive porphyry Cu‐Mo‐Ag system Three historica
Slide 8: IKE – Amarc Negotiated Favourable Property Acquisition Terms
IKE – Amarc Negotiated Favourable Property Acquisition Terms Amarc is the operator of the IKE Property under the terms of an Option Agreement executed July 2014 with two prospector vendors Amarc will acquire before November 30, 2015 a 100% interest in IKE by: Completing $1.86 million in explor
Slide 9: IKE – Project is Located 44 Kilometres Northwest of Gold Bridge
IKE – Project is Located 44 Kilometres Northwest of Gold Bridge Looking Westerly IKE Logging Operations Gold Bridge 9
Slide 10: IKE – Logging Operations are Located 20 Kilometres South of IKE
IKE – Logging Operations are Located 20 Kilometres South of IKE Looking Northerly IKE Logging Operations 10
Slide 11: A Proactive Approach to First Nations Engagement
IKE – A Proactive Approach to First Nations Engagement Amarc is committed to meaningful engagement with First Nations in our project areas Amarc is building positive relations with First Nations and a solid record of consultation to assist government in timely and fair regulatory decision‐making
Slide 12: HDI First Nations Agreements
IKE – HDI First Nations Agreements Since 2011, 11 agreements have been signed between Aboriginal groups and HDI companies across Canada for projects at various stages of development SKI KM LAX HA NATION Brigade TSAY KEH DENE FIRST NATION Taseko ST. MARY’S FIRST NATION ASSEMBLY OF FIRST NATIONS CHI
Slide 13: IKE – Outside Tsilhqot'in Proven Title and Rights Areas
IKE – Outside Tsilhqot’in Proven Title and Rights Areas Drill Permit located 50 km outside of Title Area Supreme Court declared Proven Rights were hunting and trapping of animals and birds for work, transport, food, clothing, shelter, crafts and cultural uses. Include the trading of skins and pelts
Slide 14: IKE – View Easterly Across Deposit Target and Surrounding Areas
IKE – View Easterly Across Deposit Target and Surrounding Areas Looking Easterly Drill Permit Target Area Granite Creek 14
Slide 15: IKE – From Granite Creek Looking East Across Historical Drill Trails
IKE – From Granite Creek Looking East Across Historical Drill Program Trails at Target Area Potential Major Porphyry Cu‐Mo‐Ag Deposit Drill Permit Granite Creek 15
Slide 16: Extensive Mineralized Porphyry System is Evident
IKE – Extensive Mineralized Porphyry System is Evident Looking Easterly Hole 11‐1 Hole 81‐2 Hole 11‐2 16
Slide 17: "Bulls Eye" Airborne Geophysical Responses Over Target
IKE – “Bulls Eye” Airborne Geophysical Responses Over Target Aeromagnetic Survey ZTEM Survey 17
Slide 18: Wide-spaced Historical Drill Holes Indicate Major Discovery Potential
IKE – Wide‐spaced Historical Drill Holes Indicate Major Discovery Potential Looking Northwesterly Hole 11‐1 OPEN Talus Covered Area WEST EAST Hole 81‐2 OPEN OPEN Hole 11‐2 Three Key Historical Holes OPEN 18
Slide 19: Three Key Historical Drill Holes Indicate Expansion Potential
IKE – Three Key Historical Drill Holes Indicate Expansion Potential Looking Southeasterly Hole 81‐1 183m @ 0.16% Cu + 0.004% Mo OPEN OPEN EAST Hole 11‐2 WEST Talus Covered Area Hole 81‐2 Hole 11‐1 OPEN OPEN 19
Slide 20: Three Key Drill Holes Intercepted Significant Cu-Mo-Ag Mineralization
IKE – Three Key Drill Holes Intercepted Significant Cu‐Mo‐Ag Mineralization A A1 Looking East NORTH SOUTH OPEN OPEN OPEN Copper equivalent calculated with: $3/lb copper, $12/lb molybdenum, $20/oz silver. Copper equivalent for holes 11‐1 and 11‐2 used copper, molybdenum, and silver. Copper equivalent
Slide 21: Three Key Drill Holes Intercepted Significant Cu-Mo-Ag Mineralization
IKE – Three Key Drill Holes Intercepted Significant Cu‐Mo‐Ag Mineralization Hole Incl. From (m) To (m) Interval (m) Cu (%) Mo (%) Ag (g/t) *CuEq (%) 158 408 250 0.27 0.018 1.8 0.36 11‐1 lncl. 226 408 182 0.31 0.022 1.9 0.42 and 266 324 58 0.39 0.031 1.9 0.53 20 267 247 0.22 0.020 2.3 0.32 Incl. 62 1
Slide 22: A Total of 15 Historical Holes Were Drilled on the Permit Area
IKE – A Total of 15 Historical Holes Were Drilled on the Permit Area Looking LookingEastEast NORTH SOUTH 22
Slide 23: Mainly Shallow Historical Holes Confirm an Extensively Mineralized Porphyry System
IKE – These Mainly Shallow Historical Holes Confirm an Extensively Mineralized Porphyry System * Copper equivalent calculated Hole # Incl. From (m) To (m) Interval (m) Cu (%) Mo (%) Ag (g/t) *CuEq (%) with: $3/lb copper, $12/lb molybdenum, $20/oz silver. A‐1 20 102 82 0.26 0.007 0.28 Copper equivale
Slide 24: Soil Geochemical Surveys Indicate Major Cu-Mo-Ag Porphyry System
IKE – Soil Geochemical Surveys Indicate Major Cu‐Mo‐Ag Porphyry System Open to Expansion OPEN WEST OPEN EAST OPEN OPEN 500 Metres 24
Slide 25: Important Cu-Mo-Ag Porphyry System Open to Expansion
IKE – Important Cu‐Mo‐Ag Porphyry System Open to Expansion WEST EAST Section A’‐A View 220 Metres 25
Slide 26: Planned Drilling – Section A-A1
IKE – Planned Drilling – Section A‐A1 A A1 Looking East NORTH SOUTH OPEN OPEN OPEN Copper equivalent calculated with: $3/lb copper, $12/lb molybdenum, $20/oz silver. Copper equivalent for holes 11‐1 and 11‐2 used copper, molybdenum, and silver. Copper equivalent for holes 81‐2 and 81‐1 used copper a
Slide 27: Planned Drilling – Section B-B1
IKE – Planned Drilling – Section B‐B1 B B1 Looking North E WEST OPEN EAST OPEN OPEN Copper equivalent calculated with: $3/lb copper, $12/lb molybdenum, $20/oz silver. Copper equivalent for holes 11‐1 and 11‐2 used copper, molybdenum, and silver. Copper equivalent for holes 81‐2 and 81‐1 used copper
Slide 28: Planned Drilling – Section C-C1
IKE – Planned Drilling – Section C‐C1 C C1 Looking North F WEST EAST OPEN OPEN OPEN Copper equivalent calculated with: $3/lb copper, $12/lb molybdenum, $20/oz silver. Copper equivalent for holes 11‐1 and 11‐2 used copper, molybdenum, and silver. Copper equivalent for holes 81‐2 and 81‐1 used copper
Slide 29: Planned Drilling – Section D-D1
IKE – Planned Drilling – Section D‐D1 D D1 Looking North H WEST EAST OPEN OPEN Copper equivalent calculated with: $3/lb copper, $12/lb molybdenum, $20/oz silver. Copper equivalent for holes 11‐1 and 11‐2 used copper, molybdenum, and silver. Copper equivalent for holes 81‐2 and 81‐1 used copper and m
Slide 30: BC Porphyry Copper Mines and Projects
IKE – BC Porphyry Copper Mines and Projects Infrastructure! Infrastructure! Infrastructure! 30
Slide 31: BC Porphyry Copper Mines Host CuEQ Grades Ranging From 0.32% - 0.54%
IKE – BC Porphyry Copper Mines Host CuEQ Grades Ranging From 0.32% ‐ 0.54% RESOURCES AND RESERVES AT SELECTED BC MINES AND PROJECTS Name Million tonnes Cu % Mo % Au g/t Ag g/t *CuEQ% Red Chris1 288 0.37 ‐ 0.28 ‐ 0.54 New Prosperity2 831 0.23 ‐ 0.41 ‐ 0.48 Mt. Polley3 87 0.29 ‐ 0.30 0.4 0.48 Morrison
Slide 32: Porphyry Copper Deposits Often Occur in Clusters
IKE – Porphyry Copper Deposits Often Occur in Clusters Highland Valley Copper Size and Distribution of Mineralized Zones 32
Slide 33: Amarc has Acquired Mineral Tenures over the District
IKE – Amarc has Acquired Mineral Tenures over the District 33
Slide 34: Amarc – Now Nearing the Key Point of Entry for Investors
Amarc – Now Nearing the Key Point of Entry for Investors Lifecycle of a Mining Share 34
Slide 35: Contact Information
Contact Information Investor Relations 15th Floor Phone: 604‐684‐6365 1040 West Georgia Street Fax: 604‐684‐8092 Vancouver, BC TF: 1‐800‐667‐2114 Canada V6E 4H1 Email: info@hdimining.com Website: www.amarcresources.com 35
Slide 36: Appendices
Appendices 36
Slide 37: References
References 1. Greg Gillstrom P.Eng., Raj Anand, M.Eng. P.Eng., Steve Robertson, P.Geo., “2012 Technical Report on the Red Chris Copper-Gold Project”, February 14, 2012 2. Scott Jones, P.Eng., “Technical Report on the 344 million tonne Increase in Mineral Reserves at the Prosperity Gold-Copper Projec
Slide 38: Amarc – Team Has a Track Record of Success
Amarc – Team Has a Track Record of Success Robert Dickinson Ronald W. Thiessen (Executive Chairman) (President , CEO and Director) Bob Dickinson is an economic geologist and mining Ron Thiessen is a Chartered Accountant with professional executive who has been active in mineral exploration for over
Amarc Resources — Shareholder Meeting (September 2014) on 6ix