Dlp Resources, Inc. · TSXV:DLP
Dlp Resources — Investor Presentation (March 2026)
32 slides from Dlp Resources's investor presentation, Mar 16, 2026
Slide 1: Discovering Copper–Molybdenum Porphyry Giants in Southern Peru
Investor Presentation A U R O R A Looking South Discovering Copper–Molybdenum Porphyry Giants in Southern Peru ❑ Aurora (Cu-Mo-Ag) – Advancing to Preliminary Economic Assessment ❑ Esperanza (Cu-Mo) - 13,900 Ha located ~35 km SE of the Cerro Verde Copper-Molybdenum Mine March 2026 dlpresourcesinc.com
Slide 2: Cautionary Note Regarding Forward Looking Statements
Cautionary Note Regarding Forward Looking Statements Certain information contained in this document may be forward-looking statements or forward-looking information (referred to as “forward-looking Copper statements”). Forward-looking statements are often, but not always, identified by the use of wo
Slide 3: Highly Experienced Team
Highly Experienced Team AURORA LEADERSHIP TEAM Ian Gendall William (Bill) Bennett Scott Davis Robin Sudo Corporate CEO & President Chairman CFO Office & Land Mgr. / Corp. Secretary Credited with discovery of Bill was a successful small business Experience working with public Previously worked for Co
Slide 4: Aurora Location
AURORA Location Copper Molybdenum TSXV: DLP / OTCQB: DLPRF /FSE: J8C 4
Slide 5: Aurora History Timeline
2001 2005 2015 Bear Creek Vena Resources Ian Gendall: AURORA 2001 drilled 6 2005 drilled 7 Visited Aurora in Holes – 1,256m. Holes – 2,360m. 2015. Project Average depth Average Depth was with Focus History Timeline 251m 337m Ventures Copper 2024 2023 2022 2021 Effective Date of DLP Drilled DLP Drill
Slide 6: Community First
AURORA Community Agreement DLP employs 20-26 Over 210 people were 90% of workers Invested ~US$1,012,558 in in place to 2026 people on a rotation employed on 2025 drill from Parobamba Community employment, projects Community First basis program and initiatives (2022-2025) Copper Molybdenum TSXV: DLP
Slide 7: Cu-Mo-Ag Targeting Copper–Molybdenum Porphyry Giant in the Central Andes
AURORA Cu-Mo_Ag Targeting Copper–Molybdenum Porphyry Giant in the Central Andes Copper LO CATI ON > In the under explored Miocene–Pliocene Porphyry belt in proximity to some of the world’s largest deposits OWNERSHIP > Concession is 12,500 Ha , DLP owns 12,100 Ha and has an option over 400 Ha to buy
Slide 8: Infrastructure Options
AURORA Infrastructure Options Copper Road Pipeline Rail Shipping Molybdenum TSXV: DLP / OTCQB: DLPRF /FSE: J8C 8
Slide 9: 2025 Program
AURORA 2025 Program Completed US$5.5 million Financing on June 26, 2025 Copper 5 Drill holes completed in 2025 for 4308.6m • Expand & Infill resources • Provide additional metallurgical samples • Improve knowledge of copper porphyry area • Update Resource • Complete Preliminary Economic Assessment (
Slide 10: Inferred Resource
AURORA Inferred Resource Copper Geology > 1.05 Billion tonne Inferred Maiden Resource @ 0.44% CuEq (0.20% Cu, 0.05% Mo, 2.4g/t Ag) (AMC Consulting). > ~10Blbs CuEq (4.65Blbs Cu, 1.1Blbs Mo, 80Moz Ag) using a $5.75/t NSR > Based on initial whittle pit design and favorable geometry, amenable to open p
Slide 11: Downhole Bar Graphs Section
AURORA NW SE Bar Graphs Downhole 3000m Section Copper 2500m A25-023 2000m Molybdenum A25-025 A25-027 A25-024 TSXV: DLP / OTCQB: DLPRF /FSE: J8C 11
Slide 12: Geological Model & Proposed Pit Model
AURORA Geological Model & Proposed Pit Model Copper Looking Northeast Molybdenum TSXV: DLP / OTCQB: DLPRF /FSE: J8C 12
Slide 13: Summary: Key aspects of Aurora
AURORA Summary Key aspects of Aurora Rare and large polymetallic discovery (initial Copper Resource ~40% copper and 60% Moly) located in Southwestern, Peru Maiden Resource of over 1 Billion tonnes of Inferred Resources at 0.44% Copper Equivalent grade* with very high- grade Moly and very homogenous
Slide 14: Moly Comparison
Aurora Sample Moly-rich part of the deposit ranges between 0.1% and 0.3% Mo rivals Freeport’s Climax mine with a grade of 0.15%. AURORA Moly Comparison Copper > Moly production is ~600-650 M lbs. / annum > Moly demand in 2024 was 704.8 M lbs with expected growth rate of CAGR 3.7%* > Primary producti
Slide 15: Capital Structure
AURORA & ESPERANZA 10% - Institutions Capital Structure Copper Shares (issued) 153,899,254 20% - Founders/BoD Warrants 48,670,771 70% - Retail Options 4,806,941 RSUs 2,972,173 PSUs 314,000 DSUs 4,618,145 Shares (FD) 210,281,284 Market Cap (C$M) $61 As of February 06,, 2026 Molybdenum TSXV: DLP / OTC
Slide 16: Aurora Project Evaluation
Typical Project Valuation Profile → EV /lb CuEq Note: Ev/lb CuEq = Enterprise value per pound of copper equivalent AURORA ~ 10 Billion lbs of CuEq Aurora Project Evaluation US $2.13 / Cad $3.00 Copper $1.33 / $1.88 $0.71 / $1.00 March 2025 $0.46 / $0.65 1.05 Billion tonne Inferred Maiden Resource @
Slide 17: Esperanza Greenfields Porphyry Cu-Mo Project Summary
E s p e ra n z a E s p e ra n z a Greenfields Porphyr y Summary Cu-Mo Project > The new grassroots 13,900 Ha Esperanza Cu-Mo project (blue) is located ~35 km SE of the Cerro Verde Mine in Arequipa Less than 10km south of E29’s Flor de Cobre Project & 10km NE of the Fortesque Arikepay porphyry copper
Slide 18: Esperanza Location
E s p e ra n z Looking a South Location LO CATI ON > In the underexplored Late Cretaceous Porphyry belt in proximity to some of the world’s largest deposits > 72 km from Arequipa City with paved and unpaved roads > < 10km from Power Grid > OWNERSHIP Concessions of 13,900 Ha, DLP owns 100% Ta r g e t
Slide 19: Structural Setting
E s p e ra n z Looking a South Structural Setting Hydrothermally altered + veined rocks TSXV: DLP / OTCQB: DLPRF /FSE: J8C 19
Slide 20: Reduced to Pole
E s p e ra n z Looking a South Reduced to Pole TSXV: DLP / OTCQB: DLPRF /FSE: J8C Plan View of Reduced to Pole Magnetic Data 20
Slide 21: Plan View of Geology and Geochemical Sampling
Plan View of Geology and Geochemical Sampling E s p e ra n z Looking a South Rock Chip Samples Inset below Trenching on CuOx Quartz Monzonite with pervasive tourmaline TSXV: DLP / OTCQB: DLPRF /FSE: J8C Quartz Monzonite with pervasive tourmaline 21
Slide 22: Plan View of Geology and Geochemical Sampling
Plan View of Geology and Geochemical Sampling E s p e ra n z Looking a South Rock Chip Samples TSXV: DLP / OTCQB: DLPRF /FSE: J8C 22
Slide 23: Section
E s p e ra n z Looking a South Section 23 TSXV: DLP / OTCQB: DLPRF /FSE: J8C
Slide 24: Rock Chip – Panel Samples
E s p e ra n z Looking a South Rock Chip – Panel Samples Trench From To Interval Description Cu (total) ID m m m % T1-026 0 54 54 Mineralized agglomerate 1.53 Includes 6 20 14 Mineralized agglomerate 1.88 Includes 42 52 10 Mineralized agglomerate 2.29 Trench From To Interval Description Cu (total) I
Slide 25: Rock Chip – Panel Samples
E s p e ra n z Looking a South Rock Chip – Panel Samples Trench From To Interval Description Cu (total) ID m m m % T5-026 0 66 66 Mineralized agglomerate 0.66 Includes 0 18 18 Mineralized agglomerate 0.98 Includes 40 58 18 Mineralized agglomerate 0.88 Trench From To Interval Description Cu (total) I
Slide 26: Esperanza Outcropping Geology
Esperanza Porphyry Copper-Molybdenum Project Looking SE E s p e ra n z Looking a South Outcropping Geology TSXV: DLP / OTCQB: DLPRF /FSE: J8C 26
Slide 27: Porphyry type veins: D-Veins
E s p e ra n z Looking a South Porphyry type veins D-Veins TSXV: DLP / OTCQB: DLPRF /FSE: J8C 27
Slide 28: Hydrothermal breccia with veinlets within clasts and cross-cutting
Hydrothermal breccia with veinlets both within clasts and cross-cutting clasts and matrix E s p e ra n z Looking a South Field Photos Quartz-Tourmaline hydrothermal breccia TSXV: DLP / OTCQB: DLPRF /FSE: J8C 28
Slide 29: Thank You – Contact Information
Contact Information Looking South T H A N K YO U C O N TACT Ian Gendall – CEO & President iangendall@dlpresourcesinc.com Tel: +1 604 897 7436 dlpresourcesinc.com TSXV: DLP / OTCQB: DLPRF / FSE: J8C TSXV: DLP / OTCQB: DLPRF /FSE: J8C 29
Slide 30: Appendices
AURORA Appendices Copper Appendices Molybdenum TSXV: DLP / OTCQB: DLPRF /FSE: J8C 30
Slide 31: Inferred Resource Notes
AURORA Cut-off (NSR) Resource Tonnage (Mt) CuEQ (%) Cu (%) Mo (%) Ag (g/t) Cu Metal Mo Metal Ag Metal Category (Mlb) (Mlb) (Moz) Inferred Resource Notes Copper $5.75/t Inferred 1,050 0.44 0.20 0.05 2.4 4,650 1,110 80 Notes: • Mineral Resources were prepared in accordance with the CIM Definition Stan
Slide 32: Optimisation Parameters
Optimisation Parameters Base Mining Costs Mining Costs $US / t mined $ 1.75 Incremental Mining Costs Incremental cost above reference bench per 10m 0.010 AURORA Incremental cost below reference bench per 10m 0.015 Ore Costs G&A $US / t processed $ 0.75 Optimization Parameters Copper Processing Cost